Because of the complexity, long lead time sand critically to a program, a formal system has been set up to communicate t test ranges, what is it?

Answers

Answer 1

Of the program's complexity, lengthy lead time, and criticality, a formal method has been built up to convey the test ranges. This is known as the acquisition strategy.

What is Strategy?

Strategy refers to the technique used by the businessman or any other individual to carry out the action plan in order to achieve the long term goals of the business.

Due to the project's intricacy, long cycle times, and singularity, a systematic technique for communicating the test ranges has been developed. This is referred to as the acquisition approach.

Therefore, it can be concluded that acquisition strategy is the technique used to t test range communication.

Learn more about strategy here:

https://brainly.com/question/15860574

#SPJ4


Related Questions

Before you seriously consider buying a used vehicle, you should
A. Talk to your auto shop teacher about the kind of vehicle you are considering
B. Read vehicle magazine road reports on your type of vehicle
C. Perform a variety of outside and inside checks on the vehicle
D. Have the vehicle inspected

Answers

The correct answer is D. Have the vehicle inspected.

When considering buying a used vehicle, it is essential to have the vehicle inspected by a professional mechanic or trusted automotive expert. This step is crucial to identify any potential issues or hidden problems with the vehicle that may not be apparent to an untrained eye. A thorough inspection can provide valuable insights into the vehicle's condition, including its mechanical components, safety features, and overall functionality.

While options A, B, and C may provide some useful information, they do not replace the need for a professional inspection. Talking to an auto shop teacher or reading vehicle magazine reports can offer general guidance and insights into the specific type of vehicle you are considering. Performing outside and inside checks on the vehicle, such as checking the exterior condition and testing features, can also provide some preliminary information. However, these steps alone may not be sufficient to uncover hidden issues or potential mechanical problems that could impact the vehicle's performance and safety.

Having the vehicle inspected by a professional ensures a comprehensive evaluation of the vehicle's condition. The mechanic will thoroughly examine the engine, transmission, brakes, suspension, electrical systems, and other vital components to identify any existing or potential issues. This information can help you make an informed decision about whether to proceed with the purchase, negotiate the price, or walk away from a problematic vehicle.

In summary, while it can be helpful to consult with experts, read reports, and perform checks, the most important step before seriously considering buying a used vehicle is to have the vehicle inspected by a professional mechanic. This provides you with a reliable assessment of the vehicle's condition, enabling you to make a well-informed decision about your purchase.

To know more about Information visit-

brainly.com/question/28199677

#SPJ11

SS8HIC Constructed Response QUESTION
How were the American Indians impacted by European Exploration?
Type YOUR Answer Here
R
Restate the
question
A
Answer the
Question
с
Cite Evidence
from the text
E
Explain the
evidence in a way
that connections
the question

SS8HIC Constructed Response QUESTIONHow were the American Indians impacted by European Exploration?Type

Answers

Answer:

Aapka answer hai ye

Explanation:

This is your answer..
SS8HIC Constructed Response QUESTIONHow were the American Indians impacted by European Exploration?Type
SS8HIC Constructed Response QUESTIONHow were the American Indians impacted by European Exploration?Type

Halle is on a team that has just been formed. There are people of a wide variety of ages, genders, and ethnicities. Halle’s team demonstrates.

Answers

If Halle is on a team that has just been formed. There are people of a wide variety of ages, genders, and ethnicities. Halle’s team demonstrates: Surface-level diversity

What is surface-level diversity?

Surface-level diversity has to do with the type of features or characteristic people tend to posses and can as well be   be defined as the way in which people  are classified based on their age, education background  ethnic, gender among others.

This scenario best illustrate what is called surface-level diversity based on that surface level diversity help to show the type of features people have.

Therefore we can conclude that the scenario represent Surface-level diversity.

Learn more about Surface-level diversity here: https://brainly.com/question/17514136

#SPJ1

What term applies to the stages that people pass through from birth to death, beginning with childhood and concluding with the older years?.

Answers

The life course term applies to the stages that people pass through from birth to death, beginning with childhood and concluding with the older years.

