Microsoft Project M&C Earned value Management
On the basis of your study of EVM, assuming that the status date is 30th Oct, please prepare your answer for two scenarios:
The delay in the project work was due to overestimation of equipment capacity (Using MS Project)
The delay was due to an interruption in the project work caused by heavy rainfall (using Excel )
For each scenario,
1. When do you think the project will be completed, (assume -20 work days in a month)?-
2. How much money the project is going to cost when complete?
3. What should be your actions at this point to bring the financial aspect of the project under control?

Answers

Answer 1

Earned Value Management (EVM) is a project management methodology that uses the relationship between cost, work, and work completion status to monitor project performance.

It is used to determine how much the project has cost compared to what it was planned to cost, how much work has been completed compared to what was planned, and the estimated completion time and cost of the project. The delay in the project work was due to overestimation of equipment capacity (Using MS Project)1.  The budgeted cost of the project was $120,000. The actual cost of the project until 30th Oct is $60,000. However, due to the delay, the final cost is estimated to be $168,000.3.

In order to bring the financial aspect of the project under control, it is recommended to take the following actions:Re-estimate the project and include the actual completion rates, estimated future completion rates, and anticipated costs of the project.  Communicate the revised project schedule and cost estimates to all stakeholders. Evaluate the reasons for the delays and use them as lessons learned for future projects.

To know more about methodology visit:

https://brainly.com/question/30732541

#SPJ11


Related Questions

A customer purchases a new phone from an online store. although the customer did not create the phone themselves, there are still carbon emissions that result from producing the phone in a factory and shipping it overseas to the customer. which type of emissions are described in this example?

Answers

Option 1. The type of emission that is described here in this question based on the carbon that is emitted is the scope 2 emission.

What is meant by carbon emission?

This is the term that is used to refer to the emission of carbon due to the activities that humans engage in the environment. The emission is usually from the burning of fossil fuel in the environment.

The scope 2 emission are referred to as the emissions that occurs indirectly due to a purchase that was done. The purchase could be the buying of certain goods as the phone in this case.

Read more on carbon emissions here: https://brainly.com/question/22916556

#SPJ1

Complete question

A customer purchases a new phone from an online store. Although the customer did not create the phone themselves, there are still carbon emissions that result from producing the phone in a factory and shipping it overseas to the customer.

Which type of emissions are described in this example?

1) scope 2

2) scope 3

3) scope 0

4) Scope 1

Looking for information about the Cares Act. 1. Introduction of the policy: What is the policy? When and where the policy was introduced. What is the economic problem that 1 Page 2 of 5 this policy attempted to address? What are the intended economic goals? 2. Who is interested in the policy: Who are the economic agents (individuals, organizations, movements, firms, political Tparties, etc.) pushing this policy forward? Who opposed the policy? What was the incentive framework of those agents? Discussing the positions of democratic and republican parties is necessary but not enough. Add other groups to your discussion. 3. Impact of the policy: State the impact of the policy in different areas. Be specific about outcomes. For example, if your policy is the Cares Act of 2020 , does it reduce unemployment/poverty, increase consumer spending, improve vaccination efforts, etc. Use data and graphs/charts to explain those effects. When using a aranh docrilw the ohar How dowe the ehart evolain the imnact this policy attempted to address? What are the intended economic goals? 2. Who is interested in the policy: Who are the economic agents (Individuals, organizations, movements, firms, political parties, etc.) pushing this policy forward? Who opposed the policy? What was the incentive framework of those agents? Discussing the positions of democratic and republican parties is necessary but not enough. Add other groups to your discussion. 3. Impact of the policy: State the impact of the policy in different areas. Be specific about outcomes. For example, if your policy is the Cares Act of 2020, does it reduce unemployment/poverty, increase consumer spending, improve vaccination efforts, ETtc. Use data and graphs/charts to explain those effects. When using a graph, describe the chart. How does the chart explain the impact of the policy? 4. Evaluation of the policy: Did the policy achieve its goal? Include the expert opinion by answering the question, what do economists think about the policy (cite your sources). What do you think about the future of the policy and the economic problem it attempts to address?

