Answer:
8
Step-by-step explanation:
Given that :
Number of activities = 4
Standard deviation of each activity = 4
Standard deviation of the critical path =?
To obtain the standard deviation of the critical path :
Take the square of each standard deviation:
Activity 1 = 4² = 16; activity 2 = 4² = 16 ; activity 3 = 4² = 16 ; activity 4 = 4² = 16
Sum of the squares :
16 + 16 + 16 + 16 = 64
Square root of the sum:
√64 = 8
(1, 72), (3,66), (5, 53), (7, 40), (9, 34)
WILL MARK BRAINLIEST Cole determined the equation of a linear regression line, and determined that these are the corresponding predicted v
(1, 74), (3,63), (5, 52), (7, 41), (9, 30)
Use the point tool to graph the residual plot for the given values in the data set.
Answer:
y = \(-\frac{11}{2}\) x + \(\frac{159}{2}\)
Step-by-step explanation:
(1, 74)
(3, 63)
m = (63 - 74) / (3 - 1) = \(-\frac{11}{2}\)
y - 74 = \(-\frac{11}{2}\) (x - 1)
y = \(-\frac{11}{2}\) x + \(\frac{159}{2}\)
A taste test asks people from Texas and California which pasta they prefer, brand A or brand B. This table shows the results,
Answer:
D. 0.53
Step-by-step explanation:
California = 90
Total of those who prefer Brand A = 170
To find the percentage, you do:
90/170 × 100 = 52.941...
However you have to round it to two decimal points, hence you do:
52.941 ≈ 53%
53% = 0.53
This is due to 53% representing 53/100 = 0.53
Therefore, the probability that the person that likes brand A is from California is 0.53
:)
Pythagorean TheoremFor the following right triangle, find the side length x. Round your answer to the nearest hundredth.18Х11
Solution
For this case we can use the Pythagoras theorem and we have:
\(18^2=11^2+x^2\)And solving for x we got:
\(x=\sqrt[]{18^2-11^2}=\sqrt[]{324-121}=\sqrt[]{203}=14.25\)Then the answer is:
14.25
Translate into a proportion: What number is 63% of 107? Let n= the number.
Answer:
look at the picture.......................
What is the slope of the line whose equation is 2y=3x+4
Answer:
3/2
Step-by-step explanation:
use the slope-intercept formula y=mx+b to find the slope
hope this helped♥
Answer:
3/2
Step-by-step explanation:
If you divide both sides by 2 to convert to y=mx+b, you get y=3/2x+2. M is the slope, which means that the slope is 3/2.
the length of a rectangle is twice its width. if the perimeter of the rectangle is 54m find its area
Answer:
You can denote the width of the rectangle as x,
than the length of the rectangle will be 2x
and the perimeter of the rectangle will be two length plus two width and it should be equal to 54 in
and the equation will look 2(2x)+2x=54
solving the equation 6x=54, x=9in
So the width of the rectangle is 9in and the length is 9*2=18in
and the area of the rectangle is 9*18=162 sq in.
you spin each spinner and find the sum how many different sums are possible
Answer:
let's use a sample set.
8+8, 8+4, 8+5, 8+6, 8+7
4+8, 4+4, 4+5, 4+6, 4+7
5+8, 5+4, 5+5, 5+6, 5+7
6+8, 6+4, 6+5, 6+6, 6+7
7+8, 7+4, 7+5, 7+6, 7+7
There is 25 sums.
(50 POINTS AND BRAINLYEST)
Please answer them all :)
A dilation that makes a shape larger is a(n)....
Question 4 options:
expansion
contraction
reflection
rotation
Question 5 (1 point)
Saved
A dilation that makes a shape smaller is a(n)....
Question 5 options:
expansion
contraction
reflection
rotation
Question 6 (1 point)
The resulting shape after a transformation is completed is called the...
Question 6 options:
final shape
pre-image
image
result
Question 7 (1 point)
The number that is used to determine if a dilated shape has been expanded or contracted is the...
Question 7 options:
scale factor
center of dilation
origin
really important number
Joseph Selects a card from a standard deck of 52 cards and then replaces it afterwards he decides to record the total number of red cards that he selects and calculates the proportion of red cards that he has selected so far after each pick he then constructs a graph to visualize his results
The answer to the given question is Option B.