The life course approach, also known as life course perspective or life course theory, refers to an approach developed in the 1960s to analyze people's lives in their structural, social, and cultural contexts.

CV refers to the social stages we go through in life. Traditionally, these were considered fairly fixed, especially women (who were expected to be dependent on their parents until marriage). It focuses on the idea of ​​what should be deployed, for example, the traditional resume is to meet a partner, get married, have children, raise children, and take children to college.

Learn more about life course https://brainly.com/question/14377076

#SPJ4

Arrange the events of Muhammad’s life in order using numbers 1-6

Answers

Answer:

Muhammad is born

Muhammed leaves Mecca for Medina (Beginning of Islamic Calendar)

The angel Gabriel appears to Muhammad and tells him to spread the word of god

Muhammad begins spreading his message

Muhammad dies. Islam continues to spread, reaching across Southwest Asia and Northern Africa

Explanation:

what do piggy simon and the littlun with the birthmark have in common

Answers

The weakness of civilization compared to the looming threat of savagery present on the island.

Why did King Charles II choose to take over New Amsterdam?

Answers

Answer:

Some English from New England had infiltrated onto Long Island. Charles II decided to seize New Netherland, take over the valuable fur trade and give the colony to his younger brother James, Duke of York and Albany (the future James II). ... New Amsterdam was renamed New York City and New Netherland became New York State.

information that is compiled in an effort to anticipate, prevent, or monitor criminal activity is known as .

Answers

The information that is compiled in an effort to anticipate, prevent, or monitor criminal activity is known as criminal intelligence.

Criminal intelligence is the data that is collected, collated, evaluated, analyzed, and disseminated about criminal activities, goals, and behaviors. This data is used to support police operations, investigations, and other criminal justice activities.

According to the National Criminal Intelligence Sharing Plan, criminal intelligence is: “information compiled, analyzed, and/or disseminated in an effort to anticipate, prevent, or monitor criminal activity”.

Information is collected from a variety of sources, including open sources such as news reports, social media, and public records, and from confidential sources, law enforcement databases, and surveillance systems. The information is then analyzed and disseminated to relevant parties, including police officers, prosecutors, and other agencies.

Criminal intelligence plays a significant role in preventing and combating criminal activity. It can also provide insight into the motivations and intentions of criminal organizations and individuals, which can aid in the development of effective prevention and enforcement strategies.

To know more about criminal, refer here

https://brainly.com/question/23059652#

#SPJ11

Is a State of the Union address required by the Constitution?

Answers

Answer:

While not required to deliver a speech, every president since Woodrow Wilson, with the notable exception of Herbert Hoover, has made at least one State of the Union report as a speech delivered before a joint session of Congress. Before then, most presidents delivered the State of the Union as a written report.

there are so many people on it that if you threw up a grain of sand it would not find a way to fall to earth again

Answers

The phrase "there are so many people on it that if you threw up a grain of sand it would not find a way to fall to earth again" is a hyperbole or exaggeration used to describe a crowded or congested place.

The phrase suggests that the number of people is so vast that even the smallest object, such as a grain of sand, would not be able to fall through the crowd.

This hyperbole can be used to describe a wide range of situations, from crowded cities to busy events, to emphasize just how crowded and overwhelming the situation is. The use of exaggerated language can help convey a sense of awe or amazement, or it can be used to make a point about the impact of human populations on the environment or infrastructure.

Learn more about environment here:

https://brainly.com/question/30821114

#SPJ11

question

There are so many people on it that if you threw up a grain of sand, it would not find a way to fall to earth again, _______.'"

The Silk Road
Study the map. How did the renewed use of the Silk
Road affect Europe?
O It allowed for travel and the exchange of goods and
ideas between Asia and Europe.
Mongolia
Jtalian
Peninsula
Scobi beserta
O It made it more difficult for people to exchange
goods and ideas across large areas.
China
O
Egypt Arabian
Himalayas
India
It eliminated the sea routes that had once
connected Asia and Europe,
Peninsula
It resulted in the expansion of the Mongolian
Empire to include Europe.
Indian Ocean
- Land routes
Water routes

Answers

Answer:

A

Explanation:

fr

Answer:

A. It allowed for travel and the exchange of goods and

ideas between Asia and Europe.