Answers

1. Introduction of the Policy

The CARES Act, or the Coronavirus Aid, Relief, and Economic Security Act, was introduced on March 27, 2020, by the United States Congress. The main purpose of this act was to offer economic support and aid to individuals, businesses, and industries affected by the COVID-19 pandemic. The economic issue that this policy attempted to address was the economic downturn caused by the pandemic, which led to high rates of unemployment, poverty, and a decline in economic activity. The intended economic goals were to stabilize the economy, protect jobs and businesses, and support healthcare efforts in response to the pandemic.

2. Interested Parties and Opponents of the Policy

Economic agents interested in pushing the CARES Act forward include individuals, businesses, labor unions, and government officials from both the Democratic and Republican parties. The policy was opposed by some conservative Republicans who believed that it would encourage unemployment and create dependency on the government. However, many economists and government officials believed that the policy was necessary to prevent further economic decline.

3. Impact of the Policy

The CARES Act had a significant impact on the US economy, providing a range of benefits to individuals and businesses. Some of the main outcomes include:Reduction in unemployment rates, which fell from 14.8% in April 2020 to 6.0% in March 2021.Boost in consumer spending, which increased by 4.3% in the fourth quarter of 2020.Stabilization of financial markets and support for small businesses and industries.Improvement in vaccination efforts and healthcare infrastructure through funding for healthcare providers, hospitals, and medical research.In general, the CARES Act was effective in addressing the economic issues caused by the pandemic. While some critics have argued that the policy was too expensive and could lead to inflation, most economists agree that it was necessary to prevent a more significant economic downturn.

4. Evaluation of the Policy

Overall, the CARES Act achieved its intended economic goals by providing support to individuals, businesses, and industries during the pandemic. Many economists believe that the policy was necessary to prevent further economic decline and stabilize financial markets. However, the future of the policy remains uncertain, as it is not clear how long the pandemic will last and how the economy will respond in the long term.

To learn more about Cares Act: https://brainly.com/question/28853902

#SPJ11

for business and personal finance: What is insurance?

Answers

Answer:

Insurance is the procedure by which persons or companies exposed to a specific risk agree with an institution specializing in compensation for damage that the institution will indemnify the damage caused when the risk materializes. The resulting contract is called insurance.

From a commercial point of view, insurance can be defined as the means by which the cost of incidental damage can be converted evenly into a continuous annual cost on an annual basis.


Examine the supply and demand schedules for cell phones. How much would
a seller charge if he or she wanted to sell cell phones for their equilibrium
price

Answers

Answer: $400

Explanation:

What are sets in set A and not in set B and C called?​

Answers

Explanation:

Set Difference: The relative complement or set difference of sets A and B, denoted A – B, is the set of all elements in A that are not in B. ... Then the set difference of A and B would be the $407 remaining in the checking account. Example: Let A = {a, b, c, d} and B = {b, d, e}. Then A – B = {a, c} and B – A = {e}.

Common Symbols Used in Set Theory

Symbols save time and space when writing. Here are the most common set symbols. In the examples C = {1, 2, 3, 4} and D = {3, 4, 5} Symbol. Meaning.


Which is an umbrella term referring to any type of Internet transaction?

Answers

Answer:

e-business

Explanation:

Which is an umbrella term referring to any type of Internet transaction? useful. Businesses evaluate the quality and source of the information they obtain to make sure the information is: It may be one part of a business's overall information management program.

Answer:

e-business

Explanation:

e-business is an umbrella term referring to any type of Internet transaction

When making decisions, managers often must decide between doing what is beneficial for the firm in the short term, and what is beneficial for both the firm and society in the long term. To address this conflict, a firm must

Answers

When making decisions, managers are often faced with a conflict between what is beneficial for the firm in the short-term and what is beneficial for both the firm and society in the long-term.

This conflict arises because the actions that benefit the firm in the short-term may not necessarily align with the interests of society as a whole, which can lead to negative consequences for both the company and society in the long-term.

To address this conflict, a firm must adopt a long-term orientation and consider the broader social and environmental impacts of its decisions. This means looking beyond immediate financial gains and recognizing that actions taken today can have far-reaching implications for the company's reputation, customer loyalty, employee morale, and overall sustainability.

Firms that prioritize social responsibility and sustainable business practices are more likely to build strong relationships with stakeholders, including customers, employees, investors, and regulators. They are also better equipped to weather economic downturns and other disruptions, as they have diversified their risk and invested in building resilient supply chains and communities.

