The critical path is the sequence of activities that determine the latest date by which the project can be evaluated.
a. true
b. false

Answers

Answer 1

The statement given about the critical path is true.

To find the answer, we have to know more about the critical path.

What is critical path?The longest series of tasks in a project plan that must be finished on time for it to be finished by the deadline is known as the critical path. The critical route is the set of actions that, when carried out in a timely manner while taking into account all the aforementioned factors, will take the longest to accomplish the project. Because it is the "red alert" of paths, the critical path is referred to as "critical". Your project won't be successfully completed before the deadline if it doesn't follow the critical path's timing and order.

Thus, we can conclude that, the statement given about the critical path is true.

Learn more about the critical path here:

https://brainly.com/question/15091786

#SPJ4


Related Questions

What does addition of two vectors give you?

Answers

Answer:

Explanation:

To add or subtract two vectors, add or subtract the corresponding components. Let →u=⟨u1,u2⟩ and →v=⟨v1,v2⟩ be two vectors. The sum of two or more vectors is called the resultant. The resultant of two vectors can be found using either the parallelogram method or the triangle method .

Lila swam 50 meters north in 10 seconds. Find Lila's velocity

Answers

Explanation:

50 meters north in 10 seconds.

speed = distance ÷ time = 50 meters ÷ 10 seconds = 5m/s

A 4kg box accelerated from rest by a force across the floor at a rate of 2m/s^2 for 7 seconds. What is the net work done on the box?

Answers

Answer and work is shown in the image attached.

please mark me brainliest :)

A 4kg box accelerated from rest by a force across the floor at a rate of 2m/s^2 for 7 seconds. What is

The solution in the first answer is excellent.

Here's another way to do it:

Force = (mass) x (acceleration)

Force = (4 kg) x (2 m/s²)

Force = 8 Newtons

Distance = (1/2) (a) (T²)

D = (1/2) (2 m/s² ) (7 sec)²

D = 49 meters

Work = (force) x (distance)

Work = (8 N) x (49 m)

Work = 392 Joules   yay!

Ethyl alcohol for light of wavelength 589 nm, calculate the critical angles for the following substances when surrounded by water.

Answers

The critical angle for ethyl alcohol, when surrounded by water, is approximately 52.6 degrees.

Calculate the critical angles for different substances when surrounded by water, we need to use Snell's Law, which relates the angles of incidence and refraction for light passing from one medium to another.

The critical angle occurs when the angle of refraction is 90 degrees, resulting in the light being refracted along the interface instead of passing through it.

The formula for Snell's Law is:

n1 * sin(theta1) = n2 * sin(theta2)

where:

n1 is the refractive index of the initial medium (water, in this case),

n2 is the refractive index of the substance being considered,

theta1 is the angle of incidence,

theta2 is the angle of refraction.

To find the critical angle, we set theta2 to 90 degrees:

n1 * sin(theta1) = n2 * sin(90)

Since sin(90) = 1, the equation simplifies to:

n1 * sin(theta1) = n2

Now, we need to determine the refractive indices (n2) for the given substances. The refractive index of a substance is the ratio of the speed of light in vacuum to the speed of light in that substance.

For ethyl alcohol, the refractive index with respect to water is approximately 1.36.

Now we can calculate the critical angles for ethyl alcohol when surrounded by water.

Let's assume the incident medium is water, with a refractive index (n1) of approximately 1.33 (at 589 nm).

Using the formula n1 * sin(theta1) = n2, we can calculate the critical angle (theta1) for ethyl alcohol:

1.33 * sin(theta1) = 1.36

sin(theta1) = 1.36 / 1.33

theta1 = arcsin (1.36 / 1.33)

We find that the critical angle for ethyl alcohol surrounded by water is approximately 52.6 degrees.

Therefore, the critical angle for ethyl alcohol, when surrounded by water, is approximately 52.6 degrees.

learn more about ethyl alcohol in the link:

https://brainly.com/question/32229469

#SPJ11

Complete Question:

For light of wavelength 589 nm, calculate the critical angles for the following substances when surrounded byair.

ethyl alcohol= °

fused quartz= °

carbon disulfide= °

For light of wavelength 589 nm, calculate the critical angles for the following substances when surrounded by air. ethyl alcohol fused quartz carbon disulfide

The element lanthanum has an isotope with an atomic mass of 138. 9 amu and an abundance of 99. 91%. A second isotope has an atomic mass of 137. 9 amu and an abundance of 0. 9%. What is the average atomic mass of lanthanum?.

