For 1000 words, highlight the importance of an effective work breakdown structure (WBS) in terms of its fair work distribution, work responsibility and time work priority.
*use examples of projects to demonstrate the objectives (scope) and WBS.

Answers

Answer 1

An effective Work Breakdown Structure (WBS) is crucial for fair work distribution, work responsibility, and prioritizing time work in project management. It ensures clear objectives and scope definition, facilitates efficient resource allocation, and enhances overall project performance.

A Work Breakdown Structure (WBS) is a hierarchical decomposition of a project into smaller, manageable work components. It plays a vital role in project planning, execution, and control by providing a structured framework for organizing tasks, assigning responsibilities, and prioritizing work. One key importance of an effective WBS is fair work distribution. By breaking down the project into smaller work packages and assigning them to different team members, it ensures that the workload is distributed evenly among the team. This helps prevent overburdening of individuals and promotes collaboration and cooperation within the team.

Work responsibility is another critical aspect facilitated by a well-defined WBS. Each work package in the WBS is assigned to a specific team member or group, clarifying their roles and responsibilities. This promotes accountability and ensures that every aspect of the project is accounted for, reducing the likelihood of tasks being overlooked or neglected.

Additionally, a well-structured WBS allows for the prioritization of time work. By organizing tasks into a logical sequence and identifying dependencies, project managers can effectively allocate resources and set realistic deadlines. This helps in managing project timelines, identifying critical paths, and avoiding bottlenecks, leading to improved project efficiency and timely delivery.

For example, in a construction project, the WBS can include work packages such as foundation, framing, plumbing, electrical, finishing, etc. Each work package can be further broken down into specific tasks and assigned to respective contractors or tradespeople.

Learn more about accountability here: https://brainly.com/question/28246722

#SPJ11


Related Questions

At steady state, a well-insulated compressor takes in air at 60F, 14.2 lbf/in.2 , with a volumetric flow rate of 1200 ft3 /min, and compresses it to 500F, 120 lbf/in.2 Kinetic and potential energy changes from inlet to exit can be neglected. Determine the compressor power, in hp, and the volumetric flow rate at the exit, in ft3 /min.

Answers

Answer:

the compressor power is -223.12 hP   { -ve indicate work done }

Volumetric flow rate at exit = 262.74 ft³/s

Explanation:

Given the data in the question;

p₁ = 14.2 psi = 0.978 bar

p₂ = 120 psi = 8.268 bar

T₁ = 60°F = 288.706 K

T₂ = 500°F = 533.15 K

Q₁ = 1200 ft³/min = 20ft³/s = 0.566 m³/s

δ₁ = p₁/RT₁ = 0.978 × 10⁵ / ( 287 ×  288.706) = 1.18 kg/m³

δ₂ = P₂/RT₂ = 8.268 × 10⁵ / ( 287 × 533.15 ) = 5.4 kg/m³

so

ω₁ = δ₁Q₁ = 1.18 × 0.566 = 0.668 kg/s

we know that; ω₁ = ω₂    { in a steady flow }

ω₂ = δ₂Q₂

Q₂ = ω₂/δ₂

Q₂ = 0.668 / 5.4  = 0.1237 m³/s  

Hence Volumetric flow rate at exit = 262.74 ft³/s

from the steady state energy equation;

ω( h₁ - h₂ ) = dW/dt

{ where h = CpT)

( Cp = 1.005  )  

dW/dt =  ωCp( T₁ - T₂ )

we substitute

dW/dt = 0.668 × 1.005( 288.706 - 533.15 )

dW/dt = 0.67134 × -244.444

dW/dt = -164.105 kW = -223.12 hP

Hence, the compressor power is -223.12 hP   { -ve indicate work done }

two nearby wireless access points (waps) should use close channels like 6 and 7. True or false?

Answers

False. Two nearby wireless access points (WAPs) should not use close channels like 6 and 7. This is because neighboring channels can cause interference, resulting in decreased performance and slower speeds for both WAPs.