Ultimately, the key to addressing the conflict between short-term gains and long-term benefits is a commitment to corporate social responsibility (CSR) and sustainable business practices. By prioritizing the needs of society and the environment alongside those of shareholders, firms can create value for all stakeholders over the long-term, ensuring their continued success and impact.

learn more about managers here

https://brainly.com/question/32150882

#SPJ11

i am so coufued "what i am going to in future, i am very good in art and math and cooking and pe?

Answers

Answer:

you can be a artist or chef

Answer:

You can start up an art themed restaurant.

Explanation:

You are very talented, you could even enter cooking shows to practice and improve on ur cooking skills.

Very many people have are paintings in their homes, selling your art could earn you plenty of income.

PLEASE MARK BRAINLIEST :))

Select the qualification that is best demonstrated in each example.

Hugh is a Court Clerk who schedules appointments for a court of law.

Sergio spends a lot of time each day sorting mail.

Ayesha gathers information by interviewing people and reviewing documents.

Answers

Answer:

organizational skills

patience

research skills

Explanation:

Select the qualification that is best demonstrated in each example.Hugh is a Court Clerk who schedules
Hugh is a court clerk who makes appointments for a court of law, which illustrates his organizing abilities.Sergio spends a lot of time sorting letters every day. represent your patience.Research abilities are represented by the statement, "Ayesha acquires information through interviewing people and reviewing documents."

What are organizational skills?

A person can increase the effectiveness of problem-solving, future-focused learning, and task completion by using a variety of organizational skills. To achieve a predetermined goal, organization is required to integrate a number of components.

You may use your resources effectively and efficiently if you have the necessary organizational abilities. You can successfully complete all of your allocated chores if you have good time, energy, and workspace management skills. Depending on your employment and job title, organizational abilities can take many different shapes; nevertheless, they almost always involve keeping your workspace organized, managing deadlines, and working effectively with others.

Learn more about organizational skills, from:

brainly.com/question/14897426

#SPJ2

What do individuals and households provide to the government?

Answers

Money we pay taxes and it goes to the government

1. Four electricians are discussing special requirements for health care facilities. Electrician A says that a nursing home is required to include an emergency system circuit. Electrician B says that GFCI outlets are required in the bathroom area of some critical-care patient rooms. Electrician C says that a nursing home is not required to include an emergency system circuit. Electrician D says that GFCI outlets are required in the bathroom area of the critical-care patient rooms. Which of the following statements is correct?

A. Electrician C is correct.
B. Electrician A is correct
C. Electrician D is correct
D. Electrician B is correct.

2. Four electricians are discussing wiring under raised floors in information technology equipment rooms. Electrician A says that wiring under the raised floor requires fire-resistant walls, floors, and ceilings between other occupancies. Electrician B says that wiring under the raised floor requires fire resistant halfway up the walls and floors between other occupancies. Electrician C says that the room must employ a disconnecting means that removes half of the power to all equipment in the room. Electrician D says that a disconnecting means isn't necessary for the room. Which of the following statements is correct?

A. Electrician B is correct.
B. Electrician C is correct.
C. Electrician D is correct.
D. Electrician A is correct.

3. Five electricians are discussing grounding. Electrician A says that 6" of an 8' rod or pipe electrode is allowed to extend above the finished grade. Electrician B says that a "made" grounding electrode constructed from copper rod that’s 5/8" in diameter and 100" long is acceptable per the NEC. Electrician C says that 6" of a 16' rod or pipe electrode is allowed to extend above the finished grade. Electrician D says that a "made" grounding electrode constructed from copper rod that's 5/8" in diameter and 50" long is acceptable per the NEC. Which of the following statements is correct?

A. Electrician C is correct.
B. Electrician B is correct.
C. Electrician D is correct.
D. Electrician A is correct.

4. Where resistance to ground of a single-made electrode exceeds 25 ohms,

A. additional electrodes must be added until the resistance to ground is lower than 25 ohms.
B. the electrode can be omitted.
C. no additional electrodes are required.
D. one additional electrode must be added.

5. According to the NEC, what type of threadless connectors and couplings must be used with rigid metal conduit if installed in masonry?

