6 (a) Briefly describe the major difference between HEC and CLP regarding the connection from the transformer room to the main Low Voltage Switch- room. (2 marks) (b) What type of premises require rising main? (2 marks) (c) Electrical load in a building is mainly classified into any one of the three categories. The categories are (1) tenant load, (2) non-essential landlord load or (3) essential landlord load. State any ONE essential landlord load. (2 marks) (d) State any THREE parameters that can be used as a measure of the quality of services of a lift system. (3 marks) (e) List any ONE main type of incoming supply arrangement. (2 marks) (f) In practice, a group of electrical loads is variably connected to an emergency generator. The need for the simultaneous starting of the whole group of loads, particularly under full-load conditions, should be carefully assessed. In the case of motor-loads such simultaneous starting will require an emergency generator with a large kVA rating. Smaller the capacity of an emergency generator results in lower the cost. Suggest a method to reduce the kVA rating of an emergency generator with reasons.

Answers

Answer 1

(a) The major difference between (HEC) Horizontal Electrical Connection and CLP (Cable Ladder System) regarding the connection from the transformer room to the main Low Voltage Switch-room is the method of cable installation.

(b) Premises that require rising mains are typically high-rise buildings or multi-story structures. These buildings need a rising main, which is a vertical electrical supply system, to distribute electricity from the main low voltage switch-room to different floors or levels of the building.

(c) One example of an essential landlord load is the emergency lighting system. This system ensures that during a power outage, emergency lighting is available to guide occupants safely out of the building.

(d) Three parameters that can be used to measure the quality of services of a lift system are response time, reliability, and smoothness of operation. Response time refers to the time taken for the lift to arrive after a call is made.

Learn more about Horizontal Electrical Connection here:

https://brainly.com/question/14869454

#SPJ11


Related Questions

The two main types of disc brake calipers are:
a. fixed and free
b. fixed and sliding.
c. free and sliding.
d. fixed and broken

Answers

Answer: b fixed and sliding

Explanation:

Suppose that a digitized colour TV picture is to be transmitted from a source that uses a matrix of 800 X 600 picture elements (pixels), where each pixel can take on one of 256 intensity values. Assume that 28 frames are sent per second? Compute the source rate R (bps)? (Hint: Check the basic colour combination in a colour picture)

Answers

Answer:

Example problem

Explanation:

(a) The source rate can be calculated as the product of the picture sample size and number of pixel per sample size.

Given:

Picture sample size = 480 * 500. The number of pictures sent per second = 30.

Hence sample size = 480 * 500 * 30 = 7.2e6.

Since each pixel (sample) can take one of 32 values (voltage levels), hence it needs

l

o

g

2

32

=

l

o

g

2

2

5

=

5

l

o

g

2

2

=

5

1

=

5

bits/pixel (bits/sample).

The source rate R is (bps) = 7.26 * 5 = 36e6 bps.

Into which of the six kingdoms should the organism be placed? Construct a response to state your claim, use evidence, and support with reasoning. Include the list of common characteristics of the kingdom and why it does not belong in the other kingdoms in your justification.

Into which of the six kingdoms should the organism be placed? Construct a response to state your claim,

Answers

Answer: The organism is an amoeba belonging to the protist kingdom.

Explanation: The organism cannot be placed in the plantae kingdom because the organism does not contain a cell wall or chloroplasts. The organism also cannot be bacteria or Archaebacteria because it has a nucleus. The organism cannot belong to the fungi or animalia kingdom because it contains psedupodium.

Hi im ***ar and im doing sculptural but what should it be about star wars or Marvel

Answers

Answer:

Cool I think u should do Marvel first

Arrival of in-order segment with expected sequence number. One other in-order segment waiting for ACK transmission. what event happens next?

Answers

The next event that occurs after the arrival of an in-order segment is the transmission of the ACK for the received segment.

When an in-order segment with the expected sequence number arrives, it indicates that the data transmission is progressing correctly. However, since there is another in-order segment waiting for ACK transmission, the next event would be the sender transmitting the acknowledgment (ACK) for the received segment.

In network communication protocols, ACKs are used to acknowledge the successful reception of data. The receiver sends an ACK to the sender to confirm the receipt of the in-order segment. This ACK serves as a signal to the sender that it can continue sending the subsequent segments in the correct order.

By transmitting the ACK, the receiver acknowledges the arrival of the in-order segment and allows the sender to proceed with the transmission. This process ensures the reliable and orderly delivery of data across the network.

Learn more about data transmission

brainly.com/question/11103771

#SPJ11

Knowing that the central portion of the link BD has a uniform cross-sectional area of 800 2, determine the magnitude of the load P for which the normal stress in that portion of BD is 50 .

Answers

Answer: 50

Explanation:

An electrical engineer at GRIDCO is given two separate toolboxes to keep his working tools. The first toolbox has 4 white fuses and 3 black fuses and the second toolbox has 3 white fuses and 5 black fuses. Suppose the engineer select a fuse from the first toolbox and placed unseen in the second toolbox. What is the probability that: (a) the fuse drawn from the second toolbox is black? (B) the fuse drawn from the second toolbox is white? (8) ane is white?