To avoid interference, it is recommended to use channels that are at least five apart, such as channels 1, 6, and 11. By doing so, each WAP will have its own dedicated frequency, minimizing the potential for overlapping signals and interference. It is also important to note that the optimal channel selection can vary depending on factors such as the size and layout of the space, the number of devices being used, and any other potential sources of interference in the area. In general, it is best to perform a site survey to determine the best channels for your specific environment. Overall, it is important to carefully consider channel selection when setting up wireless access points to ensure optimal performance and minimize interference.

Learn more about wireless access points here-

https://brainly.com/question/15075861

#SPJ11

Explain the speed control techniques in shunt dc motors and series dc motors

Answers

Answer:

Explanation:

In Shunt DC Motors, the speed can be controlled using the following techniques:

Armature voltage control - By varying the armature voltage, the magnetic field produced by the armature current can be controlled, which affects the speed of the motor. Thus, the speed of the motor can be regulated by controlling the armature voltage.

Field resistance control - The speed of the motor can also be controlled by varying the field resistance. By increasing the field resistance, the flux produced by the field winding is decreased, and the speed of the motor increases. Conversely, reducing the field resistance increases the flux and decreases the speed.

Armature resistance control - In this method, the resistance of the armature circuit is varied. By increasing the armature resistance, the current in the motor reduces, leading to a decrease in the speed of the motor.

In Series DC Motors, the speed can be controlled using the following techniques:

Armature voltage control - Similar to shunt motors, the speed of the series motor can be regulated by varying the armature voltage.

Field flux control - As the name suggests, the flux produced by the field winding can be controlled by varying the field winding resistance. By increasing the field resistance, the flux reduces, leading to an increase in speed. Conversely, decreasing the field resistance increases the flux and decreases the speed.

Armature resistance control - By varying the armature resistance, the current in the motor can be controlled. Increasing the resistance decreases the current, leading to an increase in speed.

Overall, these techniques enable the speed control of shunt and series DC motors, allowing them to be used in a wide range of applications where variable speed control is required.

PLS MARK ME BRAINLIEST

Which three items below should a driver be able to identify under the hood of a car?

Answers

Answer:

Engine oil level.

Brake fluid.

Power steering fluid.

Given the below input signal, V????????(t), and the phasors of the transfer function at various frequencies, calculate the expression for the output signal, VO????T(t) in the form VO????T(t)=Acos(200πt+θ1)+Bcos(400πt+θ2). What is the value of A? V????????(t)=10cos(200πt+30∘)+20cos(400πt+45∘)

Answers

The question is incomplete! Complete question along with answer and step by step explanation is provided below.

Question:

1. Given the below input signal, VIN(t), and the phasors of the transfer function at various frequencies, calculate the expression for the output signal, VOUT(t) in the form VOUT(t)=Acos(200πt+θ1)+Bcos(400πt+θ2).

What is the value of A?

VIN(t)=10cos(200πt+30)+20cos(400πt+45)

H(f)=0.1∠10      f=100Hz

H(f)=1∠−20      f=200Hz

H(f)=2∠30      f=300Hz

H(f)=3∠−40     f=400Hz

H(f)=4∠50      f=500Hz

2. In the same question, what is the value of θ1 in degrees? Enter the value in the box below without the units.

3. In the same question, what is the value of B? Enter the value in the box below without the units.

4. In the same question, what is the value of θ2 in degrees? Enter the value in the box below without the units.

Answer:

Vout(t) = 10cos(200πt + 10°) + 60cos(400πt + 5°)

1. What is the value of A?

A = 10

2. In the same question, what is the value of θ1 in degrees?

θ₁ = 10°

3. In the same question, what is the value of B?

B = 60

4. In the same question, what is the value of θ2 in degrees?

θ₂ = 5°

Explanation:

The output signal Vout(t) is in the form

Vout(t)=Acos(200πt + θ₁) + Bcos(400πt + θ₂)

The input signal Vin(t) is given as

Vin(t) = 10cos(200πt + 30°) + 20cos(400πt + 45°)

The output signal Vout(t) is found by

Vout(t) = H(f) × Vin(t)

Where H(f) is the transfer function at various frequencies and Vin(t) is the input signal.