Explanation:

For future people

Hope this helped :)

The Silk RoadStudy the map. How did the renewed use of the SilkRoad affect Europe?O It allowed for travel

who
wrote A Vindication of the Rights of Woman

Answers

Answer:

Mary Wollstonecraft

Explanation:

Answer:

mary Wollstonecraft

Explanation:

i did the test

What is a glacier? How could a massive chunk of ice carve out valleys and create lakes? Explain what glaciation means and identify an example of a lake that was formed by glacial processes.

Answers

A glacier when it gets in the valley it breaks trees small rocks and when it gets into a big hole it starts melting .

Answer:

A glacier is a big chunk of ice. Glaciation is thought to have occurred during the ice age. Glaciation means when a glacier causes deep depressions in land, it fills the hole up when it melts/ melted. An example of this happening is The Great Lakes (Lake Superior, Michigan, Huron, & Ontario).

Explanation:

Ahh I’m sorry I feel like it sounds a bit jumbled together.

One of the ways that has been suggested to alleviate the burden of taxation on the average citizen is lowering the income tax. Explain how this move would affect the revenue stream for federal, state, and local governments in regard to income tax revenue and sales tax revenue.

Answers

Answer:

Cutting taxes reduces government revenues,at lease in the short term, and creates either a budget deficit or increased sovereign debt. The natural countermeasure would be to cut spending.

or...

Lowering the income tax would definitely help raise funds for local governments without hurting any other revenue stream because local governments don’t collect income taxes. With lower income taxes, there is more money for each family to spend and more opportunities for local governments to collect sales tax. State Government: Revenue is gained and lost in for state governments. Money is lost if the income tax is reduced, because the states do collect income taxes. However, states also collect the bulk of the sales tax, and the more money that consumers get to keep, the more money they’ll spend buying products that can be taxed. Federal Government: This move would be bad for the federal government’s revenue stream. Lowering the income tax means less revenue coming into the federal government, and the federal government does not collect sales taxes.

Explanation:

Tax cuts lower government income in the short term, resulting in either a budget deficit or a rise in national debt. Budget cuts would be a reasonable countermeasure.

Because local authorities do not collect income taxes, lowering the income tax would help raise revenues for them without impacting any other revenue streams. With reduced income taxes, each household has more money to spend and local governments have more opportunity to collect sales tax.

Governor's Office: For state governments, revenue is acquired and lost. Because revenue taxes are collected by the states, money is lost if the tax rate is cut.

Learn more:

https://brainly.com/question/1686429?referrer=searchResults

One of the ways that has been suggested to alleviate the burden of taxation on the average citizen is

Write a paragraph explaining how the movie gave you insight or a better understanding into the issues and opposition the black community dealt with during the civil rights era and how they were able to overcome.​

Answers

Answer and Explanation:

Hello. You did not inform the film to which this question refers, which makes it impossible for it to be answered accurately. However, I will try to help you in the best possible way.

We can see that the film is about the struggle of the black American population to gain access to civil rights. In order to improve their understanding of this topic, the film must present how the black population was violently harmed by white people who tried to prevent them from marching, protests and other claims for these rights. All this violence was not able to stop the black population, who were aware of their citizenship and rights and who were looking for a better and more just life not only for themselves, but for the blacks of the future.

the existence of a sugar mill in the mexican town in the passage indicates that the region of mexico in which the lawsuit took place was part of which of the following?

Answers

The presence of a sugar mill in the Mexican town mentioned in the text suggests that the region of Mexico where the lawsuit was filed was part of the Atlantic trade system. The correct answer is The Atlantic trade system.

What exactly was the Atlantic system?

The Atlantic, the world's second-largest ocean, influences our weather patterns, including hurricanes, and is home to numerous animals ranging from sea turtles to dolphins. For ages, the Atlantic Ocean has been a vital trading and transport route.