Answers

The average atomic mass of lanthanum that has an isotope with an atomic mass of 138.9 amu and an abundance of 99.9 1% and a second isotope with an atomic mass of 137.9 amu and an abundance of 0.09 % is

Average atomic m = Sum of product of atomic m and % abundance /  100

For isotope 1,

Atomic mass = 138.9 amu

% abundance = 99.91 %

For isotope 2,

Atomic mass = 137.9 amu

% abundance = 0.09 %

Average atomic mass = ( 138.9 * 99.91 ) + ( 137.9 * 0.09 ) / 100

Average atomic mass = 13877.5 + 12.41 / 100

Average atomic mass = 138.9 amu

The average atomic mass or average atomic weight of an element is the weighted average mass or weight of atoms in a naturally occurring sample ( i.e., isotopes ) of the element.

Therefore, the average atomic mass of lanthanum is 138.9 amu

To know more about average atomic mass

https://brainly.com/question/13753702

#SPJ1

Which of the following statements about developing a personal fitness program is NOT true?
A When developing a personal fitness program, it is important to implement strategies that will help
maintain the program as well as give it a successful start
B. Personal factors such as age, health concerns, and likes are important to consider when developing
a personal fitness program
C. The starting skill level of the physical activities included in a personal fitness program should be
determined from other individuals' fitness programs
D. The FITT principle should be used when developing a personal fitness program,
Please select the best answer from the choices provided
A
B
Save and Exit
Next

Answers

Answer:

C

Explanation:

The starting skill level of the physical activities included in a personal fitness program should be determined from other individuals' fitness programs is a statement which is not true. Everyone starts their personal fitness journey at a different level which should be regarded . A fitness test should be taken to determine where an individual should start their new lifestyle.

Answer:

C. I got it right :)

Explanation:

what are some features that you would expect to see in the design of a high-quality experiment?

Answers

Scientific experiments follow principles called the scientific method that ensure that accurate tests are performed, reliable results are collected, and reasonable conclusions are drawn. Scientific experiments must follow the basic principles of good research so that the final presented results can be believed to be reliable.

Observations of new physical processes or phenomena occur infrequently, but there are areas of science that are not fully understood. Scientists must verbalize their observations in order to formulate meaningful hypotheses.

It's not enough to just guess why something happens. Scientists must prove their theories to be correct. Predictions are made to test observations under different circumstances. The aim is to learn more about this phenomenon and prove its existence. One of his ways of improving the scientific method is by creating 'models'. Models can be used to infer difficult and unobservable concepts.

Learn more about Experiments here https://brainly.com/question/17274244

#SPJ9

12. what is the wavelength of em radiation that ejects 2.00-ev electrons from calcium metal, given that the binding energy is 2.71 ev? what type of em radiation is this?

Answers

From the calculation, the wavelength of the waves is about 264 nm and belongs to the ultraviolet spectrum.

What is photoelectric effect?

The term photoelectric effect can be used to describe the loss of electron from the surface of a metal. Given that; KE = E - W, where;

KE = kinetic energy of the emitted photoelectron

E = energy of the photon

W = work function of the metal

\(2= E - 2.71\\E = 2 + 2.71\\E = 4.71ev or 7.5 * 10^-19 J\)

λ= hc/E

λ= \(6.6 * 10^-34 * 3 * 10^8/7.5 * 10^-19\)

λ= \(2.64 * 10^-7 m\) or 264 nm

Learn more about wavelength:https://brainly.com/question/13533093

#SPJ4

Deena made a chart to summarize features of a velocity vs. time graph for objects with constant acceleration and objects with constant velocity.

Answers

The statement which best describes Deena's error is: B. Include the area of the rectangle under the line to find displacement for constant acceleration.

What is a velocity vs. time graph?

A velocity vs. time graph can be defined as a type of graph that is used to graphically represent the rate of change of velocity of an object with respect to time.