H(200) = 1 ∠−20°

H(400) = 3 ∠−40°

converting the input signal into phasors

10cos(200πt + 30°) = 10 < 30°

20cos(400πt + 45°) = 20 < 45°

Vout(t) = H(200)×10cos(200πt + 30°) + H(400)×20cos(400πt + 45°)

Vout(t) = (1 ∠−20°)×10cos(200πt + 30°) + (3 ∠−40°)×20cos(400πt + 45°)

Vout(t) = (1 ∠−20°)×(10 < 30°) + (3 ∠−40°)×(20 < 45°)

Multipy the magnitude and add phase angles together

Vout(t) = (1×10 ∠−20° + 30°) + (3×20 ∠−40° + 45°)

Vout(t) = 10 ∠ 10° + 60 ∠5°

Vout(t) = 10cos(200πt + 10°) + 60cos(400πt + 5°)

Comparing it with the general form

Vout(t)=Acos(200πt + θ₁) + Bcos(400πt + θ₂)

1. What is the value of A?

A = 10

2. In the same question, what is the value of θ1 in degrees?

θ₁ = 10°

3. In the same question, what is the value of B?

B = 60

4. In the same question, what is the value of θ2 in degrees?

θ₂ = 5°

Signal loss is the reduction of a signal that occurs in a medium as a function of the physical length of the channel. This is known as:_________

a. degradation.
b. attenuation.
c. frequency degradation.
d. amplitude degradation.

Answers

Answer:

B) Attenuation

Explanation:

Attenuation can be regarded as the loss of signal strength which could be as a result of both external and internal factors. This loss of signal strength could occur in networking cables as well as other connections. Attenuation is a loss in energy, because as signal travels, its strength decreases as a a result of distance it covers, this loss of energy is due to the signal trying to overcome the resistance at the medium. One of the main the causes of attenuation is When there is Extra noise on available networks, networks such as electrical current as well as radio waves. It should be noted that attenuation is Signal loss which is the reduction of a signal that occurs in a medium as a function of the physical length of the channel.

Singnal attenuation can taken care of by using lower loss materials with high cost, instead of making of PCB routing length reduction. Amplifiers can also be engaged in amplifying attenuated signal to get back the original signal, this will compensate the loss.

Attenuation can be measured in decibels(dB), this gives the measurement of relative strengths of one signal at two different point or measurement of two signals.

A producer is someone who _____________.
A.
Makes a commodity available for sale or exchange
B.
Buys or trades in order to receive a commodity
C.
Is in the market for a commodity
D.
Receives a commodity from a business

Answers

the answer is A. By the way you could’ve searched up the definition of Producer.

Answer: A. Makes a commodity available for sale or exchange

Explanation: hope it helps ^w^

The value of resistance r was determined by measuring current I flowing through the resistance with an error E1=±1. 5% and power loss p in it with an error E2=±1. 0%. Determine the maximum possible relative error to be expected on measuring resistance r, calculated from the formula r=p/I²

Answers

To determine the maximum possible relative error on measuring resistance (r) using the formula r = p/I², the maximum possible relative error to be expected on measuring resistance (r) is 3.16%.

we need to consider the error propagation. The maximum relative error (Δr/r) can be calculated using the formula:

Δr/r = sqrt((Δp/p)² + 4(ΔI/I)²)

Given that the error in power (Δp) is ±1.0% and the error in current (ΔI) is ±1.5%, we can substitute these values into the formula:

Δr/r = sqrt((0.01)² + 4(0.015)²)

Δr/r = sqrt(0.0001 + 4(0.000225))

Δr/r = sqrt(0.0001 + 0.0009)

Δr/r = sqrt(0.001)

Δr/r = 0.0316

To know more about measuring click the link below:

brainly.com/question/30271819

#SPJ11

1. Burning used oll on-site is one option for used oll recycling.
A) O True
B) O False

Answers

Answer:

false

Explanation:

burning a substance is not recycling it

When modeling an engineering process, the right choice between a simple but crude and a complex but accurate model is usually the _______

Answers

When modeling an engineering process, the right choice between a simple but crude and a complex but accurate model is usually the complex model.

What is the engineering process?

Engineers frequently follow a set of phases known as the engineering design cycle when developing useful goods, as well as procedures. This design are being frequently used by the person to create a model through which it can do various structural inputs.