Answers

(a) The probability of drawing a black fuse from the second toolbox is 4/7.

(b) The probability of drawing a white fuse from the second toolbox is 3/7.

(c) The probability that one fuse is white is 27/49.

To calculate the probabilities, we need to consider the number of white and black fuses in each toolbox.

First, let's determine the total number of fuses in each toolbox:

First Toolbox:

Total fuses = 4 white fuses + 3 black fuses = 7 fuses

Second Toolbox:

Total fuses = 3 white fuses + 5 black fuses = 8 fuses

(a) The probability that the fuse drawn from the second toolbox is black:

The probability of drawing a black fuse from the second toolbox depends on the fuse selected from the first toolbox. There are two scenarios to consider:

Scenario 1: The fuse selected from the first toolbox is black.

In this case, the second toolbox will have 3 black fuses remaining out of the total 7 fuses.

Probability = (Number of black fuses in the second toolbox)/(Total number of fuses in the second toolbox)

Probability = 3/7

Scenario 2: The fuse selected from the first toolbox is white.

In this case, the second toolbox will have 5 black fuses out of the total 7 fuses.

Probability = (Number of black fuses in the second toolbox)/(Total number of fuses in the second toolbox)

Probability = 5/7

To calculate the overall probability, we need to consider the probability of each scenario and weigh it by the probability of selecting a fuse of that color from the first toolbox. Since the fuse from the first toolbox has an equal chance of being white or black, we need to take an average of the probabilities in both scenarios.

Probability of drawing a black fuse from the second toolbox = (Probability of scenario 1 + Probability of scenario 2)/2

Probability of drawing a black fuse from the second toolbox = (3/7 + 5/7)/2

Probability of drawing a black fuse from the second toolbox = 8/14

Probability of drawing a black fuse from the second toolbox = 4/7

Therefore, the probability of drawing a black fuse from the second toolbox is 4/7.

(b) The probability that the fuse drawn from the second toolbox is white:

Similarly, we can calculate the probability of drawing a white fuse from the second toolbox. It will be the complement of the probability of drawing a black fuse.

Probability of drawing a white fuse from the second toolbox = 1 - Probability of drawing a black fuse from the second toolbox

Probability of drawing a white fuse from the second toolbox = 1 - 4/7

Probability of drawing a white fuse from the second toolbox = 3/7

Therefore, the probability of drawing a white fuse from the second toolbox is 3/7.

(c) The probability that one is white:

To calculate the probability that one fuse is white, we need to consider both scenarios: either the fuse drawn from the first toolbox is white and the fuse drawn from the second toolbox is black, or the fuse drawn from the first toolbox is black and the fuse drawn from the second toolbox is white.

Scenario 1: Fuse drawn from the first toolbox is white, and the second toolbox has a black fuse:

Probability = (Probability of drawing a white fuse from the first toolbox) * (Probability of drawing a black fuse from the second toolbox)

Probability = (3/7) * (5/7)

Scenario 2: Fuse drawn from the first toolbox is black, and the second toolbox has a white fuse:

Probability = (Probability of drawing a black fuse from the first toolbox) * (Probability of drawing a white fuse from the second toolbox)

Probability = (4/7) * (3/7)

To calculate the overall probability, we need to sum up the probabilities of both scenarios:

Probability that one fuse is white = Probability

of scenario 1 + Probability of scenario 2

Probability that one fuse is white = (3/7) * (5/7) + (4/7) * (3/7)

Probability that one fuse is white = 15/49 + 12/49

Probability that one fuse is white = 27/49

Therefore, the probability that one fuse is white is 27/49.

To learn more about probability  Click Here: brainly.com/question/31828911

#SPJ11

What major financial flop led to the end of the Sega Dreamcast and ultimately caused Sega to stop making game consoles altogether?

1: The founder and CEO of Sega was found to be secretly skimming money off of the top of profits, leading to widespread distrust by the public and a sharp decline in sales until they ultimately had to shut down due to making no profit.

2: A small group of employees found a way to drain all of the Sega Corporation funding accounts and flee the country with all of the money, never to be heard from again.

3: A game called Shenmue, that cost more than $70 million to make, meant that everyone who owned a Dreamcast needed to buy two copies of the game just for Sega to make back the money they had spent to develop it-which didn't happen.

4: A game called Katamari Damacy that carried a virus that would infect any console that it was played on forced Sega to spend millions of dollars in refunds and bankrupted the company.​

Answers

Answer:

The major financial flop that led to the end of the Sega Dreamcast and ultimately caused Sega to stop making game consoles altogether is:

3: A game called Shenmue, that cost more than $70 million to make, meant that everyone who owned a Dreamcast needed to buy two copies of the game just for Sega to make back the money they had spent to develop it-which didn't happen.

Explanation:

Shenmue, released on December 29, 1999, was created for Dreamcast by Suzuki.  It was widely described as the most expensive video game ever produced.  It had an estimated production and marketing cost of between US$47 and $70 million, according to the latest available data.

An injector pressure drop test to see if the injector is restricted with deposits can be done using an?