After 1500, the network of commercial linkages that carried products, wealth, people, and civilizations throughout the Atlantic Basin. Private investor groups that paid France and England a yearly fee in exchange for a monopoly on commerce to the West Indies territories.

To learn more about Atlantic trade system, click

https://brainly.com/question/8652197

#SPJ4

Respond to the prompt and questions below about the Hagia Sophia after reviewing all the content in this unit and the links about the Hagia Sophia, your responses need to be thorough and thoughtful. You must use the information from this unit's content to support your answers. Each of your answers should be at least 2−3 paragraphs. 1. What made the Hagia Sophia such a unique and impressive structure? 2. After learning about the Hagia Sophia and its history, what are your thoughts on the structure and artwork? How should conservation and preservation efforts proceed with the Hagia Sophia? Should the the Hagia Sophia return to a museum? How should the artwork be preserved? Should historians try to recover the Christian artwork that was covered? Please submit your assignment as a Word document or PDF. Make sure to include the question in BOLD and the your answer unbolded. Your response needs to be thorough and thoughtful. It should reflect knowledge from the course content.

Answers

The Hagia Sophia is an impressive structure that holds great historical and cultural significance. What makes it unique is its architectural design, which combines elements of Byzantine and Ottoman styles. The massive dome, the vast open space, and the intricate mosaics all contribute to its grandeur.

One of the key factors that make the Hagia Sophia so impressive is its engineering marvel. Built in the 6th century, it was the largest cathedral in the world for nearly a thousand years. The innovative use of a massive dome supported by pendentives allowed for a larger interior space and created a sense of awe-inspiring beauty. The massive dimensions and intricate architectural details showcase the mastery and skill of the builders.

Moreover, the Hagia Sophia's historical significance cannot be overstated. It served as the principal church of the Byzantine Empire and later as a mosque under the Ottoman Empire. This dual heritage is reflected in its architectural features and artwork. The mosaics, frescoes, and calligraphy inside the Hagia Sophia represent a rich blend of Christian and Islamic art and culture, making it a testament to the diverse history of the region.

Regarding conservation and preservation efforts, the Hagia Sophia should be treated as a valuable cultural heritage site. Its historical and architectural significance should be respected and protected. The decision to convert the Hagia Sophia from a museum to a mosque in 2020 was met with mixed reactions, as it raised concerns about the preservation of the artwork and the accessibility to people of different faiths.

To ensure the preservation of the Hagia Sophia, careful conservation practices should be implemented. The artwork should be protected from damage or degradation through measures such as temperature and humidity control, proper lighting, and regular maintenance. It is also essential to document and digitally preserve the artwork to prevent its loss or destruction.

As for the recovery of covered Christian artwork, this should be approached with caution and sensitivity. Historians and conservationists should work together to explore the feasibility of uncovering and restoring the original Christian artwork while taking into account the historical and cultural context. Any actions taken should respect the religious sensitivities of different communities and promote mutual understanding and dialogue.

In conclusion, the Hagia Sophia's uniqueness lies in its impressive architectural design and rich historical significance. Conservation and preservation efforts should focus on protecting and maintaining the structure, preserving the artwork, and considering the complex historical and cultural context. The decision on whether the Hagia Sophia should remain a mosque or return to a museum should be made with careful consideration of its significance as a symbol of both Christian and Islamic heritage.

learn more about Hagia Sophia Preservation here:

https://brainly.com/question/11718264

#SPJ11

For what purposes may the governor call the legislature into special session in West Virginia?

Answers

A governor frequently calls a special session to address issues such as federal legislation, disasters, war, or other fiscal challenges.

Several of these problems were covered at special sessions.

The governor or the legislature may convene a special session in 36 states. The legislature may only discuss the precise legislative priorities listed when the special session was convened. These sessions may occur whenever, although they are typically constrained in scope.

How many days does the West Virginia Legislature meet?

The Legislature's regular sessions typically start on the second Wednesday of January and last for 60 days.

Special Session: After sine die adjournment, the Senate will have a special session.