The purpose of this modeling is to solve the complexity of the model as well as to allow a tolerable that can be more reliable.A complicated though the precise model is typically preferable to a simple yet unsophisticated one when simulating an engineering process.

Learn more about the engineering process, here:

https://brainly.com/question/10175918

#SPJ1

why do brittle materials fail rapidly after yield, and why do ductile materials have a period of decreasing stress after the ultimate stress?

Answers

Brittle materials fail rapidly after yield because they cannot deform plastically. Ductile materials have a period of decreasing stress after the ultimate stress because they can deform plastically.

What is brittle materials?

Brittle materials includes glass, ceramic, graphite, and some alloys with exceptionally low plasticity, in which cracks can form without plastic deformation and quickly evolve into brittle breakage. The microcutting model does not appear to be appropriate for such materials. It has been demonstrated experimentally that when a single particle meets brittle material, cracks often form at the faulty impact places when the particle impact velocity reaches a particular value, the threshold velocity.

To learn more about brittle materials
https://brainly.com/question/17223453

#SPJ4

The efficiency of a steam power plant can beincreased by bleeding off some of the steam thatwould normally enter the turbine and usingit topreheat the water entering the boiler. In this process,liquid water at 50oC and 1000 kPa is mixed withsuperheated steam at 200oC and 1000 kPa. If the plantoperators want to produce a saturated liquid at 1000kPa, what ratio of mass flow rates of water andsuperheatedsteam are required

Answers

Answer:

Explanation:

This is Answer....

The efficiency of a steam power plant can beincreased by bleeding off some of the steam thatwould normally
The efficiency of a steam power plant can beincreased by bleeding off some of the steam thatwould normally

What should you use to clean hand and power tools?

Answers

How to Clean Hand Tools:

Dish soap to tackle oil and greaseLarge bucket for hot water and dish soap solution.Scrubber, scrub brush, or steel wool to further clean away any dirt.Cloth to wipe down your tools.

Cleaning Power Tools:

wipe dirt and other particles from the outside casing with a good cleaning cloth. Compressed air is the best option to clean the particles from the tool's vents; cleaning your tool's exhaust vents with a brush could push the dirt farther into the tool and inadvertently cause more damage later.

Technician A says each manufacturer uses the same speed sensors to ease diagnostics. Technician B says each manufacturer and sometimes different ABS systems use different diagnostic procedures. Who is correct

Answers

It is important for Technicians to be knowledgeable about these differences to perform accurate and efficient diagnostics and repairs.

Technician B is correct. Although speed sensors serve a similar purpose in various vehicles, each manufacturer, and sometimes even different ABS systems within the same manufacturer, may use different types of speed sensors. This can result in different diagnostic procedures required to troubleshoot and fix issues related to the ABS system.
The reason for these differences is that manufacturers design their ABS systems with specific components and software to meet the unique requirements of their vehicles. Consequently, the diagnostic procedures and tools needed to identify and fix problems may vary. Professional technicians need to be familiar with the specific procedures and tools recommended by each manufacturer to ensure accurate and effective diagnosis and repair of ABS systems.
In  Technician B is correct because each manufacturer, and sometimes different ABS systems, use different diagnostic procedures due to the unique design of their speed sensors and ABS components. It is important for technicians to be knowledgeable about these differences to perform accurate and efficient diagnostics and repairs.

To know more about Technicians .

https://brainly.com/question/29855431

#SPJ11

I need help with part (C). Pleasee help me. It’s due in a few hours.

 I need help with part (C). Pleasee help me. Its due in a few hours.

Answers

Answer:

u do the same thing as part B but only add 100 k, I think, cuz I'm still in middle school but I mean if u see it asks u to do the same thing as B but C says that instead, u do it at half pressure and 100 k is higher temp so what its asking is to repeat b but the twist is u do it at half pressure and 100 k is the higher temp

hope this helps :)  

If a sky diver decides to jump off a jet in Arkansas
with the intention of floating through Tennessee to
North Carolina, then completing his journey in a
likely manner back to Arkansas by drifting North
from his last point. What state would be the third t
be drifted over and what is the estimated distance
between the zone and then drop point?​

Answers

Answer:

The answer to this question can be defined as follows:

Explanation:

The sky driver began his sky journey from Arkansas, drove across the Tennessee River then landed in North Carolina. He returned to both the north in the very same direction. He began with NC, traveled through Tennessee, eventually lands in Arkansas. But North Carolina has been in the third state on which skydiver was traveling over, and It's also more than 700 miles from Arkansas to the NC.