Probability means possibility. A branch of mathematics that deals with the occurrence of random events. Probability is a measure of the likelihood of an event occurring. Many events cannot be predicted with absolute certainty.We can only predict the probability that an event will occur. H. Possibility of using it. Probabilities can range from 0 to 1. 0 means the event is not possible, 1 indicates the specific event. For example, if you toss a coin, you get either heads or tails. There are only two possible outcomes (H, T). But if you toss two coins in the air, three events can occur, such as ), (T, T). Probability of an event occurring P(E) = number of favorable outcomes/total number of outcomes.At no point can we distinguish between diamonds and hearts, as we are only interested in finding red cards. as a result,
The wrong statement is:
For a given number of selections, we can use Joseph's graph to find the number of diamonds that he has picked so far.
Therefore, the ultimate answer to the given question is Option B.
Learn more about probability here
https://brainly.com/question/24756209
#SPJ9
The question is incorrect, The correct question is
Joseph selects a card from a standard deck of 52 cards and then replaces it afterwards. He decides to record the total number of red cards that he selects and calculates the proportion of red cards that he has selected so far after each pick. He then constructs a graph to visualize his results. Which of the following statements is FALSE?
A. The theoretical probability for selecting a red card in each pick is 0.5.
B. For a given number of selections, we can use Joseph's graph to find the number of diamonds that he has picked so far.
C. This is an example of the law of large numbers.
D. The relative frequency of selecting a red card changes with the increase in number of selections.
HELP ME PLEASE!!!!!!
ZEARN!!!!
The expression 1 2/5 + 2 2/3 using fifteenths is 3 + 6/15 + 10/15
How to rewrite the expression using fifteenthsFrom the question, we have the following parameters that can be used in our computation:
1 2/5 + 2 2/3
3 + 2/5 + 2/3
To rewrite the expression using fifteenths, we multiply the numerator and the denominator of the fractions by the same number
In this case, we use 3 and 5
So, we have
3 + 2/5 * 3/3 + 2/3 * 5/5
Evaluate the products
3 + 6/15 + 10/15
Hence, the expression using fifteenths is 3 + 6/15 + 10/15
Read more about fraction at
https://brainly.com/question/31896427
#SPJ1
is 25 60 65 a right triangle
Answer:
No
Step-by-step explanation:
may i be marked as brainliest?
Answer:
Yes
Step-by-step explanation:
A triangle is right if its sides follow the Pythagorean triples.
We can simplify 25, 60, 65 by dividing by 5 for each number.
By doing this we get:
5, 12, 13
If you memorized the Pythagorean triples, you can immediately know that 5, 12, 13 is one of them. Therefore, 25, 60, 65 is a right triangle.
Find the equation of the parabola with the following properties. Express your answer in standard form.
Symmetric with respect to the line y = 2
Directrix is the line x = 11
P = -3
The equation of the parabola with the following properties y = (-1/4)(x+3)^2 -1
What is the equation of the parabola?To find the equation of a parabola, we can use the formula f(x) = ax^2 + bx + c, where a, b and c are congruent vertices.
Alternatively, we can use PF = PM to find the equation of the parabola.
vertex is half way between the focus and directrix
It's a downward opening parabola, general form
y= a(x-h)^2 + k
where (h,k) = vertex= (-3,-1)
plug in another point on the parabola to solve for a which gives
am answer with either x coefficient = -1'/4 or =4 Check the math.
one or the other is right another point is the y intercept = 9a-1
Another point is directly to the right of the focus (-1, -2) It's 2 down from the directrix and 2 to the right of the focus, equidistant. plug that point into y= a(x+3)^2 -1 and solve for "a"
-2 = a((-1+3)^2 -1
-2 = 4a -1
4a = -
a = -1/4
The parabola is y = (-1/4)(x+3)^2 -1
Learn more about the equation of the parabola on https://brainly.com/question/4074088
#SPJ1
The factors of 16-y² are
Answer:
(4 + y)(4 - y)
Step-by-step explanation:
\(16 - {y}^{2} \\ \\ = {4}^{2} - {y}^{2} \\ \\ = (4 + y)(4 - y)\)
What is the correct decimal point placement for the product of 3.54 × 15.42? 54.5868 545.868 5458.68 54586.8
9514 1404 393
Answer:
54.5868
Step-by-step explanation:
The multiplicands each have 2 digits to the right of the decimal point, so the product will have 2+2 = 4 digits to the right of the decimal point. The correct placement is ...
54.5868
__
Another way to tell is that the product is in the neighborhood of 3·15 = 45, which is nowhere near 545 or 5458 or any higher value.