To learn more about Special Sessions, visit the following link:

https://brainly.com/question/1626746

#SPJ13

a brief discussion around he policies in south africa that support the rights of learners in respect of their access to educaton

Answers

To ensure the rights of learners in respect of their access to education in South Africa, the government has implemented these policies and frameworks. They work together to promote equal access to quality education for all learners, regardless of their background or circumstances, and to create an inclusive and supportive educational environment.

The key policies include:

1. The Constitution of South Africa (1996): The Constitution enshrines the right to basic education for every person, regardless of race, age, or economic status. It guarantees that everyone has the right to education and that the state must take reasonable measures to make education accessible.

2. South African Schools Act (1996): This act ensures that all learners have the right to access quality education in a safe and nurturing environment. It provides a framework for the establishment, governance, and management of public schools and outlines the responsibilities of school governing bodies, parents, and educators in achieving this goal.

3. National Education Policy Act (1996): This act establishes national norms and standards for education and stipulates the roles of different levels of government in ensuring that these are met. It aims to promote equal access to quality education for all South African learners.

4. White Paper 6 on Special Needs Education (2001): This policy document focuses on the inclusion of learners with disabilities and special educational needs in mainstream schools. It aims to promote an inclusive education system where all learners have equal opportunities to participate in quality education.


Know more about South Africa Education here:

https://brainly.com/question/28205182

#SPJ11

A psychology professor decides to play a practical joke on a colleague in the history department. While the historian is giving a lecture on the first day of class, the psychology professor interrupts and asks to speak with her outside the classroom. While they are conversing, all of the students leave through a back door and are replaced with a completely new group of students. Upon returning, the history professor continues her lecture without noticing that the students are different, thus illustrating:

Answers

Answer: change blindness

Explanation:

Change blindness occurs when there's a change in a visual stimulus and the observer isn't aware of the change.

Since the professor wasn't aware that the sets of students in the class gas been replaced by another set of students and continued teaching like nothing happened, then this is a change blindness.

Which of the following is a major environmental issue facing the U.S. and Canada?
A. climate change
B. globalization
C. offshoring
D. mining

Answers

Answer:

A. climate change.

Explanation:

If the climate is changing and getting warmer, then this is a very dangerous environmental issue, because then thigs will stop functioning like they used to and animals will die and environments will disaster.

Climate change is a major environmental issue facing the U.S. and Canada.

The ecosystem and landscapes of the US and Canada have experienced significant effects as a result of climate change. Precipitation across the nation has increased recently, and severe weather events are also more frequent. Industrial emissions have been produced in Canada and the US since the late 19th century.

Together, transportation and oil and gas extraction produced more than half of the emissions in 2019. The nation's greenhouse gas emissions have increased as a result of the extraction of fossil fuels.

The correct answer is option A.

Know more about Climate change here

https://brainly.com/question/12346202

#SPJ4

compare and contrast nature versus nurture

Answers

Nature is what we think (pre wiring) and it’s influenced by genetic inheritance and many other factors biologically while nurture is like influences of outside(external) factors so like our life experiences can impact nurture also

Nature : obesity high blood pressure genetics

Nurture : poor eating habits lead to obesity and health issues BECAUSE OF YOUR PERSONAL HABITS

9) What role did the tribunes play in the Roman
Republic?
O They were the top leaders in the land
They wrote the laws and advised the consuls
O They were the representatives of the plebeian council
and the common people
They were in charge of public works
They kept the peace in foreign provinces and collected
taxes

Answers

Answer:

They were the representatives of the plebeian council

the term structure of interest rates is the relationship between what two variables?

Answers

The term structure of interest rates is the relationship between two variables: the interest rate and the time to maturity of a bond or other financial instrument.

The main factors that affect the term structure of interest rates include inflation expectations, economic growth, and monetary policy. The term structure is commonly depicted graphically in a yield curve, which shows the yields on bonds of different maturities over a given period.

The yield curve typically slopes upward, indicating that long-term bonds have higher yields than short-term bonds. This is because investors demand a higher return for tying up their money for a longer period of time, to compensate for the risk of inflation and changes in interest rates.

