What does it mean when earned value is above planned value?

Answers

Answer 1

Answer:

If the Earned Value is less than the Planned Value, you are behind schedule, and if the Earned Value is greater than the Planned Value, you are ahead of schedule. The Earned Value can be compared to the Actual Cost (AC) to determine whether you are above or below budget. An Example from Capital Project Management

Explanation:

Answer 2

Answer: more work has been completed than planed, and the task or project is ahead of schedule.

Explanation:

For the lower costs than planed you are ahead of schedule


Related Questions

The table below shows the prices for a consumer’s typical basket of goods. Assume 2014 is the base year.

2014 2016
Good Quantity Unit price Unit price
Gallons of gas 275 $3.15 $3.37
Wheels of cheese 10 20.00 23.00
What are the basket prices for 2014 and 2016? Give all answers to two decimals.
2014: $

2016: $


What is the CPI? Give all answers to two decimals.
2014:

2016:

Answers

The CPI (Consumer Price Index) is a measure of the average change in prices over time for a basket of goods and services.

What is CPI?

CPI stands for Consumer Price Index, a measure of inflation used by economists to measure the cost of goods and services. It is calculated by taking the price of a selected basket of goods and services and comparing it to the price of the same basket in a previous period. This comparison is used to measure the changes in prices for consumers over time, and it is used to determine the rate of inflation.

To calculate the CPI, one would need to know the cost of the same basket of goods and services in multiple years. Since the table only provides the prices for 2014 and 2016, it is not possible to calculate the CPI.

To learn more about CPI

https://brainly.com/question/14762175

#SPJ1

What is market environment

Answers

Answer:

The market environment is the combination of external and internal factors that affect a company's ability to establish a relationship with and serve its consumers.

Explanation:

The internal factors relate to the company itself, such as owners, workers, materials, components, etc.

The external factors are divided into macro and micro components. The macro component is the broad environment which includes societal forces that affect society as a whole. The micro component is task-related, which includes factors that influence the production, manufacturing and distribution of a product or service.

Slove 56 is 5 1/2% of what

Answers

For the mentioned problem, 56 is 5¹/₂ percent of 1018.08.

What is percent?

In mathematics, percentage is said to be a number or ratio expressed as a fraction of 100. It is commonly represented by the percent sign '%', but abbreviations such as 'pct.', 'pct', and 'pc' may also be used. Percentages are dimensionless numbers as they have no units of measure.

Percent may be calculated by dividing the value by the total and multiplying the result by 100. The equation used to calculate the percentage is (value/total) * 100%.

For the given question:

5¹/₂% = 11/2%

11/2% of x = 56

(11/200) × x = 56

x = 56 × (200/11)

x = 1018.08

To know more about percentage, visit:

https://brainly.com/question/13450942

#SPJ1

If you decide to take a break and go for a hike in order to focus less consciously on the creative process, which stage is the creative process are you experiencing?

Answers

Answer: Incubation

Explanation: In the incubation stage the person moves away from the problem and gives space to the mind to search for a solution. An example is going for a walk to relax your mind a bit and ideas flow better.

although a foreign exchange transaction can involve any two currencies, most transactions involve u.s. dollars on one side.
a. true
b. false

Answers

Answer:

B

Explanation:

Which of the following is true?
A. None of the above is true.
B. Free trade areas and customs unions do not conflict with either the most- favoured-nation or national treatment principles of the GATT. C .Free trade areas and customs unions are a violation of the most-favoured-nation principle, but were permitted by the contracting parties to the GATT so long as they created trade.
D. Free trade areas and customs unions are a violation of the national treatment principle, but were permitted by the contracting parties to the GATT so long as they created trade.​

Answers

Answer:

C.

Explanation:

In the context of the General Agreement on Tariffs and Trade (GATT), free trade areas and customs unions were seen as exceptions to the most-favored-nation (MFN) principle, which states that countries should not discriminate between their trading partners. Free trade areas and customs unions involve preferential treatment among member countries, which goes against the MFN principle.

However, the contracting parties to the GATT allowed for the creation of free trade areas and customs unions as long as they promoted trade and economic integration among member countries. These exceptions were made in recognition of the potential benefits that such arrangements could bring.

Therefore, option C accurately describes the stance on free trade areas and customs unions in relation to the GATT.

Let's says prices on average increase 6 percent each year. The State of Oregon allows rents to increase 7 percent each year (in nominal terms). Is the law allowing the rent to increase each year in real terms?