Answer: 54.5868
Since 3 x 15 is already 45, now we have to multiply the decimals, but we must put a point.
.54 x .42 = 9.5868
45 + 9.5868 = 54.5868.
Hope this helps!
Differentiate the function h(x) using the quotient rule.
h(x) =2x+5 /2--x
\(h'(x)=\frac{\frac{d}{dx}[2x+5] (2-x)-\frac{d}{dx}[2-x](2x+5) }{(2-x)^2}\\=\frac{2(2-x)-(-1)(2x+5)}{(2-x)^2} \\=\frac{4-2x+2x+5}{(2-x)^2}\\=\frac{9}{(2-x)^2} \\=\frac{9}{x^2-4x+4}\)
siete veces un número en expresión algebraica
In algebra, "seven times a number" is written as 7x, which is the multiplication of seven instances of the symbol x.
What is the formula for algebraic expressions?An equation that includes constants, variables, and a few algebraic operations is said to be algebraic. A good example of an algebraic expression is 3x2 2xy + d. So, three different types of fundamental building blocks make up an algebraic expression: Coefficient (i.e. numbers) (i.e. numbers)
A seven-times-a-number is represented by multiplying it by seven or adding it to another integer (since this is an abbreviated successive addition ).
If x is any number, then it may be written as follows seven times: Algebraic expressions (numbers or letters) are linked by fundamental operations including addition, subtraction, multiplication, and division in mathematical language.
To learn more about algebraic expression from given link
https://brainly.com/question/4541471
#SPJ1
Complete question -
Seven times a number in algebraic expression
What is the perimeter of the rectangle in the coordinate plane? y 36 units 15 147 38 units 13+ 12+ 65 units 117 O 70 units
Answer:
38 units
Step-by-step explanation:
14 * 2 = 28
5 * 2 = 10
28 + 10 = 38
Mark me as brainliest, I am trying to level up.
1. Scale 1 cm = 250 km
25
Using the scale above, calculate to find how
many km are in the following map distances:
a.) 2 cm =
km
b.) 5 cm
km
c.) 3 cm=
km
Answer:
a= 500km b= 1,250 c= 750
Step-by-step explanation:
a= 250x2=500km
b= 250x5=1,250km
c= 250x3=750km
PLZ HELP ASPPP PLZ I will mark your answer as brainlist
Answer:
a(-2,4) b(-4,2) c(-8,6) d(-6,8) these should be the answers
Evaluate the expression, writing the result as a simplified complex number.
To earn full credit be sure to show all steps and calculations. You may wish to do the work on paper and submit an image of that written work.
\frac{(2+i)(4-2i)}{1+i}
The simplified expression involving complex numbers is given as follows:
5 + 5i.
What are complex numbers?Complex numbers are number that have a real and an imaginary part, and are defined as follows:
z = a + bi.
In which:
a is the real part.b is the imaginary part.The basic relation of complex numbers is given as follows:
i² = -1.
The fraction for this problem is given as follows:
(2 + i)(4 - 2i)/(1 + i).
The numerator is simplified as follows:
(2 + i)(4 - 2i) = 8 - 4i + 4i - 2i² = 8 + 2 = 10.
Hence the fraction is of:
10/(1 + i).
To remove the complex number from the denominator, the entire fraction is multiplied by the conjugate of the denominator, hence:
10/(1 + i) x (1 - i)/(1 - i) = 10(1 + i)/(1 - i²) = 10(i + 1)/2 = 5 + 5i.
More can be learned about complex numbers at https://brainly.com/question/10662770
#SPJ1
Are all intersecting lines perpendicular? Draw a picture to help explain your answer
Not all intersecting lines are perpendicular.
What are perpendicular lines?Perpendicular lines require a 90-degree angle of intersection, creating the formation of right angles.
Nonetheless, unlike perpendicular lines that necessitate exactly 90 degrees of intersections, other types of driven lines can be at varying angles beside these.
As such, it is critical to highlight that in general intersecting lines come with different angles of intersection, and only those featuring exact 90-degree angle of intersection become normal cases of intersecting lines, becoming one among many subtypes existing today.
Learn more about perpendicular lines at
https://brainly.com/question/1202004
#SPJ1
The table shows the average number of pounds of trash generated per person per day in the United States from 1970 to 2010. Use the statistics calculator to calculate the mean and median. Round the answers to the nearest hundredth
Answer:
Table needed to help
Step-by-step explanation:
Mean vs Median
The mean (informally, the “average“) is found by adding all of the numbers together and dividing by the number of items in the set: 10 + 10 + 20 + 40 + 70 / 5 = 30.