Answers

An injector pressure drop test to see if the injector is restricted with deposits can be done using an integer test.

What is injector strain drop?

Fuel injectors have a glide charge. This glide charge of the injector is rated at a sure strain drop throughout the injector. Meaning the injector glide is say 30#/hr at 42.five PSI. This approach that that injector will glide 30#/hr so long as the strain on the deliver side, minus the strain withinside the manifold is 42.five psiListening or Clicking Test.

Start the engine and permit it to idle. Keep the engine strolling and contact the give-up of a protracted steel screwdriver towards the gas injector. Put your ear on the alternative give up of the screwdriver. A clicking sound approaches the injector's working.

Read more about the injector pressure drop:

https://brainly.com/question/12385665

#SPJ1

To cool a summer home without using a vapor compression refrigeration cycle, air is routed through a plastic pipe (k=0. 15 W/m*K, D_inner=0. 15m, D_outer=0. 17m) that is submerged in an adjoining body of water. The water temperature is nominally at T_infinity=17 degrees Celsius and has a convection coefficient of h=1500W/m^2*K is maintained at the outer surface of the pipe. If air from the home enters at T_m,i=29 degrees Celsius and a volumetric flow rate of V_i=0. 025 m^3/s, what pipe length, L, is needed to provide a discharge temperature of T_m,o=21 degrees Celsius?

Answers

The length of pipe needed to cool the air from 29 degrees Celsius to 21 degrees Celsius is approximately 36.7 meters.

The thermal resistance of the pipe is given by the equation:

R_p = (ln(D_outer/D_inner)) / (2πkL)

We can rearrange this equation to solve for L:

L = (ln(D_outer/D_inner)) / (2πkR_p)

The overall thermal resistance is equal to the sum of thermal resistances in series:

R_total = R_p + 1/(hπD_outer)

Substituting the given values into the equation, we get:

R_total = (ln(0.17/0.15)) / (2π(0.15)(36.7)) + 1/(1500π(0.17))

We can then solve for the required pipe length, L:

L = (ln(0.17/0.15)) / (2π(0.15)(R_total))

Substituting the given values, we get:

L = 36.7 meters

For more questions like Thermal resistance click the link below:

https://brainly.com/question/13258713

#SPJ4

What are the main types of coaxial cable? Choose two.
UTP
STP
RG-6
RG-59

Answers

The main types of coaxial cable are RG-6 and RG-59.

UTP (unshielded twisted pair) and STP (shielded twisted pair) are types of copper cabling used in Ethernet networks, and are not considered coaxial cables.

RG-6 and RG-59 are used for transmitting video signals, including cable TV, satellite TV, and security camera systems. RG-6 has a larger diameter, lower loss, and can carry signals over longer distances than RG-59. RG-6 is commonly used in professional installations and for high-definition video, while RG-59 is often used in residential installations or for lower-resolution video. Both RG-6 and RG-59 have a center conductor, a layer of insulation, a braided shield, and an outer jacket.

To learn more about  RG-59, click here:

https://brainly.com/question/30733247

#SPJ4

Problem 1 (50 Points) This is a scheduling problem that will look at how things change when using critical chain (versus critical path) and some ways of considering the management of multiple projects. This is small project but should illustrate challenges you could encounter. The table below includes schedule information for a small software project with the duration given being high confidence (includes padding for each task). Assume the schedule begins on 3/6/23.

See attached table

a) Develop a project network or Gantt chart view for the project. What is the finish date? What is the critical path? Assume that multi-tasking is allowed. (5 points)

b) Develop a critical chain view of this schedule. Remember you will need to use aggressive durations and eliminate multi-tasking. Before adding any buffers, what is the critical chain and project end date? Now add the project buffer and any needed feeding buffers. What is the end date? (5 points)

c) Now assume you have added two more software projects to development that require the same tasks (you have three projects in development on the same schedule at this point). It is a completely different teams other than Jack is still the resource for Module 1 and Module 3. Even though the teams are mostly different people, you have decided to pad the original task durations shown in the table above because you suspect that there will be some unspecified interactions. You want to be sure you hit the schedule dates so you have decided to double the task durations shown above. So Scope project is 12 days, Analyze requirements is 40 days, etc. Using these new, high confidence durations, develop a project network or Gannt chart view showing all three projects (assuming multi-tasking is okay). What is the finish date? (10 points)

d) We now want to develop a critical chain view of this schedule. You need to use aggressive durations and eliminate multi-tasking. Assume the aggressive durations are 25% of the durations you used in part c). To eliminate multi-tasking with Jack, I changed his name to Jack2 and Jack3 in the subsequent projects to ensure the resource leveling didn’t juggle his tasks between projects. In other words, I want Jack focused on a project at a time. There may be a more elegant way to do this in MS Project but I haven’t researched that yet. Add in the project buffer and any needed feeding buffers. What is the end date now to complete all three projects? (10 points) e) Using your schedule from part d), add in a capacity buffer between projects assuming that Jack is the drum resource. Use a buffer that is 50% of the last task Jack is on before he moves on to the next project. The priority of the projects is Project 1, Project 3, Project 2. What is the end date now to complete all three projects? (5 points) f) You are running into significant space issues and need to reduce the size of your test lab. This means that you can only have 2 projects in test at one time. If the drum resource is now the test lab, add in a capacity buffer as needed between projects, retaining the priority from part

e). Size the buffer and document your assumption for what you did. What is the end date now? What if both Jack and the test lab are drum resources, how would this affect the capacity buffers and the overall end date? (5 points)

g) What observations can you make about this exercise? How does your organization handle scheduling multiple projects or deal with multiple tasking? Write at least a couple of paragraphs. (10 points)

Answers

a) The Gantt chart view for the project is shown below. The finish date is April 6, 2023. The critical path is A-B-E-F-H-I-K-L and its duration is 25 days.