Question 10 options:

a)

Yes


b)

No


c)

Neither in nominal nor real terms

Answers

Answer:

a) Yes

Explanation:

An increase in real terms is when the real percentage increase in rent is a number greater than zero. The real rate is determined by subtracting the inflation rate from the nominal rate of interest.

Inflation refers to an increase in prices in the economy. If prices are increasing by 6 percent,  the inflation rate is also 6 percent.  The nominal rate of interest is the quoted rate. In this case, it is 7 percent.

The real rate of interest will be 7% - 6% = 1%.

Rent is increasing by a real rate of  1 percent per year.

businesses do not maximise outputs from the given inputs​

Answers

Answer:

Businesses that do not maximise outputs from the given inputs are inefficient, and probably have diseconomies of scale, the opposite of economies of scale, that ocurrs when output increases proportionally less than the inputs that are invested.

This situation arises as a result of an economic law, the law of diminishing retuns. According to this economic law, there is a point in the production process in which the use of additional units of input do not result in a proportional yield, in other words, when a business presents diminishing returns, the more inputs it adds, the less output grows in proportion to the inputs.

Need Help ASAP!
The more society consumes​ today,
A.
the more it consumes next year.
B.
the easier it will be to consume less in the future.
C.
the less society can consume in the future.
D.
the harder it will be to consume less in the future because people will find it hard to adjust to less.

Answers

Answer: D.
Explanation: If the society consume goods more today (goods are made of resources), the society will have less resources and it will hard for producers to produce goods and the suppliers will have to supply less,so it will be hard of consumers to adjust with the change.

Jessie's car broke down, and she needs to borrow money to pay for repairs. She wants to use her car as collateral for a short-term loan. This type of loan is called a ____.

A. title loan
B. line of credit
C. mortgage
D. payday loan

Answers

Jessie wants to use her car as collateral for a short-term loan. This type of loan is called a title loan.

What is title loan?

Title loan is the loan in which assets are required for the collateral, this loan is very popular because it takes very short span of time to get approvals from the financial institute and credit rating is not considered at the time of giving loan.

Thus, option A is correct.

For more details about title loan, click here:

https://brainly.com/question/27044570

#SPJ2

Letters with already formatted fonts and fields are called:

A. Files
B. Templates
C. Themes
D. Views

Answers

Answer: B. Templates

How is creative thinking similar to a child’s thinking? A. Neither process restricts itself to logical solutions. B. Both thought processes always come up with fresh ideas. C. Both thought processes are simplistic. D. Both thought processes are linear

Answers

Answer: D. Both thought processes are linear

Explanation: I think I'm not too certain.

Beverly Mills has decided to lease a hybrid car to save on gasoline expenses and to do her part to help keep the environment clean. The car she selected is available from only one dealer in the local area, but that dealer has several leasing options to accom-modate a variety of driving patterns. All the leases are for 3 years and require no money at the time of signing the lease. The first option has a monthly cost of $330, a total mileage allowance of 36,000 miles (an average of 12,000 miles per year), and a cost of $0.35 per mile for any miles over 36,000. The following table summarizes each of the three lease
options:
(See photos below)

Beverly Mills has decided to lease a hybrid car to save on gasoline expenses and to do her part to help

Answers

Beverly Mills has three leasing options to choose from. Each of these options differs in terms of the monthly cost, the total mileage allowance, and the cost for any miles over the set mileage allowance. Depending on her driving patterns, Beverly Mills can select the option that suits her the best.

Beverly Mills decided to lease a hybrid car to save on gasoline expenses and to do her part to help keep the environment clean. The car she selected is available from only one dealer in the local area, but that dealer has several leasing options to accommodate a variety of driving patterns.All the leases are for 3 years and require no money at the time of signing the lease.

The three lease options available to Beverly Mills are as follows:

Option 1:Monthly cost: $330Total mileage allowance: 36,000 miles (an average of 12,000 miles per year)Cost for any miles over 36,000: $0.35 per mile

Option 2:Monthly cost: $460Total mileage allowance: 45,000 miles (an average of 15,000 miles per year)Cost for any miles over 45,000: $0.45 per mile

Option 3:Monthly cost: $540Total mileage allowance: 60,000 miles (an average of 20,000 miles per year)Cost for any miles over 60,000: $0.55 per mile

Therefore, Beverly Mills has three leasing options to choose from. Each of these options differs in terms of the monthly cost, the total mileage allowance, and the cost for any miles over the set mileage allowance. Depending on her driving patterns, Beverly Mills can select the option that suits her the best.