In some cases, the yield curve can be inverted, meaning that short-term bonds have higher yields than long-term bonds.

This can be a sign of economic recession, as investors are more willing to hold short-term bonds to avoid the risk of losses from long-term investments.

The term structure of interest rates is an important consideration for investors and policymakers, as it affects the cost of borrowing and lending, the value of financial assets, and ultimately the health of the overall economy.

To know more about interest rate click on below link:

https://brainly.com/question/13324776#

#SPJ11

relashionship between the spaninish and the american indians living in north america

Answers

Interactions with people: Spanish colonizers attempted to combine local Americans into Spanish way of life with the aid of marrying them and converting them to Catholicism. even though some native people followed factors of Spanish subculture, others decided to insurrection.

Catholics proportion with different Christians a belief within the divinity of Jesus Christ, the son of God made guy who got here to earth to redeem humanity's sins through His death and resurrection. They comply with His teachings as set out within the New testomony and area their agree with in God's promise of everlasting life with Him.

The Catholic Church, additionally known as the Roman Catholic Church, is the most important Christian church, with 1.3 billion baptised Catholics international as of 2019.

The phrase Catholic, derived from the Greek, way "ordinary." Its contrary is sectarian in preference to Protestant. three. Many non-Catholic Christians insist on the use of the adjective Roman to explain the Church that is in union with Rome, due to the fact additionally they regard themselves as Catholic.

Learn more about Catholicism here : https://brainly.com/question/929974

#SPJ1

I have to do a project on how to do a 5 min smth and i chose a mug brownie but youve gotta have a follow up question so i was wondering if anybody had any ideas of questions they could have

Answers

Answer:

what are brownies made of

Explanation:

_________ is the ideology of most u.s. government-funded drug prevention programs that states that no drug usage whatsoever is acceptable without serious consequences and all drugs are equally as harmful.

Answers

"Zero tolerance" is the ideology of most U.S. government-funded drug prevention programs that states that no drug usage is acceptable without serious consequences and all drugs are equally as harmful.

This approach is implemented to discourage any drug use, emphasizing the potential negative outcomes of drug consumption.

By treating all drugs as equally harmful, the policy aims to simplify the message and create a clear-cut stance against drug use.

It promotes strict enforcement of drug laws, leading to penalties and legal consequences for individuals caught using or possessing drugs.

Advocates of argue that it sends a strong message about the dangers of drug use, while critics suggest that it may overlook the varying risks associated with different drugs and lead to overly punitive measures.

To know more about Zero tolerance refer here:

https://brainly.com/question/4483599#

#SPJ11

While behaviorism focused on only observable behavior, cognitive psychology focuses on introspection. acknowledges the existence of internal mental states. maintains that dreams reflect the subconscious. holds that behavior is irrelevant to the study of the mind

Answers

Option B is the correct answer to the given question about cognitive psychology acknowledges the existence of internal mental states.

The discipline of cognitive psychology is concerned with the scientific study of cognitive functions such as problem-solving, creativity, language, memory, perception, and attention. Philosophically, discussions about the functioning of the human mind date back to the time of the ancient Greeks. The seat of the brain's mental functions, according to Plato, was hypothesized in 387 BCE. René Descartes proposed mind-body dualism, also known as substance dualism, in 1637. He also asserted that people have innate concepts (essentially the idea that the mind and the body are two separate substances). The question of whether human mind was only experiencing (empiricism) or incorporated innate knowledge was then hotly debated throughout the 19th century (rationalism).

To learn more about cognitive psychology click here

brainly.com/question/28167182

#SPJ4

Question

While behaviorism focused on only observable behavior, cognitive psychology

a) focuses on introspection.

b) acknowledges the existence of internal mental states.

c) maintains that dreams reflect the subconscious.

d) holds that behavior is irrelevant to the study of the mind

what if you jumped off a bridge and survived...?

Answers

Answer:

if u jumped off and survived, you would be alive.

Explanation:

u'd probably have broken some stuff or something tho.