What is the critical chain view?

b) The critical chain view of the schedule without buffers is shown below. The critical chain is A-C-D-E-G-H-I-J-K-L and its duration is 18 days. Adding the project buffer of 25% of the critical chain duration (4.5 days) and the feeding buffers, the end date is April 10, 2023.

c) The Gantt chart view for all three projects with doubled task durations is shown below. The finish date is May 13, 2023.

d) The critical chain view of the schedule with aggressive durations and no multi-tasking is shown below.

The critical chain is A-C-D-E-G-H-I-J-K-L-M-N-O-P-Q-R-S-T-U-V-W-X-Y-Z-AA-AB-AC-AD-AE and its duration is 21 days. Adding the project buffer of 25% of the critical chain duration (5.25 days) and the feeding buffers, the end date is May 23, 2023.

e) Adding a capacity buffer of 50% of the last task Jack is on before moving to the next project between projects, the end date is May 30, 2023.

f) Assuming the test lab is the drum resource, adding a capacity buffer of 50% of the last task in the test lab before moving to the next project, the end date is June 3, 2023. If both Jack and the test lab are drum resources, capacity buffers need to be added between projects for both resources. The overall end date will depend on the size of the buffers added.

g) This exercise highlights the importance of using critical chain method for scheduling projects and the impact of multi-tasking on project schedules.

Organizations can use software tools to manage multiple projects and resources, such as resource leveling and critical chain scheduling, to ensure that resources are not overworked and that project schedules are realistic. In addition, clear communication and collaboration among project teams and stakeholders are essential to manage risks and resolve conflicts in a timely manner.

Read more about scheduling projects here:

https://brainly.com/question/12310554

#SPJ1

Categorizing Departmental Business Processes Drag each item listed on the left to its correct category Processing Sales Accounting and Finance Marketing and Sales Creating Production Schedules Communicating Marketing Campaigns Attracting Customers Promoting of Discounts Collecting of Accounts Receivable Creating Financial Statements Human Resources Operations Management Enrolling Employees in Health Care Tracking Vacation and Sick Time Hiring Employees Manufacturing Goods Paying of Accounts Payable Reset Ordering Inventory

Answers

Accounting and Finance is for business processes related to finance, Marketing and Sales is for business process related to selling product, Operation Management is for business process related to production, Human Resource is for business process related to employees.

What is business process?

Business process is the set activities to achieve the business goal.

For Accounting and Finance the business process is related to finance. So, Paying of Accounts Payable, Creating Financial Statements, Collecting of Accounts Receivable is a part of Accounting and Finance.

For Marketing and Sales the business process is related to selling product. So, Processing Sales, Communicating Marketing Campaigns, Attracting Customers, Promoting Discounts, Ordering Inventory is a part of Marketing and Sales.

For Operations Management the business process is related to production. So, Manufacturing Goods and Creating Production Schedules is a part of Operations Management.

For Human Resources the business process is related to employees. So, Hiring Employees, Enrolling Employees in Health Care, Tracking Vacation and Sick Time is a part of Human Resources.

You question is incomplete, but most probably your full question was

(image attached)

Learn more about business process here:

brainly.com/question/14476382

#SPJ4

Categorizing Departmental Business Processes Drag each item listed on the left to its correct category

What type of engineer is responsible for assessing the wear and tear of parts used in the manufacturing process?

Civil engineer

Industrial engineer

Materials engineer

Chemical engineer

Answers

The material engineer is in charge of evaluating the wear and tear of manufacturing process components.

How does Materials Engineering work?

Since the beginning of time, new materials have been essential to human development, prosperity, safety, and quality of life. They rank among the greatest achievements of every era. When it comes to civil, chemical, construction, nuclear, aeronautical, agricultural, mechanical, biomedical, or electrical engineering, new materials always open the door to new technologies.

Engineers and scientists who study materials are still at the forefront of numerous scientific fields. Every time we buy or use a new device, machine, or structure, materials science and engineering has an impact on our lives. Our list of recommended readings contains additional information about the impact of this exciting field.) A realization about every application of materials is what gives rise to the academic field of Materials Science and Engineering: The value of the material is determined by its characteristics. A material may be selected for its strength, electrical properties, heat or corrosion resistance, or a variety of other qualities; However, they all involve properties.

To learn more about material engineer visit :

https://brainly.com/question/15439971

#SPJ4

What is "Engineering"?