For more such questions on allowance

https://brainly.com/question/14191260

#SPJ8

What was the opening price of Dow Jones Industrial Average on Dec 04, 2018 in the format of XXXXX.XX?

Answers

Answer:

$17,910.02

Explanation:

As per online search, the opening price was $17,910.02

Dow Jones Industrial Average (^DJI)

DJI - DJI Real-Time Price. Currency in USD

Summary

Time Period:

Dec 03, 2014 - Dec 05, 2014

Currency in USD

Download

Date      Open    High         Low  Close

Dec 03, 2014     17,880.90     17,924.15 17,855.59 17,912.62

Dec  04, 2014     17,910.02      17,937.96 1 7,814.81         17,900.10

What is a product market AND how do I choose a product market . Pls help quick!!!!

Answers

Answer:

Product markets typically contain groups of consumers that share a fairly specific need that only certain and closely related kinds of products or services can meet. In the case of smartphone users, for example, only phones with specific and more or less comparable capabilities can serve the needs of these consumers. In a product market, the capacity to serve the market is often predicated on the method. Only a company that produces smartphones can compete for this market, let alone hold an intrinsic advantage, because only that product suffices.

True or False: The claim that some people made in the popular press is not consistent with the model in this chapter. True False True or False: The change in the real exchange rate that resulted from the decline in the quality of U.S. products may increase our standard of living. True False

Answers

Answer: true, false

Explanation:

You are an underwriter for ABC Insurance. You receive a life insurance proposal for medical insurance with premium payment. The prospect disclosed that he had underwent a surgery to correct a cataract. As an underwriter what would be your decision with respect to this case?

Answers

do you want money i will give you

Suppose that the production function is y= 9k^0.5 N^0.5. With this production function, the marginal product of labor is MPN= 4.5K^0.5 N^-0.5. The capital stock is K= 25. The labor supply curve is NS= 100[(1-t)w]^2, where w is the real wage rate, t is the tax rate on labor income, and hence (1-t)w is the after-tax real wage rate.c.Suppose that a minimum wage of w=2 is imposed. If the tax rate on labor income, t, equals zero, what are the resulting values of employment and the real wage? Does the introduction of the minimum wage increase the total income of workers, taken as a group?

Answers

The resulting values for employment and the real wage are 70.3125 and $1.5811 per hour, respectively.

The introduction of the minimum wage does not increase the total income of workers taken as a group.

How to determine employment and real wage

To find the resulting values of employment and real wage, determine where the labor supply curve intersects the labor demand curve.

MPN =

\(4.5K^0.5 N^-0.5 = (9K N)^0.5 / (2KN)^0.5 = (9/2)^0.5 (K/N)^0.5 = w/P

\)

where P is the price of output, which we can assume is equal to 1.

This equation can be rearranged to solve for N:

N =

\((9/2) (K/w)^2\)

Plugging in K = 25 and w = 2, we get:

N =

\((9/2) (25/2^2) = 70.3125\)

To find the real wage, we can plug this value of N into the labor supply curve:

NS =

\(100[(1-t)w]^2 = 100(1-0)(2)^2\)

= 400

Since labor supply exceeds labor demand, the real wage will be bid down to the equilibrium level.

\((9/2)^0.5 (K/N)^0.5 = w/P

(9/2)^0.5 (25/N)^0.5 = 1/2

N = (9/2) (25/2^2) = 70.3125

w = 2(70.3125/100)^0.5 = 1.5811\)

The equilibrium real wage is $1.5811 per hour.

To determine whether the introduction of the minimum wage increases the total income of workers,

Total income before minimum wage = wN = 1.5811 x 70.3125 = $111.31

After the minimum wage of $2 is imposed, the real wage is fixed at $2, and the level of employment is determined by the intersection of the labor supply and demand curves at this wage:

N =

\((9/2) (25/2^2) / (2)^2 = 35.15625\)

Total income after minimum wage = wN = 2 x 35.15625 = $70.31

Since the total income of workers decreases from $111.31 to $70.31 after the minimum wage is imposed, the introduction of the minimum wage does not increase the total income of workers taken as a group.

