Answer:
It must have an angle of exactly 24°.
Step-by-step explanation:
Answer:
It must have an angle of exactly 24°.
Step-by-step explanation:
I got a 100% on my mastery test
How much will you need to invest at 3% to have earned $900 in interest in 4 years?
Answer:
You will have earned $113 in interest.
Step-by-step explanation:
After investing for 4 years at 3% interest, your initial investment of $900 will have grown to $1,013.
To find the amount you need to invest, we can use the formula for simple interest:
\(\displaystyle\sf \text{{Interest}} = \text{{Principal}} \times \text{{Rate}} \times \text{{Time}}\)
Here, the principal is the amount you need to invest, the rate is 3% (or 0.03 as a decimal), and the time is 4 years. We can rearrange the formula to solve for the principal:
\(\displaystyle\sf \text{{Principal}} = \frac{{\text{{Interest}}}}{{\text{{Rate}} \times \text{{Time}}}}\)
Plugging in the given values, we get:
\(\displaystyle\sf \text{{Principal}} = \frac{{900}}{{0.03 \times 4}}\)
Simplifying further:
\(\displaystyle\sf \text{{Principal}} = \frac{{900}}{{0.12}}\)
Calculating the division:
\(\displaystyle\sf \text{{Principal}} = 7500\)
Therefore, you will need to invest $7500 at 3% to have earned $900 in interest in 4 years.
Give the domain and range of each of the following functions.
The domain and range of the functions are attached respectively
What is the domain and range of the functionsThe domain of a function is the set of all possible input values (also known as the independent variable) for which the function is defined. The range of a function is the set of all possible output values (also known as the dependent variable) that the function can produce for the given inputs.
a. The domain and range of the function is given as;
domain ; f(x) = (x - 10) / x(9 - x)
domain = (-∞, 0) ∪ (0, 9) ∪ (9, ∞)
range = (-∞, - (11 + 2√10) / 81] ∪ [- (11 - 2√10) / 81, ∞)
b. The domain and range of the function is given as;
domain ; g(x) = x - 4 /√(x² - 9)
domain = (-∞, -3) ∪ (3, ∞)
range = (-∞, 1)
Learn more on domain and range of function here;
https://brainly.com/question/2264373
#SPJ1
Can someone answer this
The order of the graphs from largest to lowest correlation coefficients is:
Graph D, Graph A, graph C, graph B.
Which graph has the largest correlation coefficient?The correlation coefficient between two variables is a coefficient that tells us "how much" these variables relate.
So, in the case for linear correlation, as "more linear" the data appears to be, a large correlation is between the two variables.
With that in mind, we conclude that the order of the graphs (going for larger correlation coefficient to smaller correlation coefficient) is:
Graph D, Graph A, graph C, graph B.
If you want to learn more about correlation:
https://brainly.com/question/4219149
#SPJ1
Evaluate:
226 (2n + 5) = [?]
Answer:
n=\frac{x-1130}{452}
Step-by-step explanation:
Answer:
452n + 1130 [I think ] because you distribute the 226 by the inside
z=x^{2} +y^{2} -4x-2y+9
Answer:
hello my name Nidhi, please mark me as brainliest bcoz I need it
1
A line has a slope of 5 and a y-intercept of -2
Answer:
1
Step-by-step explanation:
Answer:
(2/5,0)
Step-by-step explanation:
The equation to find a line is mx+b=y. In this case m is 5, and b is -2.
5x+-2=y
Since we want to find the x-intercept, y has to be 0.
So: 5x+-2=0
5x=2
x=2/5
Y=×
Shift left 2 units
The equation of the shifted line is y = x + 2
How to determine the transformationFrom the question, we have the following parameters that can be used in our computation:
y = x
Shift left 2 units
To shift the equation y = x to the left by 2 units, we can replace x with (x + 2) in the equation.
i.e. (x. y) = (x + 2, y)
So, we have the new equation to be y = x + 2
This is the same line as the original equation but shifted 2 units to the left.
Read more about transformation at
https://brainly.com/question/4289712
#SPJ1
Please help! The question is in the image.