A. Rain tight.
B. Concrete tight.
С. Weatherproof.
D. Wet/damp listed.

6. Four electricians are discussing NEC requirements for common appliances.
Electrician A says that new, cord-and-plug, single-phase room A/C units must have factory-installed LCDI or AFCI protection. Electrician B says that the cord for a household refrigerator must be visible and readily accessible to be used as a disconnect switch. Electrician C says that the cord and plug don't have to be new. Electrician D says that an old cord with a spliced new plug can be used. Which of the following statements is correct?

A. Electrician A is correct.
B. Electrician B is correct.
С.Electrician C is correct.
D.Electrician D is correct.

7. Four electricians are discussing switchboards and panelboards. Electrician A says that switchboards and panelboards must provide front and rear access to meet accessibility requirements. Electrician B says that unused circuit breakers mounted in a panelboard should not be identified on the circuit directory until they're actually connected for a circuit application. Electrician C says that switchboards can be installed in cabinets. Electrician D says that switchboards aren't intended to be installed in cabinets. Which of the following statements is correct?

A. Electrician C is correct.
B. Electrician D is correct.
C. Electrician A is correct.
D. Electrician B is correct.

8. Four electricians are discussing the installation of a luminaire in a clothes closet.
Electrician A says that because the clothes-hanging rod is located five inches from the ceiling, the light fixture that's to be mounted directly over the rod must be recessed.
Electrician B says that a surface-mounted incandescent fixture must be placed at least six inches from the storage area. Electrician C says that a surface-mounted incandescent fixture must be placed at least 12 inches away from the storage space. Electrician D says that a surface-mounted incandescent fixture must be placed at least nine inches away from the storage space. Which of the following statements is correct?

A. Electrician B is correct.
B. Electrician A is correct.
С. Electrician C is correct.
D. Electrician D is correct.

Answers

The correct options are

B. Electrician A is correct.

D. Electrician A is correct.

B. Electrician B is correct.

A. Additional electrodes must be added until the resistance to ground is lower than 25 ohms.

B. Concrete tight.

A. Electrician A is correct.

C. Electrician A is correct.

A. Electrician A is correct.

What are electricians?

Generally, An electrician is a skilled laborer who specializes in the electrical wiring of structures, transmission lines, stationary machinery, and other apparatus that is connected to the field.

Installing new electrical components, repairing and maintaining existing electrical infrastructure, and maintaining and repairing existing electrical infrastructure are all possible jobs for electricians.

Read more about electricians

https://brainly.com/question/27073052

#SPJ1

_____ are distribution channel members that buy finished products from manufacturers and sell them to retailers.

Answers

Wholesalers are distribution channel members that buy finished products from manufacturers and sell them to retailers.

Who is a manufacturer?

A manufacturer is a company or entity that produces goods or products on a large scale. They are involved in the creation, production, and assembly of finished goods using raw materials, components, or parts.

Manufacturers can range from large industrial facilities that produce machinery and equipment to smaller-scale operations that produce consumer goods such as electronics, clothing, or food products.

learn more about manufacturer: https://brainly.com/question/13440987

#SPJ4

Chemco Enterprises is the manufacturer of Ultra-Dry, a hydrophobic coating that will waterproof anything. Over a 5-year period, the costs associated with the pilot test product line were as follows: first cost of $36,000 and annual costs of $18,000. Annual revenue was $33,000 and used equipment was salvaged for $4,000.



Required:


What rate of return did the company make on this product?

Answers

The company made a rate of return of 25% on the product.

To calculate the rate of return on the product, we need to determine the net profit and divide it by the initial investment.

The initial investment includes the first cost of $36,000. The annual costs of $18,000 are considered operating expenses and are not included in the initial investment.

The net profit is calculated by subtracting the total costs (including the first cost) from the total revenue. The total costs over the 5-year period would be $36,000 + ($18,000 × 5) = $126,000. The total revenue would be $33,000 × 5 = $165,000.

The net profit is $165,000 - $126,000 = $39,000.

To calculate the rate of return, we divide the net profit by the initial investment and multiply by 100 to get a percentage.

Rate of return = ($39,000 / $36,000) × 100 = 108.33%.

Therefore, the company made a rate of return of approximately 108.33% on the product.

Learn more about net profit, below:

https://brainly.com/question/32239002

#SPJ11

If MPC =4/5, actual GDP = $600 and potential GDP = $640, there
is a ____
(recessionary / inflationary) gap of $__ and a ____ (decrease /
increase) in government
spending of $__ would eliminate the gap

Answers

There is a recessionary gap of $40 and a increase in government spending of $40 would eliminate the gap.