Based on the information provided in the table shown (see attachment), the statement which best describes Deena's error is her not including of the area of the rectangle under the line, so as to enable her find displacement for constant acceleration.

Read more on acceleration here: brainly.com/question/24728358

#SPJ1

Complete Question:

Deena made a chart to summarize features of a velocity vs. time graph for objects with constant acceleration and objects with constant velocity.

Which best describes Deena's error?

A. The line for constant velocity is not horizontal; it is diagonal and slopes downward.

B. Include the area of the rectangle under the line to find displacement for constant acceleration.

C. Find acceleration by finding the area of the rectangle above the line.

D. Find velocity by calculating the slope of the line.

Deena made a chart to summarize features of a velocity vs. time graph for objects with constant acceleration

1.1 A change where the mass number of atoms and number of molecules remains the
same with only the change in the arrangement of particles is.............
A Molecular change
B Chemical change
C Physical change
D Atomic change

Answers

Answer:

physical change

Explanation:

I searched it up

Which is always true for momentum ?

Answers

Answer:

• Momentum always depends on the mass and speed/velocity of the body in motion.

Explanation:

\({ \tt{momentum = mass \times velocity}} \\ \)

Can the sun explain global warming? ( 2 points) Suppose that the Earth has warmed up by 1 K in the last hundred years. i) How much would the solar constant have to increase to explain this? ii) Compare this to the observed fluctuation of the solar constant over the past 400 years (shown in class) For part (i), begin with the standard 'blackbody' calculation from class, that is: set α=0.30, and assume that the Earth acts as a blackbody in the infrared.

Answers

No, the sun cannot explain global warming. Global warming is a phenomenon in which the temperature of the Earth's surface and atmosphere is rising continuously due to human activities such as deforestation, burning of fossil fuels, and industrialization.

This increase in temperature cannot be explained only by an increase in solar radiation.There are several factors which contribute to global warming, including greenhouse gases such as carbon dioxide, methane, and water vapor. These gases trap heat in the Earth's atmosphere, which causes the planet's temperature to rise. The sun's radiation does contribute to global warming, but it is not the main cause.

i) To calculate the increase in solar radiation that would cause the Earth to warm up by 1 K, we can use the following formula:ΔS = ΔT / αWhere ΔS is the increase in solar constant, ΔT is the increase in temperature, and α is the Earth's albedo (reflectivity).α = 0.30 is the standard value used for the Earth's albedo.ΔS = ΔT / αΔS = 1 K / 0.30ΔS = 3.33 W/m2So, to explain the increase in temperature of 1 K over the last hundred years, the solar constant would need to increase by 3.33 W/m2.

ii) The observed fluctuation of the solar constant over the past 400 years has been around 0.1% to 0.2%. This is much smaller than the 3.33 W/m2 required to explain the increase in temperature of 1 K over the last hundred years. Therefore, it is unlikely that the sun is the main cause of global warming.

The sun cannot explain global warming. While the sun's radiation does contribute to global warming, it is not the main cause. The main cause of global warming is human activities, particularly the burning of fossil fuels, which release large amounts of greenhouse gases into the atmosphere.

To know more about global warming :

brainly.com/question/29625243

#SPJ11

How do I find the answer I’m pretty confused I was out with Covid for 2 weeks for I never got shown this in class this is the homework my teacher gave me

How do I find the answer Im pretty confused I was out with Covid for 2 weeks for I never got shown this

Answers

We will determine the final speed as follows:

\(v_{\text{f}}=\frac{850m}{4.22s}\Rightarrow v_f=201.4218009m/s\)\(\Rightarrow v_f\approx201m/s\)

So, superman's final velocity is approximately 201 m/s.

[In this case superman's initial velocity is a datapoint that is not necessary]

A stone is thrown straight upward and reaches a maximum height of 32.3 m above itslaunch point. What was the initial speed with which the stone was thrown upwards?Answer:m/s

Answers

Answer:

The initial speed = 25.16 m/s

Explanation:

The maximum height, H = 32.3 m

The initial speed, u = ?