The median is found by ordering the set from lowest to highest and finding the exact middle. The median is just the middle number: 20.
What fraction is not greater than 1/2? 7/8 4/6 3/5 2/5
Answer:this is so ez
Step-by-step explanation: 2/5
What is the distance between -13 and 13
Answer:
26
Step-by-step explanation:
-13+13=0
0+13=13
13+13=26
Tim is 35 years old. He is 7 years younger than 6 times his daughter's age. The equation,
6x - 7 = 35, where x equals his daughter's age, can be used to find the age of Tim's daughter. How
old is Tim's daughter?
Choose the correct answer below.
OA. 7 years old
OB. 9 years old
OC. 4 years old
OD. 8 years old
Answer:
A. 7 years old
Step-by-step explanation:
6x-7=35 is the equation.
Add 7 to both sides, which gives you 6x=42.
Then both sides by 6, so 6/6=x and 42/6=7
So, x=7.
Since x is his daughter's age, x=7, so his daughter is 7.
6x-7≈35
or,6x=35+7
or,6x≈42
or,x=42÷6
x≈7
1/4×10/12 simplest form
Answer:
10/48 - 2/24 - 1/12
Step-by-step explanation:
answer is 1/12
If the point A (5,10) was reflected over the x-axis, what would the new coordinates
be?
O (9,2)
O (5,-10)
O (8,7)
The new coordinates wil be (5,-10)
Plot (5, 10) on graph paper to understand. Imagine that point now reflecting or "flipping" over the x-axis. In this instance, it "flips the point down," moving the original point from the first quadrant to the fourth. The new y coordinate would be the "opposite" sign of the original but the x coordinate would remain unchanged. In light of this, the point is (5, -10)
The rule for reflection over the x-axis is
(x, y) → (x, - y)
Reflection over x-axis for (5,10) → (5,-10)
Coordinates are numerical lengths or angles that uniquely identify locations on two-dimensional (2D) surfaces or in three-dimensional (3D) space ( 3D ). Mathematicses, scientists, and engineers frequently employ a variety of coordinate systems.
Learn more about coordinate systems
https://brainly.com/question/4726772
#SPJ9
Rectangles abcd and klmn are similar. If their permitted are 20 and 16, and the area of the larger rectangle is 25, what is the area of the smaller rectangle?
The area of the smaller rectangle (KLMN) is 16.
Since rectangles ABCD and KLMN are similar, their corresponding sides are proportional.
Let's assume the length of side AB in rectangle ABCD is x, and the length of side KL in rectangle KLMN is y.
We can set up the proportion:
(x/y) = (20/16)
To find the area of the smaller rectangle, we need to determine the ratio of their areas.
Since the area of a rectangle is given by the product of its length and width, the ratio of the areas will be equal to the square of the ratio of their sides:
(Area of ABCD)/(Area of KLMN) = (x²)/(y²)
We are given that the area of ABCD is 25, so we have:
25/(Area of KLMN) = (x²)/(y²)
To find the area of KLMN, we need to substitute the values of x and y from the proportion:
25/(Area of KLMN) = (20/16)²
Simplifying the right side:
25/(Area of KLMN) = (5/4)²
25/(Area of KLMN) = 25/16
Cross-multiplying:
25 × 16 = 25 × (Area of KLMN)
400 = 25 × (Area of KLMN)
Dividing both sides by 25:
16 = Area of KLMN
Therefore, the area of the smaller rectangle (KLMN) is 16.
Learn more about similarity click;
https://brainly.com/question/26451866
#SPJ1
Bakeware, a bake, ware production company, has a production cost of $6 per round cake pan. Each round cake pan sells for $15. Bakeware's monthly fixed cost is $180,000.
A. Find the break-even quantity.
B. Find the break-even revenue.
C. Find the break-even point.
D. If the company produces and sells 15,000 pans, will this result in a profit or a loss?
E. If the company produces and sells 28,000 pans, will this result in a profit or a loss?
Answer:
your cheating
Step-by-step explanation:
stopppp
Write the equation of the line in slope-intercept form. The coefficients in the equation are b=4 and m=-5
Answer:
y = -5x + 4
Step-by-step explanation:
Slope-intercept form of the equation is:
y = mx + b
In the question, we are given m = -5 and b = 4.
Fill in the numbers for m and b.
The m tells you how steep the line is (the slope) And b tells you where the line crosses the y-axis (y-intercept).