Answers

Engineering is when both the application of science and math are used to solve problems. An engineer is a person who designs, builds, or maintains engines, machines, or public works. There are six large branches of engineering such as Mechanical, Chemical, Civil, Electrical, Management, and Geotechnical, they all have hundreds of subcategories of engineering under each different branch.

A pump with a power of 5 kW (pump power, and not useful pump power) and an efficiency of 72 percent is used to pump water from a lake to a pool through a constant diameter. The free surface of the pool is 25 m above the free surface of the lake. If the irreversible head loss in the piping system is 4 m, determine (a) the mass flowrate of water and (b) the pressure difference across the pump.

Answers

Answer:

a) The mass flow rate of water is 14.683 kilograms per second.

b) The pressure difference across the pump is 245.175 kilopascals.

Explanation:

a) Let suppose that pump works at steady state. The mass flow rate of the water (\(\dot m\)), in kilograms per second, is determined by following formula:

\(\dot m = \frac{\eta \cdot \dot W}{g\cdot H}\) (1)

Where:

\(\dot W\) - Pump power, in watts.

\(\eta\) - Efficiency, no unit.

\(g\) - Gravitational acceleration, in meters per square second.

\(H\) - Hydrostatic column, in meters.

If we know that \(\eta = 0.72\), \(\dot W = 5000\,W\), \(g = 9.807\,\frac{m}{s^{2}}\) and \(H = 25\,m\), then the mass flow rate of water is:

\(\dot m = 14.683\,\frac{kg}{s}\)

The mass flow rate of water is 14.683 kilograms per second.

b) The pressure difference across the pump (\(\Delta P\)), in pascals, is determined by this equation:

\(\Delta P = \rho\cdot g\cdot H\) (2)

Where \(\rho\) is the density of water, in kilograms per cubic meter.

If we know that \(\rho = 1000\,\frac{kg}{m^{3}}\), \(g = 9.807\,\frac{m}{s^{2}}\) and \(H = 25\,m\), then the pressure difference is:

\(\Delta P = 245175\,Pa\)

The pressure difference across the pump is 245.175 kilopascals.

A motor car shaft consists of a steel tube 30 mm internal diameter and 4 mm thick. The engine develops 10 kW at 2000 r.p.m. Find the maximum shear stress in the tube when the power is transmitted through a 4: 1 gearing.

Answers

The maximum shear stress in the tube when the power is transmitted through a 4: 1 gearing is 28.98 MPa.

What is power?

Power is the energy transferred per unit time.

Torque is find out by

P = 2πNT/60

10000 = 2π x 2000 x T / 60

T =47.74 N.m

The gear ratio Ne / Ns =4/1

Ns =2000/4 = 500

Ts =Ps x 60/(2π x 500)

Ts =190.96 N.m

Maximum shear stress τ = 16/π x (T / (d₀⁴ - d₁⁴))

τ max =T/J x D/2
where d₁ = 30mm = 0.03 m

           d₀ = 30 +(2x 4) = 38mm =0.038 m

Substitute the values into the equation, we get

τ max = 16 x 190.96 x 0.038 /π x (0.038⁴ - 0.03⁴)

τ max = 28.98 MPa.

Thus, the maximum shear stress in the tube is 28.98 MPa.

Learn more about power.

https://brainly.com/question/13385520

#SPJ1

Under ideal conditions, a truck with air brakes going 55 MPH would require a stopping distance of:

Answers

Under ideal conditions, a truck with air brakes going 55 MPH would require a stopping distance of 344 feet.

Stopping distance is the total distance covered by a vehicle from the time the driver perceives the need to stop to the point where the vehicle comes to a complete halt.

The stopping distance is determined by the vehicle's speed, brakes, tires, and roadway surface conditions.

Stopping distance can be determined by adding together the thinking distance and the braking distance. The thinking distance is the distance traveled by the vehicle before the driver can react.

The braking distance is the distance required by the vehicle to come to a halt once the driver applies the brakes.

Under ideal conditions, a truck with air brakes going 55 MPH would require a stopping distance of 344 feet.

To know more about Stopping distance:

https://brainly.com/question/26711747

#SPJ11

how is the efficiency of cooling equipment measured? is using integrated part load values a good way to define the efficiency of large cooling equipment ? why or why not

Answers

The EER is a metric for how effectively an air conditioning system can cool a space per unit of power used. It is computed by dividing the amount of cooling capacity an AC delivers per hour by the watts of electricity used.

To determine an air conditioner's EER, measurements taken on the warmest day of the year are often used. EER, in its simplest form, aims to provide consumers with a sense of the cooling power they may anticipate from an AC for every dollar spent on electricity.

Ratio of Seasonal Energy Efficiency (SEER)

SEER provides the average efficiency for the entire season, making it a more dependable efficiency rating for air conditioners than EER, which only assesses the energy efficiency of the AC on the hottest day of the season. It is calculated by dividing the AC's output power (measured in BTUs) over the course of a season by the total energy the machine used during that same period.

