If the project manager changes an activity on the critical path to start at a later date, then the whole project will end at a later date. a. True b. False.

Answers

Answer 1

When the project manager changes an activity on the critical path to start at a later date, then the whole project will end at a later date. This statement is true.

A critical path is defined as the series of connected activities that determine the project’s completion date. The critical path is the longest duration path through the network, and it determines the shortest time to complete the project. It is essential to understand the critical path to complete the project on time.A delay in the critical path will cause the project completion date to slip. The critical path will be changed if there is a delay in any activity, causing the whole project to end at a later date. The critical path will change to the new series of connected activities, which will determine the new project completion date.The critical path method (CPM) is used to manage the project schedule. It is a planning tool used to calculate the project's duration and its critical path. The CPM is used to calculate the project duration and the expected completion date. The CPM is essential for project management and control.The critical path method is a useful tool for managing and controlling project schedules. The CPM is used to determine the duration of the project, the critical path, and the expected completion date. A delay in the critical path can cause the project to end at a later date, and a change in the critical path will determine the new project completion date.

for more questions on project manager

https://brainly.com/question/15610382

#SPJ11


Related Questions

Sally owns a $1,000-par zero-coupon bond that has six years of remaining a. What is the expected price of the bond at the time of sale?

Answers

Answer:

$647.96

Explanation:

Sue the following formula to calculate the price of the bond at the time of sale

Price of Bond = Face value of the bond / ( 1 + Market interest rate )^numbers of years

Where

Face value of bond = $1,000

Market interest rate = 7.5%

Numbers of years = 6 years

placing values in the formula

Price of Bond = $1,000 / ( 1 + 7.5% )^6

Price of Bond = $647.96

Nationwide, alcohol related collisions have a total average cost of $______ per year

Answers

Nationwide, alcohol-related collisions have a total average cost of billions of dollars per year.

These costs encompass various factors, including property damage, medical expenses, legal fees, emergency response services, and loss of productivity. Moreover, alcohol-related collisions can result in severe injuries, loss of life, and long-term physical and emotional consequences for individuals involved. The financial burden extends beyond the immediate costs and affects insurance rates, healthcare systems, and the overall economy. To address this issue, it is essential to prioritize efforts in promoting responsible drinking habits, implementing effective legislation and enforcement, and raising awareness about the dangers of driving under the influence. By doing so, we can strive to reduce the economic and societal impact of alcohol-related collisions.

To learn more about economy, Click here: brainly.com/question/18461883

#SPJ11

the following question asks you to analyze the monopolistically competitive market structure, which has some characteristics of both a monopoly and a competitive market.

Answers

The monopolistically competitive market structure, which has some characteristics of both a monopoly and a competitive market. Both competitive and monopolistically competitive markets are easy to enter and exit in the market. The goods in a monopolistically competitive market is slightly variated or there is product-differentiation while those in competitive markets are homogenous.

What is a monopolistic competition?

Monopolistic competition is a sort of market structure in which numerous businesses are present in a given sector and make comparable but distinctive goods .

None of the businesses has a monopoly, and they all run their own businesses without taking into account what other businesses are doing .

Learn more about the monopolistic competition here:

https://brainly.com/question/28041434

#SPJ1


Working for the Internal Revenue Service is a career in public safety.

A True

B. False

Answers

Answer: Most are so probably A

Explanation:

You can work there and see I don't really know how to explain

3. Equivalent cash price is the present value that is equal to a payment.
O True
O false

Answers

Answer:

Pretty sure its true

Explanation:

Answer: True
Hope this helps you!

chose 10 items to take to a deserted island remember you need shelter there is food on the island and you also may need a fire source........yw have fun

Answers

Answer:

a big tent. my friends. a hamic. wepons. a boat. my phone. portabal charger. and my parents

Explanation

Answer:

Box of Matches

Tent

Canteen

Knife

Blanket

Pot

Bug Spray

Cloths

Flashlight

Journal w/ pencil

Explanation:

These are neccasary for survival !

Which of the following accounts would not
use T-Accounts?
A. Shareholder's Capital
B. Cash
C. Dividends Payable
D. None of the Above

Answers

The answer will have to be C
Answer:

I believe the answer is c.

Explanation:

I did some research

what are the best and worst parts of working in international business?