Answer:
Step-by-step explanation:
Expand & simplify
(x + 3) (x+ 1)
A college student earned $6000 during summer vacation working as a waiter in a popular restaurant.The student invested part of the money at 5% and the rest at 10%. If the student received a total of$440 in interest at the end of the year, how much was invested at 5%?
Answer
$3200
Step-by-step explanation
Variables
• x: amount of money invested at 5%
,• y: amount of money invested at 10%
The total amount of money invested is $6000, that is,
\(x+y=6000\text{ \lparen eq. 1\rparen}\)The interest, I, earned for an investment of P dollars at an interest rate of r in t years is calculated as follows:
\(I=Prt\)where r must be a decimal.
In the case of the amount of money invested at 5%, that is, r = 0.05 (=5/100), after t = 1 year, the interest is:
\(I=x\cdot0.05\cdot1=0.05x\)In the case of the amount of money invested at 10%, that is, r = 0.1 (=10/100), after t = 1 year, the interest is:
\(I=y\cdot0.1\cdot1=0.1y\)The student received a total of $440 in interest, then:
\(0.05x+0.1y=440\text{ \lparen eq. 2\rparen}\)Isolating y from equation 1:
\(\begin{gathered} x+y-x=6000-x \\ y=6000-x\text{ \lparen eq. 3\rparen} \end{gathered}\)Substituting equation 3 into equation 2 and solving for x:
\(\begin{gathered} 0.05x+0.1(6000-x)=440 \\ 0.05x+0.1\cdot6000-0.1x=440 \\ 600-0.05x=440 \\ 600-0.05x-600=440-600 \\ -0.05x=-160 \\ \frac{-0.05x}{-0.05}=\frac{-160}{-0.05} \\ x=3200 \end{gathered}\)O.5% as a fraction and decimal
Answer: As a fraction: 1/2
As a decimal: 0.005
Step-by-step explanation:
FRACTION:
To figure out how to write 0.5% as a fraction, all you need to know is that 0.5 = to a half, or 1/2 because 0.5 is half of 1.
DECIMAL:
0.5% as a decimal form is 0.005 because it is 1000 times less than 1, so you move the 0 3 times right.
what is the difference between 7 and 3
Answer:
4
Step-by-step explanation:
The difference between the numbers 7 and 3 is 4.
We have,
The given expression is solved by using subtraction.
The expression can be written as:
= 7 - 3
The difference between 7 and 3 is calculated by subtracting the smaller number (3) from the larger number (7):
= 7 - 3
= 4
Therefore,
The difference between the numbers 7 and 3 is 4.
Learn more about expressions here:
https://brainly.com/question/3118662
#SPJ6
Evaluate the function.
f(x) = -x2-12 find f(-3)
Determine the measure of the third angle in a triangle when the other two angles total 165 degrees.
Answer:
15
Step-by-step explanation:
180-15
Hello!
the sum of the angles in the triangle = 180°
so the 3rd angle = 180° - 165° = 15°
The answer is 15°What percentage of 225 is 20
The Solution:
We are asked to determine the percentage of 20 out of 225.
That is,
\(\frac{20}{225}\times100=\frac{20\times4}{9}=\frac{80}{9}=8.8889\approx8.889\text{\%}\)Therefore, the correct answer is approximately 8.889%
Further explanation:
20 out of 225 gives the fraction: 20/225
To write this as a percentage, you have to multiply by 100.
\(\frac{20}{225}\times100=8.8889\text{ \%}\)Calculate how many cups of butter your new recipe will need.
What is 1 and 1/2 cups x 1 and 1/2?
"3. Four relationships are given.
Relationship A: x 3 2 1 y 2 2/3 1 2 / 3 2/3 Relationship B: 2x=y
Relationship C: y=2+x
Relationship D: x 3 6 y 6 12 In which two relationships are the constant of proportionality 2?"
Answer:
B and D
Step-by-step explanation:
A - check to see IF the relationship is proportional by dividing each y by its associated x:
2 2/3 ÷ 3 = 8/9
1 2/3 ÷ 3 = 5/9
2/3 ÷ 3 = 2/9
none of these match, so not even proportional
B - CoP is the coefficient of x (2)
C - not proportional because of the +2
D - do the same as A
6/3 = 2
12/6 = 2
both are the same and equal to 2
Please help ASAP !!!!!!