The recessionary gap is determined by the difference between actual GDP and potential GDP. In this case, the actual GDP is $600 and the potential GDP is $640, resulting in a gap of $40.

To close the recessionary gap, an increase in government spending is required. By increasing government spending by the same amount as the gap ($40), it would stimulate the economy and increase aggregate demand, leading to an increase in GDP. This increase in government spending would help bridge the gap and bring the economy closer to its potential level of output.

Learn more about   recessionary gap here:

https://brainly.com/question/33447432

#SPJ11

how existing businesses changed the way they operate to keep afloat during the lockdown periods.

Answers

Answer:

Combine speed and stabilityTurn digitization into an advantageDrive systemic change through cooperation

Explanation:

Food places opening take away
Office companies moving to at home working
Shops creating online shops

Malaki ran 9,656 meters on Monday and 4,687 meters on Tuesday. How many more meters did she run on Monday than on Tuesday?

Answers

Answer: 4969 meters

Explanation: Here's what you do: 9,656 - 4,687 = 4969

Answer: 4969 meters

Explanation:

PLZ HELP: FIND THE PROFIT
Fixed costs are £26,000 per year, and variable costs include wages at £10 per
unit, raw materials at £12 per unit and delivery/packaging at £3 per unit. It is expected that a business will make and sell 750 units during the year, with
a selling price of £26.

Answers

Answer:

Net loss -£25,250

Explanation:

The computation of the profit is shown below:

Sales (750 units × £26) £19,500

Less: Variable cost  (750 units × £25) £18,750

Contribution margin £750

Less: Fixed cost £26,000

Net loss -£25,250

The £25 could be calculated below:

= £10 + £12 + £3

= £25

Basically applied the above format

4.2. Why do you think capital is important?​

Answers

Answer:

Capital is important because it's that part of an asset that can be used to repay its depositors, customers, and other claimants in case the bank doesn't have enough liquidity due to losses it suffered in its operations. Capital also helps the bank in times of a liquidity crisis.

Question 3 1 points Ehsan contributed a building at $22.500 and a land valued at $60,000. The journal entry to record this transaction for the partnership is OA Ehsan, Capital 89,100 Building 22,500 L

Answers

By making this journal entry, the partnership properly records Ehsan's capital contribution, ensuring accurate tracking of the partners' capital accounts and reflecting the increased value of the partnership's assets due to Ehsan's contribution of the building and land.

To record Ehsan's contribution of a building valued at $22,500 and land valued at $60,000 to the partnership, the journal entry would be as follows:

Date: [Date of the transaction]

Debit: Ehsan, Capital - $89,100

Credit: Building - $22,500

Credit: Land - $60,000

Explanation:

The journal entry reflects the increase in Ehsan's capital account by the total value of the contributions. The debit to Ehsan, Capital represents the increase in his capital account by the combined value of the building and land, which amounts to $89,100.

On the credit side, the Building account is credited with $22,500 to recognize the addition of the building as a partnership asset. Additionally, the Land account is credited with $60,000 to acknowledge the inclusion of the land in the partnership's assets.

By making this journal entry, the partnership properly records Ehsan's capital contribution, ensuring accurate tracking of the partners' capital accounts and reflecting the increased value of the partnership's assets due to Ehsan's contribution of the building and land.