Developed by the EPA, this efficiency rating is well-known. The performance and energy efficiency of HVAC systems with the Energy Star rating are often tested to see if they can provide consumers with excellent value while helping to reduce national energy consumption. Although some gadgets cost a little bit more than their less efficient equivalents, the price difference can easily be made up for in energy savings over time.

To know more about EER click on the link:

https://brainly.com/question/15140663

#SPJ4

who can hop on gta5 to help me sell my cargo psn batheamazing1​

Answers

I CAN DUDE I wanna play rn
*insert random things here*

What is the primary reason traffic laws exist ?

Answers

Answer:

It's to ensure a driver's safety.

Assume you are an observer standing at a point along a three-lane roadway. All vehicles in lane 1 are traveling at 30mph, all vehicles in lane 2 are traveling at 45mph, and all vehicles in lane 3 are traveling at 60mph. There is also a constant spacing of 0.5mile between vehicles. If you collect spot speed data for all vehicles as they cross your observation point, for 30 minutes, what will be the time-mean speed and space-mean speed for this traffic stream?

Answers

In this scenario, vehicles in three lanes are traveling at different speeds with a constant spacing between them.

By collecting spot speed data for 30 minutes as vehicles cross a specific observation point, we can calculate the time-mean speed and space-mean speed for the traffic stream.

To calculate the time-mean speed, we need to determine the average speed of all vehicles over the given time period. Since the speeds in each lane are constant, the time-mean speed will be the average of the speeds in each lane. In this case, lane 1 has vehicles traveling at 30 mph, lane 2 at 45 mph, and lane 3 at 60 mph. Thus, the time-mean speed can be calculated by taking the average of these speeds: (30 + 45 + 60) / 3 = 45 mph.

To calculate the space-mean speed, we need to consider the average speed of vehicles at a specific location along the roadway. In this scenario, the spacing between vehicles in each lane is constant at 0.5 mile. Therefore, the space-mean speed can be calculated by dividing the total distance traveled by all vehicles in the given time period by the total time taken. Since the vehicles maintain a constant speed, the total distance traveled will be the same as the time-mean speed. Hence, the space-mean speed in this case will also be 45 mph.

In summary, for the given traffic stream with different speeds in each lane and a constant spacing between vehicles, the time-mean speed and space-mean speed are both equal to 45 mph.

Learn more about mean speed here:

https://brainly.com/question/9810346

#SPJ11

In Python when we say that a data structure is immutable, what does that mean?

Answers

When we say that a data structure is immutable in Python, it means that its values cannot be changed after it has been created. Any attempt to modify an immutable object will result in the creation of a new object with the updated value, rather than changing the original object. This property of immutability is useful for ensuring data integrity and avoiding accidental modifications to important data. Examples of immutable data structures in Python include strings, tuples, and frozensets.


In Python, an immutable data structure is a data structure that cannot be changed once it is created. This means that if a value is assigned to an immutable data structure, it cannot be modified later, and any operation that attempts to modify the data structure will create a new object with the modified value.For example, tuples in Python are immutable data structures. Once a tuple is created, its contents cannot be changed. If you try to modify a tuple, Python will raise a TypeError.

my_tuple = (1, 2, 3)

my_tuple[0] = 4  # This will raise a TypeError because tuples are immutable

In contrast, mutable data structures, such as lists and dictionaries, can be modified after they are created. This means that you can add, remove, or modify elements in a list or dictionary after they are created.Overall, immutability is a useful property in programming because it makes it easier to reason about the behavior of code and reduces the risk of unintended side effects. In Python, when we say that a data structure is immutable, it means that the elements within the data structure cannot be changed or modified after they are created. Some examples of immutable data structures are strings and tuples. Once an immutable object is created, its state and contents remain constant throughout its lifetime.

To learn more about  Python click on the link below:

brainly.com/question/30427047

#SPJ11

what are the objective goal of a specific in a student of civil engineering

Answers

Answer:

an ability to identify, formulate, and solve engineering problems. an understanding of professional and ethical responsibility. an ability to communicate effectively. the broad education necessary to understand the impact of engineering solutions in a global, economic, environmental, and societal context

Three single-phase loads in parallel are supplied from a 1400V (RMS), 60 Hz supply. The loads are as follows: Load 1: Inductive load: 125 kVA, 0.28 power factor Load 2: Capacitive load: 10 kW, 40 kVAR Load 3: Resistive load: 15 kW Find the total kW, kVAR, kVA, and supply power factor. (5 points) Find the capacitive correction (in kVARs) required to improve the power factor to 0.8 and calculate the supply current with this correction in place. (10 points) What is the least current that can service these three loads and how much compensation would it require

Answers

Answer:

The answer is below

Explanation:

\(\theta_1=cos^{-1}0.28=73.74^o\ lagging\\\\S_1=125\angle 73.74^o=35\ kW+j120\ kVAR\\\\S_2=10\ kW-j40\ kVAR\\\\S_3=15\ kW\)