Learn more on Real wage on https://brainly.com/question/1622389

#SPJ1

A preferred stock that pays an annual dividend of $10, has a par value of $100, and has a required return of 5% will be valued at $200. Group of answer choices True False

Answers

Answer:

The answer is true

Explanation:

Vo = D/Kp

Vo is the value of preferred stock/shares

D is the dividend

Kp is the cost of preferred stock/share

To confirm whether the value of stock is actually $200, we perform the following:

D = $10

Kp = 5% or 0.05

10/0.05

=$200.

The answer is true

Question 5: Definitions and concepts
• What is economic growth?
• What is economic development?
• Is economic growth a necessary condition for economic development? Explain with an example
• What are the differences between gross national Income and gross domestic product?

Answers

Answer:

Economic growth - an increase in the capacity of an economy to produce goods and services, compared from one period of time to another

Economic development - creation of wealth from which community benefits are realized, it is more than a jobs program, it's an investment in growing your economy and enchancing the prosperity and quality of life for all residents.

What is the purpose of a thesis?
A)It protects you against plagiarism.
B)It completes your outline.
C)It states what your paper will prove.
D)It organizes your first paragraph.

Answers

Answer:

C. It states what your paper will prove

Explanation:

Sorry if it wrong

One column of numbers consists of 33, 58, and 17. When the digits of the
numbers are added together, the result is 3+3+5+8+1+7=27, and when
the digits of 27 are then added together, the end result is 2 + 7 = 9. If the
same process is performed on the numbers in a second column, what can be
concluded?
OA. If the end result from the second column is also 9, then the sum of
the numbers in the first column is not equal to the sum of the
numbers in the second column.
OB. If the end result from the second column is not 9, then the sum of
the numbers in the first column is not equal to the sum of the
numbers in the second column.
OC. If the end result from the second column is not 9, then the sum of
the numbers in the first column is equal to the sum of the
numbers in the second column.
D. If the end result from the second column is also 9, then the sum of
the numbers in the first column is equal to the sum of the numbers
in the second column.

Answers

B. If the end result from the second column is not 9, then the sum of the numbers in the first column is not equal to the sum of the numbers in the second column.

This is because the process described (adding the digits of the numbers and then adding the digits of the result until a single digit is obtained) is essentially finding the digital root of the sum of the numbers in each column. If the digital roots of the two columns are different, then the sum of the numbers in the first column cannot be equal to the sum of the numbers in the second column.

In order to keep the government running smoothly and able to fund various programs, it must collect money. What is the MOST common way to do this?

host telethons to raise money

sell useful items for a profit

collect taxes from citizens

invest money in the stock market

Answers

Answer:collect taxes from citizens

Explanation:

Answer:

Collect taxes from citizens

Explanation:

Collecting taxes and fees is a fundamental way for countries to generate public revenues that make it possible to finance investments in human capital, infrastructure, and the provision of services for citizens and businesses.

El 5 de diciembre se solicitó un préstamo por USD.275,000, negociado al 6.5%
de interés anual a un plazo de 5 años. Los pagos de capital e intereses se harán
mensualmente.

Answers

hwbwbwjjwjwbwnabwjjwjwwjqnqnwnnwnwnwbwbwbwbbwwbbwhwbwbwbwbwbdbsnsnwjwnwn

How do dividends impact the value of a share of stock?

Answers

Answer:

How dividends affect stock prices is not a question for novice investors. It is possible and necessary to answer it - with a multi-page study, with an analysis of statistical data, consideration of historical situations as examples, and so on. However, novice investors still need to have at least a general idea of ​​​​the interaction between dividends and quotes, so we will try to consider this complex topic simply, briefly and as clearly as possible. Growth of dividends and its impact on quotes Let's start with the simplest situation. Suppose a company declares a high dividend for the past year. Let's say they turn out to be twice as high as expected. And the dividend yield at some point rose to, say, 10%. Then, and rightly so, stock prices will rise sharply in order to equalize the company's dividend yield with its competitors in the same country and industry. Most likely, the shares will not double in price, but will grow significantly in price.