The formula for the maximum height of a projectile is:

\(H=\frac{u^2}{2g}\)

Substitute H = 32.3m and g = 9.8 m/s² into the formula and solve for u

\(\begin{gathered} 32.3=\frac{u^2}{2(9.8)} \\ \\ u^2=32.3(2)(9.8) \\ \\ u^2=633.08 \\ \\ u=\sqrt{633.08} \\ \\ u=25.16\text{ m/s} \end{gathered}\)

The initial speed = 25.16 m/s

All celestial objects we tracted to each other by gravity.Asteroids A and B are 5 meters (m) part. Asteroids C and D are also 5 m apart. Asteroids A and B both have a mass of 5 kilograms(kg) and asteroids C and D both have a mass of 7 kg.Between which set of asteroids is the gravitational attraction?

A between asteroids c and d because gravitational attraction is greatest with increased mass

B between asteroids a and b because gravitational attraction is greatest with decreased mass

C between asteroids a and b because gravitational attraction is greatest with increased distance

D between asteroids c and d because gravitational attraction is greatest with increased distance

Answers

A. Between asteroids C and D because gravitational attraction is greatest with increased mass.

If the force exerted by the intern is doubled and the distance is haived, does the work done by the intern increase, decrease, or remain the same.I want the answer asap

Answers

Answer:

The work remains the same

Please mark as brainliest

1. When building a house using bricks a damp course is laid just above the brick foundation. Explain why the damp course is necessary​

Answers

Answer:

Damp Proofing:

Explanation:

The presence of damp proofing is very necessary to maintain the health of a structure. DPC plays an important role in all types of buildings and it should be necessary to know about the importance, requirements, and properties of DPC. In many of the buildings all over the world, the rising damp may be due to a damaged damp-proof course, or sometimes, there may be not any damp proof course in a building.

what is the force needed to accelerate a grocery sack weighing 212 N upward at 1.7 m/s2

Answers

Answer:

36.04N

Explanation:

accelerating force: mass × acceleration

F=ma

m=212/10= 21.2kg

a=1.7m/s2

F=21.2×1.7

=36.04N

Calculate the wavelength of a photon of electromagnetic radiation with a frequency of 151.7 mhz

Answers

The wavelength of a photon of electromagnetic radiation with a frequency of 151.7 Mhz is 1.978 meter

According to the question

The frequency of a photon of electromagnetic radiation = 151.7 Mhz

By using the Formula of wavelength and frequency

λ = C/f

Where,

λ (Lambda) = Wavelength in meters

C = Speed of Light (c = 3x10⁸ m/s)

f = Frequency

Now, the wavelength of a photon of electromagnetic radiation with a frequency of 151.7 Mhz is  

1 Mhz = 1000000 Hz

151.7 Mhz = 151.7 * 10⁶ Hz

λ = C/f  

Substituting the value of C and f  

  λ =  \(\frac{3*10^{8} }{151.7 * 10^{6} }\)

  λ = 1.978 meter

Hence,  the wavelength of a photon of electromagnetic radiation with a frequency of 151.7 Mhz is 1.978 meter

To know more about  wavelength and frequency here:

https://brainly.com/question/18651058

#SPJ4

A 0.10kg mass is oscillating at a small angle from a light string with a period of 0.63s. What is the length of the pendulum?

Answers

Answer: 00.99m

Explanation:

because

Answer: 0.099

Explanation: Khan

how, if at all, does the ground state energy change if these electrons are subject to a uniform magnetic eld of strength b?

Answers

The ground state energy does not change when the electrons are subject to a uniform magnetic field of strength b. This is because the ground state energy is determined only by the number of electrons and the Coulomb repulsion between them, which is not affected by the magnetic field.

What is magnetic field?
The magnetic influence on moving electric charges, pulsed electrical, and magnetic materials is described by a magnetic field, which is a vector field. A force perpendicular to the charge's own velocity and the magnetic field acts on it when the charge is moving through a magnetic field. The magnetic field of a permanent magnet pulls on ferromagnetic substances like iron and attracts as well as repels other magnets. Paramagnetism, diamagnetism, as well as antiferromagnetism are three additional magnetic effects that a nonuniform magnetic field can have on "nonmagnetic" materials, though these forces are typically so minute that they can only be discovered by laboratory equipment. Electric currents, such as those found in electromagnets, as well as electric fields that change in time produce magnetic fields that surround magnetised materials.