For more such questions on journal entry

https://brainly.com/question/30467081

#SPJ11

Statement of Partnership Liquidation
After closing the accounts on July 1, prior to liquidating the partnership, the capital account balances of Silver, Carillo, and Tingley are $77,700, $51,800, and $25,900, respectively. Cash, noncash assets, and liabilities total $72,500, $124,200, and $41,300, respectively. Between July 1 and July 29, the noncash assets are sold for $116,400, the liabilities are paid, and the remaining cash is distributed to the partners. The partners share net income and loss in the ratio of 3:2:1.
Prepare a statement of partnership liquidation for the period July 1-29. Enter any subtractions (balance deficiencies, payments, cash distributions, divisions of loss, sale of assets) as negative numbers using a minus sign. If an amount is zero, enter in 0.
Silver, Carillo, and Tingley
Statement of Partnership Liquidation
For the Period July 1-29
Cash + Noncash Assets = Liabilities + Silver (3/6) + Carillo (2/6) + Tingley (1/6)
Balances before realization $fill in the blank 1 $fill in the blank 2 $fill in the blank 3 $fill in the blank 4 $fill in the blank 5 $fill in the blank 6
Sale of assets and division of loss fill in the blank 7 fill in the blank 8 fill in the blank 9 fill in the blank 10 fill in the blank 11 fill in the blank 12
Balances after realization $fill in the blank 13 $fill in the blank 14 $fill in the blank 15 $fill in the blank 16 $fill in the blank 17 $fill in the blank 18
Payment of liabilities fill in the blank 19 fill in the blank 20 fill in the blank 21 fill in the blank 22 fill in the blank 23 fill in the blank 24
Balances after payment of liabilities $fill in the blank 25 $fill in the blank 26 $fill in the blank 27 $fill in the blank 28 $fill in the blank 29 $fill in the blank 30
Cash distributed to partners fill in the blank 31 fill in the blank 32 fill in the blank 33 fill in the blank 34 fill in the blank 35 fill in the blank 36
Final balances $fill in the blank 37 $fill in the blank 38 $fill in the blank 39 $fill in the blank 40 $fill in the blank 41 $fill in the blank 42

Answers

Here's a completed statement of partnership liquidation for the period July 1-29, based on the given information:

Silver, Carillo, and Tingley

Statement of Partnership Liquidation

For the Period July 1-29

Cash + Noncash Assets = Liabilities + Silver (3/6) + Carillo (2/6) + Tingley (1/6)

Balances before realization $72,500 $124,200 $41,300 $77,700 $51,800 $25,900

Sale of assets and division of loss -$116,400 -$0 -$0 -$77,600 -$51,700 -$25,900

Balances after realization -$43,900 $124,200 $41,300 $100 $100 $100

Payment of liabilities -$0 -$41,300 -$0 $100 $100 $100

Balances after payment of liabilities -$43,900 $82,900 $41,300 $0 $0 $0

Cash distributed to partners $43,900 -$24,000 -$12,000 -$7,900 -$12,900 -$11,000

Final balances $0 $58,900 $29,300 $0 $0 $0

Balances before realization: These are the initial capital account balances of Silver, Carillo, and Tingley, as well as the total cash, noncash assets, and liabilities.

Sale of assets and division of loss: The noncash assets are sold for $116,400, and the resulting loss of $77,600 is divided among the partners based on their profit-sharing ratio.

Balances after realization: This shows the remaining balances after the sale of assets and division of the loss.

Payment of liabilities: The liabilities of $41,300 are paid off using the available cash.

Balances after payment of liabilities: This shows the balances after the payment of liabilities.

Cash distributed to partners: The remaining cash is distributed among the partners based on their profit-sharing ratio.

Final balances: This represents the final capital account balances of Silver, Carillo, and Tingley after the liquidation process.

Please note that the values in the statement are calculated based on the given information and assumptions.

Learn more about account balance:
https://brainly.com/question/24914390

#SPJ11

Here's a completed statement of partnership liquidation for the period July 1-29, based on the given information:

Silver, Carillo, and Tingley

Statement of Partnership Liquidation

For the Period July 1-29

Cash + Noncash Assets = Liabilities + Silver (3/6) + Carillo (2/6) + Tingley (1/6)

Balances before realization $72,500 $124,200 $41,300 $77,700 $51,800 $25,900

Sale of assets and division of loss -$116,400 -$0 -$0 -$77,600 -$51,700 -$25,900

Balances after realization -$43,900 $124,200 $41,300 $100 $100 $100

Payment of liabilities -$0 -$41,300 -$0 $100 $100 $100

Balances after payment of liabilities -$43,900 $82,900 $41,300 $0 $0 $0

Cash distributed to partners $43,900 -$24,000 -$12,000 -$7,900 -$12,900 -$11,000

Final balances $0 $58,900 $29,300 $0 $0 $0

Balances before realization: These are the initial capital account balances of Silver, Carillo, and Tingley, as well as the total cash, noncash assets, and liabilities.

Sale of assets and division of loss: The noncash assets are sold for $116,400, and the resulting loss of $77,600 is divided among the partners based on their profit-sharing ratio.