A specimen of steel 100mm diameter with a guage length of 100mm tested a distruction it has an extension of 0.50mm under a load of 70KN and the load at elastic limit is 10KN the maximum load is 140KN the total extension of fracture is 58mm and the diameter at the neck is 16mm . find the Stress of elastic limit, young modulus, percentage enlogation, percentage reduction in area , and ultimate tensile stress?​

Answers

The stress at elastic limit is 1.27 N/mm^2, the Young's modulus is 254 N/mm^2, the percentage elongation is 57.5%, the percentage reduction in area is 97.44%, and the ultimate tensile stress is 696.67 N/mm^2.

How to calculate the values

Stress = Force / Area

Young's modulus = Stress / Strain

Percentage elongation = (extension / gauge length) x 100%

Percentage reduction in area = [(original area - area at neck) / original area] x 100%

Ultimate tensile stress = Maximum load / Area

Diameter of specimen = 100 mm

Gauge length = 100 mm

Extension at 70 KN load = 0.50 mm

Load at elastic limit = 10 KN

Maximum load = 140 KN

Total extension at fracture = 58 mm

Diameter at neck = 16 mm

We can calculate the area of the specimen as follows:

Area = π/4 x d^2

Area = π/4 x (100 mm)^2

Area = 7853.98 mm^2

The stress at elastic limit can be calculated as:

Stress = Load / Area

Stress = 10 KN / 7853.98 mm^2

Stress = 1.27 N/mm^2

The Young's modulus can be calculated as:

Strain = Extension / Gauge length

Strain = 0.50 mm / 100 mm

Strain = 0.005

Stress = Load / Area

Load = Stress x Area

Load = 1.27 N/mm^2 x 7853.98 mm^2

Load = 9982.16 N

Young's modulus = Stress / Strain

Young's modulus = 1.27 N/mm^2 / 0.005

Young's modulus = 254 N/mm^2

The percentage elongation can be calculated as:

Percentage elongation = (extension / gauge length) x 100%

Percentage elongation = (58 mm - 0.50 mm) / 100 mm x 100%

Percentage elongation = 57.5%

The percentage reduction in area can be calculated as:

Original area = π/4 x (100 mm)^2 = 7853.98 mm^2

Area at neck = π/4 x (16 mm)^2 = 201.06 mm^2

Percentage reduction in area = [(original area - area at neck) / original area] x 100%

Percentage reduction in area = [(7853.98 mm^2 - 201.06 mm^2) / 7853.98 mm^2] x 100%

Percentage reduction in area = 97.44%

The ultimate tensile stress can be calculated as:

Area at neck = π/4 x (16 mm)^2 = 201.06 mm^2

Ultimate tensile stress = Maximum load / Area

Ultimate tensile stress = 140 KN / 201.06 mm^2

Ultimate tensile stress = 696.67 N/mm^2

Therefore, the stress at elastic limit is 1.27 N/mm^2, the Young's modulus is 254 N/mm^2, the percentage elongation is 57.5%, the percentage reduction in area is 97.44%, and the ultimate tensile stress is 696.67 N/mm^2.

Learn more about stress on;

https://brainly.com/question/11819849

#SPJ1

Find the general solution of the DE y" - 3y' = e³x – 12x.

Answers

The general solution of the given differential equation is  \(C_1 + C_2e^{(3x)\) + (1/6)e³x + 4x.

To find the general solution of the given differential equation, we can first solve the associated homogeneous equation, which is y" - 3y' = 0.

The characteristic equation for the homogeneous equation is obtained by assuming a solution of the form \(y = e^{(rx)\), where r is a constant. Substituting this into the characteristic equation, we get:

\(r^2 - 3r = 0\)

Factoring out r, we have:

r(r - 3) = 0

So, the solutions to the homogeneous equation are r = 0 and r = 3.