Answer:
7 or 8
Step-by-step explanation:
7 when each member does at least one of the three,and 8 when some do neither of the three.
the frame of the tent is defined by a rectangular base and two parabolic arches that connect the opposite corners of the base. The graph of y=-0.18x^2+1.6x models the height can a child who is 4 feet tall walk under without bending over
The child who is 4 feet tall can walk under the tent without bending over, as the height of the tent at that point is greater than 4 feet.
1. Given equation: y = -0.1\(8x^2\) + 1.6x, where y represents the height of the tent and x represents the distance from the center of the tent.
2. We want to find the maximum height of the tent to determine if a 4-foot tall child can walk under it without bending over.
3. To find the maximum height, we need to determine the vertex of the parabolic equation.
4. The vertex of a parabola in the form y = a\(x^2\) + bx + c is given by the formula x = -b / (2a).
5. In our equation, a = -0.18 and b = 1.6. Plugging these values into the formula, we get x = -1.6 / (2 * -0.18).
6. Simplifying the expression, we find x = 4.44.
7. Now, substitute this value back into the equation to find the maximum height: y = -0.18 * (4.4\(4)^2\) + 1.6 * 4.44.
8. Evaluating the expression, we find y ≈ 4.32.
9. The maximum height of the tent is approximately 4.32 feet.
10. Since the child's height is 4 feet, the child can comfortably walk under the tent without bending over, as the height is greater than 4 feet.
11. Therefore, the child who is 4 feet tall can walk under the tent without bending over.
For more such questions on height, click on:
https://brainly.com/question/28990670
#SPJ8
Which function of x has a y-intercept of -5?
Answer:
\(y = - 3x - 5 \\ c = - 5\)
Ali used 2/7 of a foot of ribbon to attach a decoration to his rearview mirror. Now, he has 10/21 of a foot of ribbon left.
QUESTION: How much ribbon did Ali start with?
The quantity of ribbon that Ali started with was 16/21 feet, based on the mathematical operation of addition.
What are mathematical operations?The basic mathematical operations include addition, subtraction, division, and multiplication.
In the addition operation, two or more addends are added to obtain a result called the sum or total using the equation symbol (=) and the addition operand (+).
The quantity of ribbon attached to the rearview mirror = 2/7
The remaining quantity of ribbon after the attachment = 10/21
The quantity of ribbon Ali started with = 16/21 (2/7 + 10/21)
Thus, using the addition operation, we can conclude that Ali started with 16/21 feet of ribbon.
Learn more about mathematical operations at https://brainly.com/question/4721701
#SPJ1
What number line shows the approximate location of V5
The number line that shows approximately the location of √5 would the number line in option D.
What is a number line?A number line is defined as the expression that can be used to illustrate the position of a given number which show either it is a positive or a negative number with one at the middle.
The given value is thus;
= √5 = 2.236067977 = 2.2
From the chosen number line, the dark dot is just few points after 2.
Learn more about number line here:
https://brainly.com/question/24644930
#SPJ1
A full 17 oz bottle of spring water is leaking half of an ounce a minute into an empty bottle. How long will it take for the two bottles to have the same amount of water
Answer:
8.5 minutes
Step-by-step explanation:
the bottle will have leaked half into the 2nd bottle, meaning the 2nd bottle has half too
It will take 17 minutes for the two bottles to have the same amount of water.
What is unit rate?Something calculated for one is called unit rate.
Given that, A full 17 oz bottle of spring water is leaking half of an ounce a minute into an empty bottle.
To have same amount of water both the bottles will have 17/2 = 8.5 ounces of water in them,
Since, it takes a minute to leak or fill half of an ounce,
Therefore, one ounce will take 2 minutes.
Therefore, 8.5 ounces will take = 8.5×2 = 17
Hence, it will take 17 minutes for the two bottles to have the same amount of water.
Learn more about unit rate, click;
https://brainly.com/question/29781084
#SPJ5
"You only spend 29 cents a day for each $500 borrowed" is the part of the problem that tells you about
O A. Interest
OB. Rate of interest
OC. Time constraints
OD. Principal
Click to select your answer.