Answers

Having to deliver is one bad having wider variety or costumers is a good language change witch could cost to have a translator

which of the following would not be an issuer? a) a corporation selling certificates of interest in a mining lease b) an investment company c) a governmental agency borrowing money for short-term needs d) a partnership selling partnership interests

Answers

The one that would not be the issuer will be "a corporation selling certificates of interest in a mining lease."

According to the Uniform Securities Act, selling certificates of interest in mining leases or other comparable assets does not qualify one as an issuer, even though the firm issuing its own stocks and/or bonds would be considered an issuer. We can presume the government entity is issuing a short-term note even if the option does not specify how it is borrowing.A company known as the "Issuer" creates, files for, and sells securities with the intention of funding its activities. Governments, businesses, and investment trusts can all be issuers. An organisation known as an issuer sells investors debt securities or equity securities. To raise money for operations or acquisitions, an issuer sells securities. Governments sometimes issue debt instruments; an issuer need not be a for-profit organisation.

Thus the correct answer is A.

Refer here to learn more about issuer: https://brainly.com/question/24334747

#SPJ4

Who are the communicators between employees and managers? * a. Supervisors b. Shift managers c. Department managers d. General managers

Answers

The communicators between employees and managers is the supervisors as they work to for both side. The Option A is correct.

What is the role of a communicator in a company?

Mainly, business communication is communication that is intended to help a company achieve a fundamental goal by sharing information among employees and people outside the company.

An effective communicator in business seeks to unite the audience by using ideas and language that are appropriate for all readers or listeners of the message. Emotions and logic both influence people. The ethical communicator will be enthusiastic and passionate without being disrespectful.

Read more about communication

brainly.com/question/25645043

#SPJ1

how to make a business title​

Answers

Answer:

In this article, we'll give you eighteen tips for coming up with a great business name.

Use acronyms.

Create mash-ups.

Get inspiration from mythology and literature.

Use foreign words.

Use your own name.

Take a look at a map.

Mix things up.

Partner with another company.

Answer:

try to make it catchy, but relevant to your subject. its easy to remember, not hard to spell, and remember it doesn't have to really really cool, as long as it makes sense, and is easy to remember

Explanation:

stock options have their greatest motivational potential during periods of:

Answers

Stock options have their greatest motivational potential during periods of growth and success for a company.

When a company is experiencing positive momentum, employees who have been granted stock options feel a greater sense of ownership and investment in the company's success. This, in turn, drives them to work harder and contribute to the company's growth, which ultimately benefits both the employee and the company. During periods of growth, stock options become more valuable and desirable for employees. This is because the potential for a higher stock price means greater financial gains for the employee. Additionally, the positive momentum of the company can also lead to increased job security and the potential for career advancement, further motivating employees to work harder and contribute to the company's success.

On the other hand, during periods of decline or uncertainty, stock options may lose their motivational potential as the potential for financial gains diminishes. In these situations, it's important for companies to provide alternative forms of motivation, such as clear communication about the company's strategy and vision, opportunities for learning and development, and a supportive work environment. In summary, stock options have their greatest motivational potential during periods of growth and success for a company, when employees feel a greater sense of ownership and investment in the company's success.

Learn more about stock here:

https://brainly.com/question/14649952

#SPJ11

Suppose a company will issue new 20-year debt with a par value of $1,000 and a coupon rate of 8%, paid annually. The issue price will be $1,000. The tax rate is 35%. If the flotation cost is 2% of the issue proceeds, then what is the after-tax cost of debt? Disregard the tax shield from the amortization of flotation costs. Round your answer to two decimal places. % What if the flotation costs were 11% of the bond issue? Round your answer to two decimal places. %

Answers

Answer:

if the flotation costs were 2%, the after-tax cost of debt is 5.10%

if the flotation costs were 11%, the after-tax cost of debt is 4.63 %

Explanation:

After-tax cost of debt = Market Interest × ( 1 - tax rate)

Calculation of the Market Interest

Hint : Use the time value of money principles

Pv = -$1,000

Pmt = $1,000 × 8 % = $80

P/yr = 1

N = 20

Fv = $1,000

YTM = ?