Balances after realization: This shows the remaining balances after the sale of assets and division of the loss.

Payment of liabilities: The liabilities of $41,300 are paid off using the available cash.

Balances after payment of liabilities: This shows the balances after the payment of liabilities.

Cash distributed to partners: The remaining cash is distributed among the partners based on their profit-sharing ratio.

Final balances: This represents the final capital account balances of Silver, Carillo, and Tingley after the liquidation process.

Please note that the values in the statement are calculated based on the given information and assumptions.

Learn more about account balance:

brainly.com/question/24914390

#SPJ4

what are 2 things that could happen to disrupt customer loyalty life cycle???

Answers

Answer: salespeople and customers are essential for the success of business-to-business relationships, and research has shown that a change of the salesperson can severely harm financial performance.

Explanation: However, such interpersonal relationship disruptions may also have positive effects by encouraging vitalizing re explorations of the relationship.

Caitlyn has worked in HR for Clearwater Electronics for more than 20 years. She has found that many employees are now more concerned with working in an environment where they can grow personally than with their level of compensation. How can Caitlyn and the HR department best provide opportunities for their employees to grow?

Answers

Answer:

A) HR can provide training and development activities to help employees improve.

Explanation:

In a work environment where employees prioritize personal growth, it is necessary for the human resources department to implement training and development strategies for employees.

The focus on training and organizational development allows companies to develop diagnoses, discover the potential of employees, correct errors, reorganize the work according to the potential of each employee, etc., which makes the work more satisfying, more productive because it motivates and increase employee satisfaction, in addition to being essential for the development of creativity, innovation and differentiated skills.

The best way that Caitlyn and the HR can best provide opportunities for their employees to grow is through the provision of training and development activities to help employees improve.

This question obviously tells us that the employees are less concerned about the pay they receive compared to the growth that they can attain personally.

A way that would help them to attain the growth in their job is through trainings and other development activities.

These would help them to learn new skills and also get better at their jobs.

Read more on https://brainly.com/question/19089510?referrer=searchResults

2.
Which of the following refers to the amount of money that a retailer makes after
accounting for expenses?

Answers

You did not type a problem so I cannot help.

A share of ownership in a company is known as which of the following?
А.Stock
B.Investment
с.Rebate
D.Bond

Answers

Answer:

Stock

Explanation:

The worth of a company is subdivided into small units known as shares.  Each unit of a share represents the ownership of the company. The owners of the shares are described shareholders, and they are the owners of the company.

The term share is, at times, substituted with stock or equity.  In ownership of a company, stock, shares, and equity will refer to the same things. Shareholders are also then referred to as stockholders.

is sueing someone for 50,000 dollars for no reason an example of integrity because recently a neighbor in my neighborhood was being rude and then continued to say that people who are not like him do not have integrity... (before get further in just know this guy smokes weed and get drunk like every day and also know one of my other neighbors works for selling houses in my neighborhood) he then sues one of my neighbors who sells houses for no reason and for 50,000 dollars. So...is this integrity lol also let me know if I should tell more crazy stories in my life on brainly lol.

Answers

Answer:

oh

Explanation:

.............................

What is the goal of networking? (5 points)

To conduct research that can help you pass certification tests

To discover business ideas you can claim as your own

To learn and expand one's business connections

To socialize and raise money for local charities

Answers

Answer:

The correct answer is option 3, To learn and expand one's business connections.

Explanation:

The primary goals of networking are to gain valuable business connections, learn of potential business or career opportunities, and share knowledge & ideas, among others. When executed correctly, this process is mutually beneficial.

How much student loan debt is normal?

Answers

The normal federal loan balance per borrower is $37,574. The average private student loan debt per borrower is $54,921.

Private education loans are provided by a wide variety of financial entities, including banks, credit unions, and others. Private loans are always accessible, and you are free to spend the money however you see fit, including for tuition, room and board, books, computers, travel, and daily expenses. To apply for federal loans for college, students and their parents must complete the Free Application for Federal Student Aid, or FAFSA. The two primary types of federal student loans are subsidised and unsubsidized. Subsidized loans are less expensive if you qualify and are eligible. Additional borrowing choices include private loans from banks and other lenders as well as federal PLUS loans for parents.

To learn more about student loan refer here:

https://brainly.com/question/24501576

#SPJ4

The Big Hotel Brand has instituted a coaching program. What are the likely results?