Answer:
Principal
Step-by-step explanation:
Given
\(Debt = \$500\)
\(Spent = 29\ cents\)
Required
Determine what the given parameters describe
Literally, the principal amount is the starting amount of anything and as seen in the given parameters, the starting amount is the debt which amounts to $500
Taking the options one after the other;
We can conclude that the given parameters do not talk about Interest, Rate of interest and Time constraint;
Hence, D. Principal answers the question.
The given parameters do not relate to interest
At a football game, 35% of people attending were supporting the home team, while 65% were supporting the visiting team. If 455 people attending the game supported the home team, what was the total number of people attending the game?
Answer:
1300 ppl
Step-by-step explanation:
35% = .35 in decimal
.35 x =455
x = 455/.35 = 1300 ppl
PLssssss help me with this question!!
Answer: a. equivalent b. not equivalent
c. equivalent d. not equivalent
Step-by-step explanation:
100 Points! Algebra question. Graph the function. Photo attached. Thank you!
The cost of each pound of grass seed is $6.
A graph of the solution for the cost of each pound of grass seed is shown below.
How to determine the cost of each pound of grass seed?In order to determine the cost of each pound of grass seed, we would assign a variable to the cost of each pound of grass seed and then translate the word problem into an algebraic linear equation.
Let the variable x represent the cost of each pound of grass seed.
Since Lori bought 3.6 pounds of grass seed and she was charged $22.90, including a tax of $1.30, an algebraic linear equation that best represent this situation is given by;
3.6x + 1.30 = 22.90
3.6x = 22.90 - 1.30
3.6x = 21.60
x = 21.60/3.6
x = $6.
In conclusion, we would sue an online graphing calculator to plot the solution for the cost of each pound of grass seed as shown in the image attached below.
Read more on solution and equation here: brainly.com/question/25858757
#SPJ1
Terry is the school swimming champion and has won several races. If the ratio of the number of times he's won to the number of races he has swum in is 2 : 3, how many races has he won?
The given information tells us that Terry's wins-to-races ratio is 2:3, but we cannot determine the exact number of races he has won without additional information about the total number of races he has participated in.
If the ratio of the number of times Terry has won to the number of races he has swum in is 2:3, we can set up a proportion to determine the number of races he has won.
Let's denote the number of times Terry has won as x, and the total number of races he has swum in as y. According to the given ratio, we have:
x/y = 2/3
To find the value of x, we need to solve for x when y is known. Since y represents the total number of races, we don't have that information in the given problem. Therefore, we cannot determine the exact number of races Terry has won without knowing the total number of races he has participated in.
The ratio tells us the relationship between the number of wins and the total number of races, but without knowing the denominator (total races), we cannot find a specific value for the numerator (number of wins). We can only determine the ratio between the two quantities.
for similar questions on races.
https://brainly.com/question/24181944
#SPJ8
If Kiri has 28 full-time members this month, how many part-time members does she need, according to your formula?
HELP ME !
A recipe for 24 muffins needs 3 cups of flour. The number of muffins you can make varies directly with the amount of flour.how many muffins Can you make with 5 cups of flour?
Answer:
40
Step-by-step explanation:
8 muffins=1 cup of flour.
8 muffins × 5 cups = 40
In 5 cups of flour 40 muffins can be made.
What is Unitary Method?The unitary technique involves first determining the value of a single unit, followed by the value of the necessary number of units.
For example, Let's say Ram spends 36 Rs. for a dozen (12) bananas.
12 bananas will set you back 36 Rs. 1 banana costs 36 x 12 = 3 Rupees.
As a result, one banana costs three rupees. Let's say we need to calculate the price of 15 bananas.
This may be done as follows: 15 bananas cost 3 rupees each; 15 units cost 45 rupees.
Given:
A recipe for 24 muffins needs 3 cups of flour.
So, in cup of flour the number of muffins can be made
= 24/3
= 8 muffins
and, In 5 cups of flour the number of muffins can be made
= 8 x 5
= 40 muffins
Learn more about Unitary Method here:
https://brainly.com/question/22056199
#SPJ2