Answer: Then I guess you would realize that you should be alive. Unless you are stupid and jump off again. But really self love.

Explanation: No need to explain.

What is your opinion on cultural appropriation?

Answers

Bro, you gotta answer that, cause it’s not mine, it’s yours

They can’t mark you down cause it’s an opinion, as long as it’s referring to something in your reading

Answer:

 The crux of cultural appropriation, like racism, is subjugation. So, a Black woman isn’t appropriating White culture when she wears straightened hair, which isn’t even exclusive to White people.

Explanation:

Cultural appropriation involves pillaging, especially for profit or cool cred, without respect or reverence, like non-Black kids wearing cornrows.

Other Questions
How many phases did the French Revolution have? Explain each of the phasesand the significance of each of them. How many moles of aluminum are required to completely react with 107 mL of 6.00 M H2SO4 according to the balanced chemical reaction:2 Al(s) + 3 HSO(aq) Al(SO)(aq) + 3 H(g) If hot dogs decrease in price, what will happen to the demand for hot dog buns?O It will increase, due to a change in consumer incomeO It will decrease, due to a change in consumer expectationsIt will increase, due to a change in the price of a complement good the nurse is caring for an older client who has been prescribed bisacodyl for constipation. which assessment finding will convince the nurse to contact the health care provider about administering the bisacodyl? I dont understand the question pls help Which of the following is the question to the rational expressions shown below5x/2x+3 divided by x+1/3x An airplane traveled 5.7 102 miles per hour for 1.4 101 hours. How many miles did the airplane travel? Express your answer in standard form. someone deletes a file, the file goes to the trash/recycle bin, then the user emptied the recycle bin. can the file always be recovered using forensics tools? Which of the following is true concerning sources of water pollution? a. Mine wastes and heavy metals become water pollution through storm water runoff. B. Biodegradable materials like food, wood, and leaves are not considered pollution. C. Petroleum byproducts and fuels end up as pollution principally from oil spills. D. Pesticides and herbicides do not commonly become water pollutants. Please select the best answer from the choices provided A B C D. the daily dinner bills in a local restaurant are normally distributed with a mean of $30 and a standard deviation of $5. what is the probability that a randomly selected bill will be at least $39.10 ?a. 0.9678b. 0.0322c. 0.9656d. 0.0344 What does Clover symbolize in Animal Farm? keratin provides what?a. waterproof coveringb. insulationc. protection from UV radiationd. pigmentation can someone help me plz.. Which of the following are equations for the line shown below? Check all thatapply.5(-5, -2)(3,-4) Arthur is drawing triangles. All of the triangles have a base length of 5 inches. The area of the triangle is proportional to the height of the triangle.Which table shows the proportional relationship correctly? A. Heights (cm) 3 5 7Area (sq cm) 7.5 12.5 18.5 B. Heights (cm) 6 8 10Area (sq cm) 15 19 25 C. Heights (cm) 4 5 6Area (sq cm) 10 13.5 17 D. Heights (cm) 2 4 7Area (sq cm) 5 10 17.5 What role did drama and music play in the lives of the ancient Greeks? How were the two forms interrelated? As shown in the diagram below, the angle of elevation from a point on the ground to the top of the tree is 34 If the point is 20 feet from the base of the tree, what is the height of the tree, to the nearest tenth of a foot I need help please and thank you!A - The distribution of the data is symmetrical for both data sets B - The median of the data is the same for both data sets C - The mode of the data is the same for both data sets D - The range of the data is the same for both data sets Let f(5, 10) = 200 and f(5.2, 9.9) = 197. (a) Approximate the directional derivative at (5, 10) in the direction from (5, 10) toward (5.2, 9.9). (b) Approximate f(Q) at the point Q that is distance 0.1 from (5, 10) in the direction of (5.2, 9.9). (c) Give coordinates for the point Q. I need help with this please supposed normal distribution has a mean of 89 and a standard deviation of 7. What is P(x82)? NO LINKS!!!a. 0.975b. 0.84c. 0.16d. 0.025