To learn more about magnetic field
https://brainly.com/question/14411049
#SPJ4

How many kWhkWh of energy does a 500 WW toaster use in the morning if it is in operation for a total of 6.4 minmin

Answers

A toaster that operates for a total of 6.4 minutes with a power rating of 500 W will consume 0.053 kWh of energy in the morning.

What is a kilowatt-hour (kWh)?

Kilowatt-hour is a unit of energy equal to the amount of energy expended by one kilowatt of power in one hour of time. A watt-hour (Wh) is a measure of electrical energy, or the amount of energy used by an appliance rated at one watt for one hour.A kilowatt-hour is equal to 1000 watt-hours. One kilowatt-hour is equivalent to 3.6 million joules (MJ) of energy. It's also worth noting that an electrical device's energy usage is calculated using the product of its power rating and the time it's been in operation.

Power rating of the toaster = 500 W

Operating time of the toaster = 6.4 min

In order to obtain the energy utilized, first, we must convert the operating time to hours because energy is measured in kWh.

To convert minutes to hours, we divide by 60.

6.4 minutes ÷ 60 minutes per hour = 0.107 hours

Energy consumed by a toaster with a power rating of 500 W and an operating time of 6.4 minutes can be calculated as follows:

Energy = Power × Time in hours

Plugging in the given values,

Energy = 500 W × 0.107 hours

Energy = 53.5 Wh (watt-hours)

Now, convert watt-hours to kilowatt-hours:

1 kilowatt-hour = 1000 watt-hours

Therefore,

Energy in kWh = 53.5 Wh ÷ 1000

Energy in kWh = 0.0535 kWh

Thus, the toaster uses 0.053 kWh of energy if it is in operation for a total of 6.4 minutes.

Learn more about energy:

https://brainly.com/question/2003548

#SPJ11

The theory of liquidity preference is most helpful in understanding
a. the wealth effect.
b. the exchange-rate effect.
c. the interest-rate effect.
d. misperceptions theory.

Answers

The theory of liquidity preference is most helpful in understanding (c) the interest-rate effect.

The liquidity preference theory, introduced by John Maynard Keynes, explains how individuals' preferences for holding liquid assets, such as money, affect the demand and supply of money in an economy. According to this theory, the demand for money is determined by individuals' desire to hold liquid assets for transaction purposes and as a precautionary measure.

The interest-rate effect is one of the channels through which the theory of liquidity preference operates. It suggests that the demand for money is inversely related to the prevailing interest rate. When interest rates are high, individuals tend to hold less money and prefer to invest in interest-bearing assets, such as bonds or savings accounts. Conversely, when interest rates are low, individuals are more willing to hold money as it becomes less costly to do so compared to other interest-bearing investments.

Therefore, the theory of liquidity preference helps in understanding how changes in interest rates influence the demand for money and, consequently, affect economic variables such as investment, consumption, and aggregate demand.

Learn more about liquidity at: https://brainly.com/question/921670

#SPJ11

Placing a soccer ball on the top shelf increases the...
Kinetic energy
Chemical energy
Gravitational potential energy
Elastic potential energy​

Answers

Answer:

Gravitational potential energy

Explanation:

PE = m*g*h

m = mass

g = 9.81m/s², acceleration of gravity

h = height

So m and g stay the same but the height can change so the higher you go the higher the Gravitational potential energy.

Placing a soccer ball on the top shelf increases the Gravitational potential energy

what is Gravitational potential energy ?

In a gravitational field the energy possessed by an object due to a change in its position called as gravitational potential energy, it is an energy that is related to gravitational force or to gravity.

When a mass of the body  (m) is moved from infinity to a point inside the gravitational influence of a source mass (M) in absence of acceleration and the amount of work done in displacing it into the source field is stored in the form of potential energy denoted with the symbol Ug.

when external force is applied, then the  position of the body changes potential energy is equal to the amount of work done on the body by the forces.

The gravitational influence on a body at infinity is zero, then the  potential energy is zero, PE = m*g*h where m = mass, g = 9.81m/s², acceleration of gravity, h = height

For more details regarding Gravitational potential energy, visit

https://brainly.com/question/19768887

#SPJ2

Which new idea did copernicus introduce that significantly modified the geocentric model of the universe?.