Therefore, the general solution to the homogeneous equation is given by:

\(y_h = C_1e^{(0x)} + C_2e^{(3x)\)

    = C1 + C2e^(3x)

To find a particular solution to the non-homogeneous equation, we can use the method of undetermined coefficients. Since the non-homogeneous term is e³x – 12x, we assume a particular solution of the form \(y_p\) = Ae³x + Bx + C.

Plugging this particular solution into the original differential equation, we get:

(9Ae³x + B - 3Ae³x - 3B) - 3(Ae³x + Bx + C) = e³x – 12x

Simplifying, we have:

6Ae³x - 3B - 3Bx - 3C = e³x – 12x

Equating the coefficients of like terms on both sides, we get:

6A = 1 (from the coefficient of e³x)

-3B = -12 (from the coefficient of x)

-3C = 0 (from the constant term)

Solving these equations, we find A = 1/6, B = 4, and C = 0.

Therefore, a particular solution to the non-homogeneous equation is:

\(y_p\) = (1/6)e³x + 4x

The general solution to the given differential equation is the sum of the homogeneous and particular solutions:

y = \(y_h + y_p\)

  = \(C_1 + C_2e^{(3x)\) + (1/6)e³x + 4x

This is the general solution of the given differential equation.

Learn more about differential equation :

https://brainly.com/question/32538700

#SPJ11

Discuss the major requirements of an EMS under ISO 14001.

Answers

the major requirements of an EMS under ISO 14001: Environmental Policy,  Planning, Implementation and Operation, etc.

ISO 14001 is an internationally recognized standard for environmental management systems (EMS). It sets out the criteria for an organization to establish, implement, maintain, and continually improve an EMS. The major requirements of an EMS under ISO 14001 include:

1. Environmental Policy: The organization must establish and communicate a clear environmental policy that outlines its commitment to environmental performance and compliance with applicable laws and regulations.

2. Planning: The organization needs to identify and assess its environmental aspects and impacts, set environmental objectives and targets, and develop action plans to achieve them. This includes considering legal and other requirements, as well as emergency preparedness and response.

3. Implementation and Operation: The organization must establish and document the processes and procedures necessary to achieve its environmental objectives. This includes defining roles and responsibilities, providing appropriate resources, and establishing communication and training programs.

4. Checking and Corrective Action: Regular monitoring and measurement of environmental performance are required to ensure compliance and identify opportunities for improvement. Non-conformities, incidents, and corrective actions need to be documented and addressed in a timely manner.

5. Management Review: Top management must review the EMS at planned intervals to ensure its continuing suitability, adequacy, and effectiveness. This involves reviewing the organization's environmental policy, objectives, targets, and progress towards achieving them.

6. Continual Improvement: The organization should continually strive to improve its environmental performance. This includes setting objectives for improvement, implementing initiatives to reduce environmental impacts, and promoting pollution prevention and sustainable practices.

It is important to note that the specific requirements of ISO 14001 may vary depending on the nature of the organization, its size, and its environmental context. Organizations are encouraged to tailor their EMS to their unique circumstances while meeting the overall requirements of the ISO 14001 standard.

To know more about ISO, click here:

https://brainly.com/question/25404565

#SPJ11

A correctly designed and installed air curtain can be used to prevent what

Answers

To prevent pests from coming it!

A correctly designed and installed air curtain can be used to prevent insects, dust, and debris from entering a building

How to determine what it prevents

An air curtain, when correctly designed and installed, can prevent insects, dust, and debris from entering a building. It can also act as a thermal barrier, blocking the transfer of heat or cold, disperse odors, and contain smoke in the event of a fire.

A correctly designed and installed air curtain can be used to prevent or minimize several things.

It's important to note that the effectiveness of an air curtain depends on various factors, such as its design, installation, and maintenance. Proper sizing, airflow velocity, and positioning are crucial to achieving the desired results.

Learn about air curtain at: https://brainly.com/question/15096367

#SPJ6

ech a says that brake shoe linings saturated with brake fluid from a leaky wheel cylinder can be cleaned with brake cleaner and reused as long as they aren’t worn out. tech b says that brake shoes should be replaced in axle sets. who is correct?