The expenses for coaching will be higher than that of other types of training, but it is worth it.

Managers will find coaching too time consuming in the long run.

Productivity will be diminished because employees work less.

The hotel will develop a deep bench of talent.

Answers

Answer:

The expenses for coaching will be higher than that of other types of training, but it is worth it.The hotel will develop a deep bench of talent.

Explanation:

The essence of coaching is to develop and support individuals to maximize their potential. In coaching, an more competent and experienced person, the coach, offers instructions and guidance that helps the learner unlock their abilities.  

Coaching empowers individuals by developing their soft and interpersonal skills. It prepares them for bigger responsibilities in an organization. Coaching is costly in terms of budgets and the time-off that employees and managers require for the activities. However, the benefits of more competent and efficient employees outweigh the costs.  Coaching ensures a company has a readily available pool of talents to take up higher positions or fill any vacancies should they emerge.

QUESTION 6/10
Revenue is:
1-1
A. The amount of money a company pays its employees.
C. The amount of taxes a company has to pay.
B. The amount of money a company makes from sales.
D. The amount of money a company has left over after paying
Bills

Answers

B. the amlunt of money a company makes from sales

Write a letter to your uncle aboard
tell him two things u need for school.​

Answers

Answer: A backpack, And a binder

Explanation:

Other Questions
what are three ways businesses meet customer needs and wants other than with pricing straiges how DOOM hold heat and preach non violence? The rap e of the sabine woman was painted by:A. Artemisia GentileschiB. Nicolas PoussinC. Claude LorrainD. Annibale Carracci Which polynomials are prime? Check all that apply. 2x2 7x 1 5x2 10x 5 3x2 8 4x2 25 x2 36. A string is being pulled with a force of 20 N and moves a 5 kg block to the left at a constant speed. What is the coefficient of friction for between the floor and the block? Enter your answer as a decimal value (Example: 0.72) * I think the answer is 20 but this question is starting frustrating me Based on what you know about the tensions and actions that led up to the war, which country or countries do you blame most for causing world war i and why? for the solidification of pure gold, calculate the critical radius (r*) and the activation freeenergy (*). assume homogeneous nucleation conditions. the values of the latent heat of fusion and the surface free energy are -1.16x109 j/m3 and 0.132 j/m2, respectively. the degree of supercooling is 30 k and the melting point of gold is 1064 oc. The Sun and the planets are part of the solar system. ________________ are found outside of our solar system Fear that emerges from a source that is difficult to identify or from a source that does not pose asmuch a threat as originally thought is hugh is an american citizen currently living in denmark. he works for a company that has its headquarters in france. he is a . (3x-2)^2 (2x-1) simplify Math Question,please help Evaluate 1/5r + 9/20 when r = 1/4 1/5 ( blank) + 9/20 = blank + 9/20= Answer? What are the roots of the quadratic equation 4x 2 7x 2 0? The cost price of a scooter is R15000 Uviwe paid 15% of the amount in cash and signed a hire purchase agreement to pay the balance 24equal monthly installments The interest rate is. 10%per annum How much did he pay in cash?What was the total amount he paid for the scooter? who wants to help me?? when tuning his guitar, a music student notices that the string is not vibrating at the desired frequency of 195 hz, so he tightens the string by 16.4% to get this frequency. at what frequency was the string vibrating when he first started the tuning process? What are some of the methods that were used to resist slavery in the decades before the Civil war? Urban infrastructures that support a community are sometimes in the news; we seldom think about them except when there is a disruption of service. A small city has just replaced a water storage tank and associated feeders from it throughout the community. It is estimated that the annual service requirements will be $40,000 the first year, with $10,000 increases in each subsequent year for 8 years. The community's time value of money is 4%. Determine the present worth of these maintenance expenses using each of two different methods. This will serve as a check on your work. Click here to access the TVM Factor Table Calculator. $ Carry all interim calculations to 5 decimal places and then round your final answers to a whole number. The tolerance is 50. eTextbook and Media Hint Determine the future worth of these maintenance expenses at the end of year 8 . Click here to access the TVM Factor Table Calculator. a client wishes to increase intake of healthy fat sources while decreasing intake of saturated fat. which oil will the client use when preparing a homemade salad dressing?