Answers

Copernican heliocentrism was a novel concept that fundamentally altered the geocentric view of the universe.

What fresh concept did Copernicus bring that fundamentally altered the geocentric model?

The father of modern astronomy is Nicolaus Copernicus, a Polish astronomer and mathematician. The heliocentric hypothesis of the solar system, which he initially put forth, states that Earth and other planets rotate around the sun.

Nicolaus Copernicus created the Copernican heliocentrism astronomical theory, which was first presented in print in 1543. This theory put the Sun in the center of the cosmos, stationary, and had Earth and the other planets orbit it at uniform speeds in circular orbits modified by epicycles.

To know more about Copernican heliocentrism visit:-

https://brainly.com/question/4120451

#SPJ4

For a simple harmonic motion (SHM) the displacement x of the particle from the origin is given as a function of time by x(t) = xm cos (wt + ), where the xm is the maximum displacement in units of meter, w is the angular frequency in units of rad/s, and f is the phase constant. If the SHM is described as x(t) = 0.5 cos (20 t +), the magnitude of the maximum acceleration is

Answers

The magnitude of the maximum acceleration for the given simple harmonic motion is 200 m/s². In simple harmonic motion, the acceleration is given by the second derivative of the displacement function.

In simple harmonic motion, the acceleration is given by the second derivative of the displacement function with respect to time. Taking the derivative of x(t) = 0.5 cos(20t + φ) twice, we get the acceleration function a(t) = -20² * 0.5 cos(20t + φ), where -20² represents the angular frequency squared. The maximum acceleration occurs at the extreme points of the cosine function, which have a magnitude of 20² * 0.5 = 200 m/s². The magnitude of the maximum acceleration for the given simple harmonic motion is 200 m/s². In simple harmonic motion, the acceleration is given by the second derivative of the displacement function.

learn more about magnitude here:

https://brainly.com/question/31022175

#SPJ11

Select the correct answer.
George works in a factory and is a member of the labor union. He thinks his wages are low for the work that he does, so he tells the union
representative that his employer should increase his wages. The representative asks the other workers if they feel the same, and they all agree. The
following week, the union representative met with the factory owner regarding an increase in wages, and the employer agreed to it. What strategy did
the union use to get the owner to agree to increase wages?
O A.
OB.
OC.
O D.
O E.
individual bargaining
threaten to go on a strike
collective bargaining
threaten to quit their jobs
filing a petition to the government

Answers

The correct answer is:

C. Collective bargaining

In this scenario, the union used collective bargaining as a strategy to negotiate for higher wages. Collective bargaining involves the union representative engaging in discussions and negotiations with the employer on behalf of the workers to reach an agreement regarding employment terms, including wages. By gathering the consensus of the workers and meeting with the factory owner, the union representative facilitated the collective bargaining process, resulting in an agreement to increase wages.

if a man pushes a lawn mower with a force of 20 lb a distance of 60 feet down a yard how many ftlbs of work did he do

Answers

The work is given by:

\(W=Fd\)

Plugging the values given we have:

\(W=(20)(60)=120\)

Therefore the man do 120 ft*lb of work

What example best describes absolute dating?
1. when the automobile was first built
2. when the dinosaurs lived
3. when the universe began
4. when humans first walked the earth

Answers

when the dinosaurs lived

examples of different type of bullying​

Answers

Answer:

cyber physical verbal

Explanation:

these are types of bullying

Answer:

Physical, Social, Verbal, and Cyber are different kinds of bullying.

Explanation:

Physical Bullying- Physical bullying is the use of physical actions to intimidate and gain control over a target. The physical actions are unwanted by the victim and can either cause damage to their body or possessions. This behavior is all too common in schools.

Social Bullying- Social bullying is deliberate, repetitive, and aggressive social behavior intended to hurt others. This type of behavior generally includes gossip or other actions that cause mental and emotional harm and social isolation for the victim.

Verbal Bullying- Verbal bullying is intended to degrade, demean, or insult the target person, which might affect their mental, physical, emotional, and psychological health. A bully might make comments about the appearance, gender, race, and weight of the bullied.

Cyber Bullying- Cyberbullying is bullying with the use of digital technologies. It can take place on social media, messaging platforms, gaming platforms, and mobile phones. It is repeated behavior, aimed at scaring, angering, or shaming those who are targeted.