Answers

Based on the information provided, the technician who is correct is: B. Technician B.

What is a braking system?

A braking system can be defined as a mechanical system which comprises various components that are designed and developed to bring an automobile vehicle in motion to a stop, when applied by a driver.

How to diagnose a brake system?

In order for a technician to diagnose a brake system, the following symptoms should be adequately and appropriately checked and used by the technician:

NoisesSmellsAbnormal brake pedal movements.Improper braking action.

Based on the information provided, we can reasonably infer and logically deduce that the technician who is correct is Technician B because brake shoes are to be replaced in axle sets.

Read more on braking system here: https://brainly.com/question/24751467

#SPJ1

Complete Question:

Tech a says that brake shoe linings saturated with brake fluid from a leaky wheel cylinder can be cleaned with brake cleaner and reused as long as they aren’t worn out. tech b says that brake shoes should be replaced in axle sets. who is correct?

Technician A.

Technician B.

Neither Technician A nor Technician B

Both Technician A and Technician B

Which term is defined as the study of sound waves and their behaviors and interactions? propulsion acoustics hydraulics thermodynamics

Answers

Answer: i believe it’s acoustics

Explanation:

which one of the following is an example of a disclosure threat?a. Alteration b. Denial c. Espionage d. Destruction

Answers

Espionage is  one of the following is an example of a disclosure threat.

What is Espionage ?

Espionage is the act of obtaining confidential or sensitive information by unauthorized means, typically through spying or covert means. This information may be related to national security, business secrets, scientific research, or other sensitive information. Espionage is often carried out by individuals working for governments, intelligence agencies, or criminal organizations for the purpose of gaining strategic advantage or economic benefit.

Espionage can take many forms, including hacking into computer systems, intercepting communications, recruiting insiders, or using physical means to access information.

The correct answer is c. Espionage, as it is an example of a disclosure threat.

A disclosure threat is a security risk that results in the unauthorized release of confidential or sensitive information. Espionage refers to the act of obtaining confidential or sensitive information by unauthorized means, typically through spying or covert means. This constitutes a threat to the confidentiality of the information, as it may be disclosed to unauthorized parties who can use it for malicious purposes.

The other options (alteration, denial, and destruction) are not examples of disclosure threats. Alteration refers to unauthorized changes to information, denial refers to the prevention of access to information, and destruction refers to the complete deletion or destruction of information. These are different types of security risks that have different impacts on the confidentiality, availability, and integrity of information.

Learn more about Espionage click here:

https://brainly.com/question/29547097

#SPJ4

Which type of warehouse provides outsourced warehousing services?

Answers

Fulfillment centers is  type of warehouse provides outsourced warehousing services.

What is Fulfillment centers?

The type of warehouse that provides outsourced warehousing services is called a third-party logistics (3PL) warehouse. A 3PL warehouse is a company that specializes in providing logistics and warehousing services to other businesses. They typically offer a range of services, including inventory management, order fulfillment, transportation, and distribution.

Therefore, By outsourcing their warehousing needs to a 3PL warehouse, businesses can benefit from a number of advantages. For example, they can reduce the costs and risks associated with managing their own warehouse, as well as gain access to specialized expertise and resources.

Learn more about Fulfillment centers from

https://brainly.com/question/26413947

#SPJ1

The * key is used for ____.

Answers

the * key is used for multiplication

1. Consider a solid cube of dimensions 1ft x 1ft x 1ft (=0.305m x 0.305m x 0.305m). Its top surface is 10
ft (=3.05 m) below the surface of the water. The density of water is pf=1000 kg/m3.
Consider two cases:
a) The cube is made of cork (pB=160.2 kg/m3)
b) The cube is made of steel (pB=7849 kg/m3)
In what direction does the body tend to move?​

Answers

Answer:

  a) up

  b) down

Explanation:

When the cube is less dense than water, it will tend to float (move upward). When it is more dense, it will sink (move downward).

a) 160.2 kg/m^3 < 1000 kg/m^3. The cube will move up.

__

b) 7849 kg/m^3 > 1000 kg/m^3. The cube will move down.

Pie charts should have no more than eight segments. True or False?