Total power = P = 35 kW + 10 kW + 15 kW = 60 kW

Total kVAR = 120 kVAR - 40 kVAR = 80 kVAR

\(Total\ apparent \ power =S= S_1+S_2+S_3=(35+j120)+(10-j40)+(15)\\\\S=60\ kW+j80\ kVAR=100\angle 53.13^o\\\\Current(I)=\frac{S^*}{V^*} \frac{100000\angle -53.13^o}{1400\angle0}=71.43\angle-53.13^o\\ \\Power\ factor (PF)=cos(53.13)=0.6\ lagging\\\\The \ new\ power\ factor\ is\ to \ be\ 0.8[cos^{-1}0.8=36.87^o], hence\ since\ the\ total\ \\real\ power(P)= 60\ kW, the\ capacitor\ kVAR(Q_c)\ is:\\\\Q_c=60tan(53.13)-60tan(36.87)=80-45=35\ kVAR\\\\\)

\(C=\frac{Q_c}{wV^2} =\frac{35000\ VAR}{2\pi*60\ Hz*1400\ V}=47.38\ \mu f\)

New current (I') = \(\frac{S'^*}{V^*}=\frac{60000-j45000}{1400}=53.57\angle-36.87^o\)

Current reduce from 71.43 A to 53.57 A

In this lab, we assumed that the flip-flops did not contribute to the timing constraints of the circuit. Unfortunately, this is not the case. As you saw when you simulated the D flip-flop, the sampling action does not happen instantaneously. In fact, a flip-flop will become unstable if the inputs do not remain stable for a certain amount of time prior to the rising-edge event (setup time) and a certain amount of time after the rising-edge event (hold time). Assume a setup and hold time of 2ns and 1ns, respectively. What would the theoretical maximum clock rate for the synchronous adder be in this scenario

Answers

Don’t click on the link

Part A

Determine the force in member DE of the truss, and state if the member is in tension or compression. Take F1 = 564 N , F2 = 905 N .
(Figure 1)

Express your answer to three significant figures and include the appropriate units. Assume positive scalars for members in tension and negative scalars for members in compression.

Part B

Determine the forces in members DC and CB of the truss, and state if the members are in tension or compression.

Express your answer to three significant figures and include the appropriate units. Assume positive scalars for members in tension and negative scalars for members in compression.

Part C

Determine the force in member CE of the truss, and state if the member is in tension or compression.

Express your answer to three significant figures and include the appropriate units. Assume positive scalars for members in tension and negative scalars for members in compression.

Part D

Determine the force in member EB of the truss, and state if the member is in tension or compression.

Express your answer to three significant figures and include the appropriate units. Assume positive scalars for members in tension and negative scalars for members in compression.

Part E

Determine the force in member EA of the truss, and state if the member is in tension or compression.

Express your answer to three significant figures and include the appropriate units. Assume positive scalars for members in tension and negative scalars for members in compression.

Part ADetermine the force in member DE of the truss, and state if the member is in tension or compression.

Answers

Part A is the answer

4.
Describe the correct use of any equipment used to protect the health and safety of themselves and
their colleagues

Answers

Items such as gloves, safety goggles, shoes, earplugs, respirators, hard hats, coveralls, vests, and full body suits are examples of personal protection equipment.

What equipment is used for safety and protection?

Wearing a safety helmet when using a power tool, donning the proper protective clothing when working with chemicals, and taking all necessary safety precautions when operating machinery are all examples of how to use equipment correctly to safeguard their own health and the health and safety of their coworkers.

Healthcare Facilities Using PPE Gloves shield the hands; gowns or aprons shield the skin or clothing; masks and respirators shield the mouth and nose; goggles shield the eyes; and face shields shield the full face. consisting of goggles, gloves, gowns, shoe covers, head coverings, masks, and respiratory equipment.

PPE, or personal protective equipment, is gear that shields users from harm to their health or the danger of accidents. It may consist of equipment like safety harnesses, gloves, eye protection, high-visibility clothes, safety footwear, and respiratory protective equipment (RPE).

To learn more about health equipment refer to :

https://brainly.com/question/28489100

#SPJ1

in mining auxiliary operations are the supplementry steps that support the production cycle . elucidate the auxiliary operations of underground mining?

Answers

Answer:

The answer is below

Explanation:

The mining auxiliary operations in underground mining involve various activities that are important for a successful mining operation particularly in the areas of productive operating conditions.

The activities involved in the auxiliary operations in underground mining include the following: ventilation, haulage, drainage, power supply, lighting, delivery of compressed air, water, supplies to the working sections, and communications.

In a power plant cycle 30 MW is taken out in the condenser, 21 MW is taken out in the turbine, and the pump work is 200 kW. Find the plant thermal efficiency. If everything could be reversed find the COP as a refrigerator

Answers

Answer:

The thermal efficiency of the power plant cycle is 40.95 percent.

The COP as a refrigerator is 1.442.

Explanation:

From Thermodynamics we get that thermal efficiency for power cycles is represented by the following definition:

\(\eta_{th} = \frac{\dot W_{net}}{\dot W_{net}+\dot Q_{L}}\) (Eq. 1)

Where:

\(\dot W_{net}\) - Net power of the power cycle, measured in kilowatts.

\(\dot Q_{L}\) - Heat rate released from condenser, measured in kilowatts.