Using a financial calculator, the market interest is 8%

After-tax cost of debt = Market Interest × ( 1 - tax rate)

                                   = 0.08 × (1- 0.35)

                                   = 0.052 or 5.20 %

If Flotation cost is 2%

Net Receipts after flotation cost = Cost × ( 1 - flotation rate)

                                                     = 5.20 % × (1-0.02)

                                                     = 5.096 % or 5.10% (two decimal places)

If Flotation cost is 11%

Net Receipts after flotation cost = Cost × ( 1 - flotation rate)

                                                     = 5.20 % × (1-0.11)

                                                     = 4.628 % or 4.63 % (two decimal places)

A delivery service is buying 600 tires for its fleet of vehicles. One supplier offers to supply the tires for $85 per tire, payable in one year. Another supplier will supply the tires for $20,000 down today, then $45 per tire, payable in one year. What is the difference in PV between the first and the second offer, assuming interest rates are 8.2\%? A. $872 B. −$3,272 C. $2,181 D. $3,272

Answers

The correct option is B. The difference in PV between the first and second offer is approximately -$3,180.53, which is equivalent to -$3,272 when rounded to the nearest dollar.

For the first offer, the cost per tire is $85 payable in one year, resulting in a total cost of 600 tires * $85 = $51,000. To find the present value (PV), we discount this amount at an interest rate of 8.2% for one year:

PV1 = $51,000 / (1 + 0.082) = $47,105.26

For the second offer, there is an upfront payment of $20,000 today and then $45 per tire payable in one year. The total cost in one year would be 600 tires * $45 = $27,000. To find the PV, we discount the upfront payment and the future payment:

PV2 = ($20,000 / (1 + 0.082)) + ($27,000 / (1 + 0.082)) = $43,924.73

The difference in PV between the two offers is PV2 - PV1:

PV difference = $43,924.73 - $47,105.26 = -$3,180.53

The difference in present value between the two offers is approximately option is B. -$3,272.

Learn more About PV from the given link

https://brainly.com/question/30390056

#SPJ11

Businesses play a role in the circular flow of goods by:

A. Offering natural resources to manufacturing firms
B. Providing labor to resources markets.
C. Creating goods that households want to buy
D. Directly selling products to consumers

Answers

Answer:

C. Creating goods that households want to buy

Explanation:

Supply chain management can be defined as the effective and efficient management of the flow of goods and services as well as all of the production processes involved in the transformation of raw materials into finished products that meet the insatiable want and need of the consumers. Generally, the supply chain management involves all the activities associated with planning, execution and supply of finished goods and services to the consumers.

The main purpose of supply chain management is to provide collaboration between multiple firms. These multiple firms include a company that is saddled with the responsibility of manufacturing, a wholesaler, and a retailer who typically sells the products to the customers or consumers.

Basically, these three (3) firms or individuals are required to collaborate with each other so as to meet the needs of the customers in a timely manner or fashion and at a fair price too.

Hence, businesses play a role in the circular flow of goods by creating goods that households want to buy. These goods are produced to meet the needs or wants of customers (households) and as such making them willing to buy it.

Answer:

Turning resources into products for sale

Explanation:

What type of an IRA would a woman approaching her 74th birthday but still earning a comfortable income through the sale of her popular mystery novels?
a traditional IRA
a Social Security underwritten IRA
a Roth IRA
an IRA based on investment returns exclusively​

Answers

Answer:

1 an accounting practice that tracks both credits and debits

2 signing the back of a check before you can deposit it into your account

3 an amount of money extended by a bank of financial institution and ready for the borrower to use at any time provided the latter adheres to certain rules and regulations

4 the individual who receives the funds on a check; the person who the check is written to

5 the person or business writing the check; the owner of the checking account on which the check is being written

Explanation:

Answer:

fu c k

Explanation:

1.What steps can be taken to preserve the integrity of the Craft Fair
event while still supporting the Art Club amidst budget cuts?
2. Who are the stakeholders involved in Mr. Kim's decision? In what
way(s) are they potentially impacted and to what extent?
3. How transparent should businesses be about their decisions
regarding quality level and pricing? How does this affect trust in the
companies and decisions you make to purchase?
4. Describe a situation in which you were either completely satisfied
with the quality and price of a purchase OR disappointed in the
quality and price of a purchase.

1.What steps can be taken to preserve the integrity of the Craft Fairevent while still supporting the

Answers

The  steps that  can be taken to preserve the integrity of the Craft Fair is:  To preserve the integrity of the Craft Fair event while supporting the Art Club amidst budget cuts, several steps can be taken.