Answers

Answer:

Explanation:

Pie charts generally should have no more than eight segments.

No more then 8 segments

which statement about life on earth is true ?

Answers

Answer:

Humans have been on Earth for a very short amount of time.

Explanation:

edgeunity 2021

Answer:

Humans have been on Earth for a very short amount of time<3

D.

Explanation:

Explain any five applications of computer modeling in beams.

Answers

Answer:

Explain any five applications of computer modeling in beams.

Explanation:

What happens to the speed of light if the IOR increases?

Answers

Because index of reflection is defined as the radio between the spray speed of light in a vacuum and the speed of light in a medium as a light traveling to roll the medium increases in speed at index of refraction decreases
Other Questions
Read the passage from "The Beginnings of the Maasai. Our relationship with Enkai is essential to the tribe. Enkai is neither male nor female. The sky god is powerful, but can change from nurturing to vengeful depending on our behavior. Sometimes Enkai is Enkai Narok, the Black God, happy with us and blanketing the sky with dark clouds that pour out rain to nourish the plains. When angry, though, Enkai becomes Enkai Nonyokiethe Red God. In these times, the sun grows incredibly hot until the earth dries up and becomes barren. Because of this, we work to keep Enkai happy. Why is this excerpt a good example of a feature often found in a myth? It features a reference to the earth. It features a reference to the sky. It features a reference to the origin of the tribe. It features a reference to a supernatural being. The most significant technological breakthrough in the early industrial period was an engine that burned coal to boil water and create __________, which was used to drive mechanical devices. Select a company that you think has a strong CorporateSocial Responsibility focus. Justify your choice and explain theattributes of their strategy. how many layers of molecules are in the plasma membrane? Which statement best explains how political parties are able to exertinfluence over U.S. public policy?A. Parties offer campaign funds to candidates who will support theparty's platform once in office.B. Party members work to limit the influence of political actioncommittees on public policy decisions.C. Party leaders bring together voters with opposing values to enablepolicy compromises.D. Parties ensure that their members are unable to voteindependently on most public policy issues. Select the correct answer. An exponential function, f, passes through the points (-2,-4) and (1,10). Which two points would lie on the graph of function g if g(x) = 3f(x)? A. (-6,-4) and (3,10) B. (-2,-1) and (-1,13) C. (-6,-7) and (3,7) D. (-2,-12) and (1,30) Which molecule serves as a subcellular workbench where amino acids are joined together to produce proteins?A. proteinB. ribosomeC. messenger RNAD. transfer RNA employees are motivated only by extrinsic rewards. employees are motivated only by extrinsic rewards. true false What are the natural rights that the Declaration of Independence says a government should protect? Change the speech from direct to indirect. Mom, please dont be angry with me. It was an accident. which of the following best illustrates the declining formality of letters? question 29 options: the omission of old-fashioned salutations and the switch to more modern options the use of letters to communicate with external audiences rather than friends the transfer of email styles of formatting to the letter form the development of a standardized format for letters for use in business scenarios the incorporation of abbreviations and emojis into letters Electrolytes, (to identify a few: na , k , mg cl-), account for approximately ________ of the solutes in the body. Why did the British government conduct general searches of colonists homes and businesses After intense activity, your muscles feel sore because of the accumulation ofNAD+ B-the accumulation of ATP C- the accumulation of lactic acid D- the accumulation of carbon dioxide Question 14 The energy that drives the water cycle originates from: aThe sun bThe global wind system cSurface and ground water dThermohaline circulationL A common theme of romantic artwork during the period of westward expansion was:____.a. nature. b. politics.c. war. d. wealth. Exercising with a friend or partner will enhance your safety. Please select the best answer from the choices provided. T F A 1.50kg snowball is shot upward at an angle of 34.0 to the horizontal with an initial speed of 20.0m/s. a. What is its initial kinetic energy? b. By how much does the gravitational potential energy Which equation is an expression of the rate law?A. PV = nRTB.* = ARC. Rate = K[A][B]"D. KegC D[Al"B harold has a high need for achievement. based on this information, you can most accurately predict that given an opportunity to throw ten free shots from anywhere on a basketball court, harold will stand .