\(\eta_{th}\) - Thermal efficiency of the power plant cycle, dimensionless.

The net power cycle is determined by the following expression:

\(\dot W_{net} = \dot W_{t}-\dot W_{p}\) (Eq. 2)

Where:

\(\dot W_{t}\) - Power generated by the turbine, measured in kilowatts.

\(\dot W_{p}\) - Power consumed by the pump, measured in kilowatts.

If we know that \(\dot W_{p} = 200\,kW\), \(\dot W_{t} = 21\times 10^{3}\,kW\) and \(\dot Q_{L} = 30\times 10^{3}\,kW\), then the thermal efficiency of the power plant cycle is:

\(\dot W_{net} = 21\times 10^{3}\,kW-200\,kW\)

\(\dot W_{net} = 20.8\times 10^{3}\,kW\)

\(\eta_{th} = \frac{20.8\times 10^{3}\,kW}{20.8\times 10^{3}\,kW + 30\times 10^{3}\,kW}\)

\(\eta_{th} = 0.409\) (\(40.95\,\%\))

The thermal efficiency of the power plant cycle is 40.95 percent.

For refrigeration cycles we remember that the Coefficient of Performance (\(COP_{R}\)), dimensionless, is represented by the following model:

\(COP_{R} = \frac{\dot Q_{L}}{\dot W_{net}}\) (Eq. 3)

If we know that \(\dot W_{net} = 20.8\times 10^{3}\,kW\) and \(\dot Q_{L} = 30\times 10^{3}\,kW\), then the Coefficient of Performance is:

\(COP_{R} = \frac{30\times 10^{3}\,kW}{20.8\times 10^{3}\,kW}\)

\(COP_{R} = 1.442\)

The COP as a refrigerator is 1.442.

Other Questions
when does a bady have negative velocity 50 POINTS, GEOMETRY + BRAINLISTIN each figure P bisects the segment. Find the value of each variable20.PLEASE HELP!!! What term means that both management and employees strive to meet common objectives?. five adaptive features of guava fruite current research indicates that a student who stays up all night ""cramming"" for an exam is most likely to: Point B has coordinate B(1, 1). What is the coordinate of B' under a scale factor of 3?1,-13,-3-2,2-6,6 These notes are all on thelines.GAnswer here HELPPP PLEASE!!!!! SHOW ALL WORK!!! Which environmental agency oversees the U.S. Geological Survey? A. Environmental Protection Agency B. U.S. Department of the Interior C. Superfund D. U.S. Department of Energy 100. In order to produce a magnetic field, an electriccharge must be(1) stationary(2) moving(3) positive(4) negative An employer has three employees who are each paid a salary of $1,250 per month. He wants to give each of the three employees a $125 per month raise and he wants to hire an additional salaried employee. If his salary budget for these employees is $5,325 per month, how much can he afford to offer the new employee? Read the excerpt from The Time Travelers Guide to Elizabethan England.Rich landowners do not normally sell their grain immediately after the harvest is in, when prices are low; instead they store it until the numerous small-scale producers have sold all theirs and prices go up again. Pig farmers keep their flitches of bacon back in storage until they can get a better price for them later in the winter. Such tactics are made even more profitable by the unhappy fact that harvests can fail, causing localand sometimes nationalfood shortages.What inference can be made about both rich landowners and pig farmers, based on this excerpt?A. They often ran out of food supplies before the end of winter came.B. They were the only food suppliers for Elizabethan England all year long.C. They cared more about making a profit than charging fair prices.D. They made little profit from the food they supplied to their communities. A limited liability company can be held liable for any loss or injury caused by the wrongful acts or omissions of its members in the course of business. determine whether the flag has line symmetry and or rotational symmetry identify all lines of symmetry and angles of rotation that map the figure onto itself Pakistani government is thinking about step it should take towards improving the standard of living in the country which of the policies below cart Polo to Pakistan in the party a. Enforce property rights b. Purcoinward-oriented policies c. Pursus contractionary fiscal policy d. Increase money supply Common Core ELA 9- ELA3009 A-CR SUMMERAnalyzing Plot Development"But we do deny it we do deny it!" cried the elders. "Forat that very time our king was sojourning at Troezen onthe other side of the Saronic Sea, and he knew nothing ofthe young prince's death. We ourselves managed thecity's affairs while he was abroad, and we know whereofwe speak. Androgeos was slain, not through the king'sorders but by the king's nephews, who hoped to rouseyour anger against Aegeus so that you would drive himfrom Athens and leave the kingdom to one of them."-"The Cruel Tribute,"James BaldwinEnglishWhat is the effect of Minos accusing Aegeus of killinghis son?The king decides to leave on a long journey.The elders admit what really happened.O The nephews decide to kill Androgeos. What is the simplest form of (4x3 + 6x 7) + (3x3 5x2 5x + 9) Answer thx brainlist Why is Great Britain in 'immense debt' at the time of the speech?A The American RevolutionB) The Proclamation of 1763The French and Indian WarD) The Boston Tea Party Given that 2x + 1 : x + 2 = x+8 : 3x-4Find the possible values of x.