What steps can be taken to preserve the integrity of the Craft Fair event?    To preserve the integrity of the Craft Fair event while supporting the Art Club amidst budget cuts, several steps can be taken. First, the event organizers could consider reducing the number of vendors and increasing the quality of the products on display.  This would help to maintain the prestige of the event and attract buyers who are interested in high-quality, unique items. Second, they could explore alternative sources of funding, such as corporate sponsorships or crowdfunding. Finally, they could consider partnering with other organizations or businesses to co-host the event and share costs.

   The stakeholders involved in Mr. Kim's decision include the Art Club members, the vendors who participate in the Craft Fair, the buyers who attend the event, the school administration, and the broader community.  Art Club members are potentially impacted by potential budget cuts, while vendors may be affected by changes in event quality or pricing. Buyers may be impacted by changes in the quality of products on display or the overall atmosphere of the event.

   Transparency is important in maintaining trust with customers. Businesses should be open and honest about the quality of their products and services, as well as their pricing policies. This can help to build a reputation for integrity and reliability, which can lead to increased customer loyalty and long-term success. However, it is also important to balance transparency with the need to maintain a competitive edge in the marketplace.

   Recently, I purchased a pair of running shoes that I was completely satisfied with. The price was reasonable, and the quality was excellent. The shoes were comfortable and durable, and they helped me improve my running performance. In contrast, I once purchased a smartphone that was disappointing in terms of both quality and price. The phone was slow and buggy, and it did not live up to the promises made in the advertising. Additionally, the price was much higher than comparable devices on the market, which made the disappointment even more acute.

Learn more about integrity here:https://brainly.com/question/30398377

#SPJ1

the margin of safety for the miter saw is?
A. two inches
B. three inches
C. four Inches
D. six inches

Answers

Answer:

D six inches

Explanation:

Your still cute

Answer: D. Six inches MINIMUM margin of safety at all times.

If the firm can vary all factors of production, it is operating
in the short run.
in the long run.
at a zero economic profit.
at a profit.

Answers

If a firm has the ability to vary all factors of production, it means that they have the flexibility to adjust their inputs such as labor, capital, and raw materials to achieve maximum profitability.

This implies that the firm can efficiently allocate its resources to produce the desired level of output at the lowest possible cost.

When a firm can vary all factors of production, it can effectively respond to changes in the market demand and adjust its production levels accordingly. This way, they can increase output during high demand periods and reduce production during low demand periods, allowing them to maintain a steady profit.

Moreover, having the ability to vary all factors of production means that the firm can adopt cost-saving measures such as sourcing cheaper raw materials or automating their production processes to reduce labor costs. This helps them to increase profit margins and remain competitive in the market.

Overall, a firm that can vary all factors of production has the flexibility and adaptability to maximize profits by efficiently allocating its resources to produce goods and services at the lowest possible cost.

For more about production:

https://brainly.com/question/31859289

#SPJ11

The gold standard for mini studies is blank how to spot bad science

Answers

The gold standard for mini studies is not applicable as mini studies are not considered as reliable sources of evidence.

In order to spot bad science, it is important to look for red flags such as small sample sizes, lack of control groups, cherry-picked data, and conflicts of interest.

Mini studies, also known as pilot studies or exploratory studies, are small-scale investigations that are often conducted as a preliminary step before conducting larger studies.

Although they can provide useful insights and generate hypotheses, they are not considered as reliable sources of evidence due to their limited sample sizes and lack of statistical power.

To spot bad science, it is important to look for red flags such as small sample sizes, lack of control groups, cherry-picked data, and conflicts of interest. Additionally, it is important to assess the quality of the research design, methodology, and statistical analysis, as well as to consider the potential biases and limitations of the study.

For more questions like Mini click the link below:

https://brainly.com/question/16665973

#SPJ11

Need Help

Ted is a single guy who’s living the good life. The spreadsheet below shows Ted’s cash flow for a month.

Based on his monthly cash flow, explain what part of Ted’s financial plan might be missing and why.

Need Help Ted is a single guy whos living the good life. The spreadsheet below shows Teds cash flow for

Answers

Answer:

Ted's net cash flow is zero. Therefore, he might want to work on managing his income to get a positive net cash flow. There is no indication that Ted is putting any money in savings.