Other Questions
a)Some people . travelling by sea as it makes them sea-sick. (dislike)b) Ten miles . a long way to walk. (be)c) The owner is very rich and .. in a large house. (live) Assume everyone has been vaccinated against COVID-19. If the owner of the Dallas Cowboys acquires all the parking space within a mile of Cowboys Stadium, to maximize his profits he should:raise prices for game tickets, but lower prices for game parking.raise prices for both game tickets & parking.lower prices for both game tickets & parking.lower prices for game tickets, but raise prices for game parking. From the French Instrument Corporation second-quarter report ended 2018, do a vertical analysis for the second quarter of 2018. (Input all answers as positive values except other (income) which should be indicated by a minus sign. Round your answers to the nearest hundredth percent.) Percent of net 2,609 FRENCH INSTRUMENT CORPORATION AND SUBSIDIARIES Consolidated Statements of Operation (Unaudited) (In thousands of dollars, except share data) Second Quarter 2018 2017 Net sales $ 6,698 $ 6,951 Cost of sales 4,089 4,462 Gross margin 2,489 Expenses: Selling, general and administrative 1,7831 Product development 175 165 Interest expense 98 123 Other (income), net (172) (99) Total expenses 1,946 1,972 Income before income taxes 663 517 Provision for income taxes 265 209 Net income 398 $ 308 Net income per common share* $ 0.05 $ 0.03 Weighted average number of common shares and equivalents 6,673,673 6,624,184 1,845 Following the election of 1860, many in the South believedthat secession could still be avoided.that Lincoln would strongly protect states rights.that border states would not join a confederacy.that the institution of slavery was in jeopardy. Will give brainly! The organization of the Catholic Church helped it toA) send missionaries to foreign places.B) run local governments.C) reach large numbers of people.D) absorb the Eastern Orthodox faith. on a primem date botht he month and the day are prime numbers. for example feb 2 or 2/3 is a prime date. how many prime dates occurred in 2007? write a paragraph giving your opinion as to what medium to you is the best source of news and why. (Ex.-television, Internet, radio, newspaper, or books)please pick one and write 6-8 sentences, will mark brainliestPLS HELP ASAP One measure of an angle in a triangle is 96. The other two angle measures are represented by 2x and x + 12. Determine the other two degree measures for the missing angles Eddy had 95 updates on his online profile last time he logged in. Every time he logs on he gets 43 more updates. How many times has he logged in if he has had 396 updates when would a 3rd phosphate be removed from ATP? Angles a and b are supplementary. determine the measure of angle a if the measure of angle b is 115.2. 244.8 64.8 25.2 11.5 The word "empire" is essential tounderstanding ancient Rome.Which phrase from the article BEST explainswhat "empire" means?Aa very fixed societyBemperor and other nobles at the topvery poor to very richDcontaining many towns and cities Express 0.2826 as a mixed number the long-run outcome in a monopolistically competitive industry results in * 1 point a trade-off between higher average total cost and more product diversity. inefficiency due to product diversity. efficiency because price exceeds marginal cost. inefficiency because firms earn positive economic profits. efficiency due to excess capacity. Mammals all have hair, but that hair can be very different from one mammal to another or even on the same mammal. If you do not have access to the materials, you can search for videos of each type of hair under a microscope. Cite the link to the video in your response. Steps1) Collect different types of mammal hair that you can find (human, dog, cat, goat, etc. ). 2) Prepare slides of all the different types of hair. 3) Examine slides under a microscope. 4) Draw diagrams and write brief descriptions of each type of hair. Once you have finished, upload to your teacher for grading. Help Me. ) Make a claim Why was Ancient Rome such an successful Empire Solve for x + 5 = 30 What is the proper hand placement whiledriving? What are two important reasons your handsshould stay in the correct hand placement?Answer this question with at least one complete sentenceabout proper hand placement and at least two complete sen-tences stating important reasons hand placement is important. this is from khan academy help... a blu-ray drive has a maximum speed of 10,000 revolutions per minute. if a blu-ray disc has a diameter of 12 cm, what is the linear speed, in km/h, of a point 4 cm from the center if the disc is spinning at a rate of 8000 revolutions per minute?