Hope it helps!

Marcel wants to open a car wash after graduating from high school. For several days, he observed the cars being washed at a local car wash and recorded the following information: Day 1 Day 2 Day 3 Day 4 Day 5 Day 6 50 cars 45 cars 48 cars 26 cars 47 cars 55 cars What is the average number of cars washed each day? If the car wash were open only five days a week, how many cars might be washed per year? (Hint: There are 52 weeks in a year.)

Answers

The average number of cars washed each day is 45 cars and the total number of cars washed in a year is 11,700.

What is mean?

In statistics, in addition to the mode and median, the mean is one of the measures of central tendency. Simply put, the mean is the average of the values in the given set. It indicates that values in a particular data set are distributed equally. The three most frequently employed measures of central tendency are the mean, median, and mode. The total values provided in a datasheet must be added, and the sum must be divided by the total number of values in order to determine the mean.

Given a table for car washing each day,

Day 1      Day 2    Day 3   Day 4      Day 5    Day 6

50            45          48         26        47            55

Average for cars washed each day,

Average = sum of cars washed/number of days

 sum of cars washed = 50 + 45 + 48 +26 + 47 + 55

the sum of cars washed = 271

total days = 6

average = 271/6 = 45.1667

average car washed each day = 45

If the car wash were open only five days a week, how many cars might be washed per year,

total car washed in year = (number of days)(average car washed)(year week)

total car washed in year = 5 x 45 x 52

total car washed in year = 11,700

Hence average car washed each day is  45 and the total car washed in a year is 11,700.

Learn more about mean;

https://brainly.com/question/521501

#SPJ1

The blank is the the minimum amount of your bill you must pay each month.

Answers

minimum payment

the least amount of money that must be paid at the end of a month

Pretend you are President of the United States. The Citizens and the economy of the USA need financial assistance to get back on their feet. List and describe three fiscal Policies you would initiate (describe each policy in 3 sentences):

Answers

Assuming i am the President of U.S. and the country needs a financial assistance to get back on their feet. The most likely fiscal Policies we would initiate are the:

contractionary fiscal policyexpansionary fiscal policy

What do we call a Fiscal policy?

In economics, a fiscal policy refers to a governmental decision to increase or decrease taxation and spending. Most time, a Fiscal and monetary policy are often used together to influence the economy. But the fiscal policy can affect a company’s growth, hiring ability and taxes.

We have 3 types of fiscal policy which includes a neutral, expansionary, and contractionary fiscal policy. The neutral policy is one where government takes no steps to provide economic support because it feels the economy is healthy and stable, the expansionary fiscal policy mainly involves increasing spending or cutting taxes to prevent or end a recession or depression and the contractionary fiscal policy involves cutting spending or raising taxes to slow down unsustainable economic growth.

Read more about Fiscal policy

brainly.com/question/6583917

#SPJ1

_____ tend to move in anticipation of the business cycle, turning up in anticipation of recovery and turning down at signs of economic weakness. a. Capital goods b. Financial stocks cyclical companies do. Consumer staples e. Consumer durable goods

Answers

Capital goods tend to move in anticipation of the business cycle, turning up in anticipation of recovery and turning down at signs of economic weakness.

When janelle decided to buy a new computer, she thought about all the brands she could recall seeing advertised, but when she visited her local best buy, she limited her search to only those brands she would consider buying. the brands available at best buy represent janelle's set.

Answers

Situational influences are transient circumstances that have an impact on consumer behavior.They include tangible elements like a store's layout, buying areas, music, lighting, and even odors.Businesses work to improve the physical conditions that shoppers encounter.

What are the situational factors that could alter the consumer decision making at the time of purchase?The likelihood that someone will go through all six stages of the purchasing process is probably limited to specific circumstances, such as when purchasing a thing for the first time or when purchasing expensive, durable, infrequently used items.Complex decision-making is what is meant when this occurs. Which of the aforementioned purchases would consumers be most likely to make with limited problem-solving.A regular coffee drinker's typical purchase is generally coffee to go.But problem solving skills will likely be reduced as a result of college courses. Physical surroundings, social surroundings, temporal perspective, task description, and antecedent state are the five components that make up situational factors. There are four different forms of consumer behavior: complex buying behavior, dissonance reduction, variety seeking, and habitual buying behavior. Consumer decision-making can appear complicated, but all buyers follow the same fundamental stages to choose the goods and services that will best meet their needs.Whether purchasing something, especially when it's something substantial like a car, consider your own thought process. When acquiring high-involvement products, buyers don't exhibit routine response behavior.Instead, they participate in what is known as prolonged problem solving, spending a lot of time weighing various factors such product features, costs, and warranties.

To learn more about decision making refer

https://brainly.com/question/1249089

#SPJ4

Graff, incorporated, has sales of $49,800, costs of $23,700, depreciation expense of $2,300, and interest expense of $1,800. if the tax rate is 22 percent, what is the operating cash flow, or ocf?

Answers

The operating cash flow of Graff, incorporated is $19,460

What is operating cash flow?

The operating cash flow is the net income plus the depreciation expense, whereby the depreciation expense is added back  because it is an outright cash outflow.

In this case, we need to first of all determine the net income considering the sales, costs, interest expense and tax

net income=(sales-costs-depreciation-interest)*(1-tax rate)

net income=($49,800-$23,700-$2,300-$1,800)*(1-22%)

net income=$17,160

OCF=$17,160+$2,300

OCF=$19,460

Find out more about OCF on:https://brainly.com/question/16941057

#SPJ1

_____________, fill in the blank, requires that sales associates be friendly, knowledgeable, and helpful.

Answers

It should be noted that Personal selling requires that sales associates be friendly, knowledgeable, and helpful.

What is Personal selling all about?

Personal selling  can be regarded as face-to-face selling where someone  who is the salesman tries to convince the customer in buying a product.

It serves as a promotional method by which the salesperson uses his or her skills to sell goods.

Learn more about Personal selling at;

https://brainly.com/question/7156426


Which of the following is not an example of professional behavior
?

Answers

What are the answers?

Help quickly please! economics!
Can someone tell me why wealth gaps are common in countries with capitalism?

Answers

A strict definition of capitalism is a society where capital is privately owned, and workers paid wages by private firms. Essentially it is a society with minimal government intervention and resources are distributed according to the outcome of free markets.

Essential (fair) inequalities:

Profit motive: A basic principle of capitalism is that individuals are motivated by the profit incentive. For example, entrepreneurs undertake a risky venture to set up firms because they hope to make a substantial profit. If there was not this profit incentive, entrepreneurs would not undertake the risk of setting up a firm. Therefore, you can say the potential of reward makes inequality an essential ingredient of capitalism.

You could argue people may have other motivations for setting up a business than just higher incomes, but most would agree higher income is an important consideration – if not overriding motive.

Work Incentive: Inequality is also important to motivate workers. If every worker received the same wage regardless of skill and effort, there would be no incentive to learn new skills and work hard at the job. A firm in a capitalist society can pay successful workers a higher wage to reflect their higher productivity. This will lead to wage inequality, but without it it would be hard to motivate workers.

Not necessary (unfair) inequalities:

Monopoly Power: The above types of inequality may seem ‘fair’ or justified. If you work hard, you get to benefit from your enterprise. However, capitalism can also lead to inequality which may be seen as unfair. For example, a firm may develop monopoly power. Then it is in a position to charge consumers artificially high prices and deter entry. If firms have monopsony power, they can get away with paying a wage much lower than the productivity of the worker. Workers have no choice but to work for a very low wage. Therefore, capitalists with access to private property can ‘exploit’ their monopoly power to make a much higher profit than other people in society.

Inheritance: Another aspect of capitalism is that private property can be passed on from one generation to another. Therefore those who inherit capital can enjoy high income even without any effort. They have access to best private education and jobs. This creates inequality of opportunity as well as inequality of opportunity.

These types of inequality mean that there isn’t a level playing field; some in society get an unfair advantage, there isn’t equality of opportunity.

Note: I have written this answer because this is what they teach us in economics. But I am a strong supporter of capitalism.

Other Questions
17. Which Of These Partial Proteins Was Most Likely Assembled By A Thermophile? A. Gly-Gly-Pro-Arg-Arg-Cys-Cys-Gly B. Cys-Met-Met-Arg-Asp-Asp-Asp-Pro C. Pro-Pro-Arg-His-Pro-Pro-Pro-Gly D. Met-Gly-Cys-Pro-Arg-Arg-Pro-Arg write the method computewages. assume that itemssold has been filled appropriately, and there are at least three employees in the array. assume also that the wages array and the itemssold array have the same length. your solution must call computebonusthreshold appropriately to receive full credit. /** computes employee wages as described in part (b) * and stores them in wages. * the parameter fixedwage represents the fixed amount each employee * is paid per day. * the parameter peritemwage represents the amount each employee * is paid per item sold. */ public void computewages(double fixedwage, double peritemwage) Identify the consumer protection law that applies to each of the situations below.1. Keisha applied for a credit card. She has a good credit record and earns a good income. Before Keisha was divorced, she had no problem getting a credit card. Recently she has been turned down by a major credit card company.Which credit protection law has been violated?Under this law, what can Keisha do?2. vUnder this law, what can Neil do?3. Jenny received her credit card bill and found a $250. charge for a media player she never purchased. She called the credit card company to report the mistake.Which law was written to protect people from billing mistakes?Under this law, how must Jennifer handle this situation?4. Randy was denied a credit card from his favorite store. He wants to see his credit file to find out what information is keeping him from getting the credit card.Which law was written to allow people access to their credit file?What can Randy do if he sees mistakes?5. What is "bait and switch" and how can you protect yourself? which of the following is the best sample for a professional polling organization to poll on the governor's race in texas? Which of the following are classified as Accounts Receivable? (This question may have multiple answers) Check All That ApplyTax refunds owed to us by the IRS. Monies that customers owe us for providing a service. Monies that customers owe us from sale of merchandise. Loans we made to a customer. solinux, inc., is a young start-up company and will not pay dividends on its stock for the next 8 years, since the firm needs to plow back its earnings to fuel growth. the company will then pay a $2.22 per share dividend in year 9 and will increase the dividend by 5.7 percent per year thereafter. if investors require 7.9 percent return to invest in this stock, what is its current share price? (do not include the dollar sign ($). round your answer to 2 decimal places (e.g., 32.16). Suppose the reaction temperature X (in C) in a certain chemical process has a uniform distribution with A = -7 and B = 7.(a) Compute P(X < 0).(b) Compute P(-3.5 < X < 3.5).(c) Compute P(-5 X 6).(d) For k satisfying -7 < k < k + 4 < 7, compute P(k < X < k + 4). Intercept form 4x + 5y = 20 the _____ process draws upon logic, imagination, intuition, and systemic reasoning to explore possibilities and created desired outcomes. Company C showed a profit of $1.6 million last year. The CEO of the company expects the profit to decrease by 8% each year over the next five years and the profits will be continuously invested in an account bearing a 4.75% APR compounded continuously.(a) Write the flow rate, R, of the income stream. (Let t represent the number of years after the company showed a profit of $1.6 million.)R(t) = ____________ million dollars per year(b) Calculate the 5-year future value. (Round your answer to three decimal places.)$_______ million(c) Calculate the 5-year present value. (Round your answer to three decimal places.)$ ________ million For the best system, calculate the ratio of the masses of the buffer components required to make the buffer. Express your answer using two significant figures. NH3/NH4Cl ph=8.95 a clock has an hour, minute, and second hand, all of length $1$. let $t$ be the triangle formed by the ends of these hands. a time of day is chosen uniformly at random. what is the expected value of the area of $t$? how are the two cells forming sperm different than the two cells forming eggs at the end of telophase 1 What do you think was the reasons of Ms. Sagrado in coming up with a pot as business? Which of the following lists has one rock from each major category (igneous, sedimentary, metamorphic) that contains quartz? basalt, limestone, greenstone basalt, sandstone, greenstone O granite, limestone, schist O granite, sandstone, gneiss A _____ shows a logical structure, with all possible combinations of conditions and resulting actions.a. decision tableb. validation tablec. database tabled. pseudo table atlas door created competitive advantages in overall low cost leadership and differentiation by creating _____ among value-chain activities. group of answer choices a. linkagesb. disadvantages c. substitutesd. advantages The ____________ layer is the bottom layer, whose job it is to convert bits into signals and vice versa. rank the following alkyl halides in order of their increasing rate of reaction with triethylamine: iodoethane 1-bromopropane 2-bromopropane A person has three liters of extracellular water in blood (vascular volume). Assuming 70% of the body weight is from water. Calculate the weight of this person.