Explanation:

Distribution of profits between investments and dividends But this will happen only in the most general case, if it means not only the growth of dividends, but also the profit from which they are paid. However, changes in the amount of dividends may not depend in any way on the current results of the company. Shares of PJSC Gazprom GAZP -15.61% YTD 295.89 price Invest It is quite possible that this year's profit is approximately equal to the results of the previous reporting period. But dividends change - they become more or less. Suppose an enterprise changes its dividend policy, which, for example, has recently happened among Russian energy companies. And one after another they decided that not 50% of their net profit should be directed to dividends, but only 25%. Theoretically, by reinvesting an additional quarter of free money in the business, the company should increase its share price. But in practice, they fell apart. Why? Payoffs vs Investments The answer to this question is obvious from one theory and contradictory to another. On the one hand, let's say, the closer the payment of money, the more it costs. Similarly, the shorter the term of the deposit, the lower the interest on it. Thus, the fall in quotations was influenced by the disappointment of investors: for them, the change in the dividend policy was a signal that money for their investments will be paid in the very near future in a smaller amount, the payback period for buying shares will increase significantly.But, on the other hand, the same energy companies, investing additional funds in the modernization of their business, should ensure revenue growth in the future, and the enterprises themselves should become more expensive. Therefore, at the new prices, after the decline, many institutional investors, on the contrary, declare their interest in acquiring these shares for their portfolios.

how do handle angry customers?

Answers

Answer:

Remain calm.Practice active listening.Repeat back what your customers say.Thank them for bringing the issue to your attention.Explain the steps you'll take to solve the problem.Set a time to follow up with them, if needed.Be sincere.Highlight the case's priority.

The night manager of Dixie Transportation Service, who had no accounting background, preparcd
the following balance sheet for the company at February 28, 2009.The dollar amounts were taken
directly from the company's accounting records and are correct. However, the balance shect con-tains a number of errors in its headings, format, and the classification of assets, liabilities, and owners equity.

The night manager of Dixie Transportation Service, who had no accounting background, preparcdthe following

Answers

To create an accurate and informative balance sheet, the night manager of Dixie Transportation Service should correct the headings, reformat the statement to present assets, liabilities, and owner's equity vertically, and classify the items correctly according to their nature and duration.

The provided balance sheet contains several errors in its headings, format, and classification of assets, liabilities, and owner's equity.

The balance sheet is a financial statement that reports a company's financial position at a specific point in time. However, the given balance sheet has a number of issues that need to be addressed.

Firstly, the balance sheet lacks proper headings, such as the company name, date, and the title "Balance Sheet." These headings are essential to provide context and clarity to the financial statement.

Secondly, the format of the balance sheet needs improvement. Assets, liabilities, and owner's equity should be presented in a vertical format, with assets listed first, followed by liabilities and owner's equity. The current presentation mixes these categories, making it difficult to distinguish between them.

Thirdly, the classification of assets, liabilities, and owner's equity is incorrect. The balance sheet fails to differentiate between current and non-current assets and liabilities.

Moreover, it does not provide separate categories for long-term liabilities and owner's equity components like common stock and retained earnings.

For more such questions on balance sheet

https://brainly.com/question/25225110

#SPJ11

Accounting and subsequently violates the covenant not to complete, what equitable remedy is available to big three accounting inc

Answers

Injunction equitable remedy is available to Big Three Accounting, Inc. Thus option D is correct.

What is Accounting?

Accounting is the act of documenting a business's monetary operations. All transactions are compiled, examined, and reported to factor in making, regulatory bodies, and tax collection organizations as part of the accounting cycle.

A lawsuit for an injunction is brought to court when someone infringes any contract clause relating to not competing. An equitable relief is where a court directs a party to carry out a certain act or desist from doing so. Therefore, option D is the correct option.

Learn more about Accounting , Here:

https://brainly.com/question/29108212

#SPJ1

After passing his CPA exam, Mohammad is hired by Big Three Accounting, Inc. Part of his contract includes a covenant not to compete. If, after working for three years, Mohammad retires from Big Three Accounting and subsequently violates the covenant not to compete, what equitable remedy is available to Big Three Accounting, Inc.?

a. Rescission O b. Specific Performance O c. Reformation O d. Injunction

AIOR
272

Marginal cost analysis data graph

Answers

Answer:

Explanation: that is a chert

An early frost destroys 20% of the coffee bean crop. If the supply and demand for coffee beans are both relatively inelastic, and the frost does not impact the quality of the coffee beans that make it to market.

Required:
What will most likely occur to the equilibrium price and quantity of coffee beans?

Answers

Answer:

Option C, Price will increase, quantity will decrease

Explanation:

The options for the given question are

(A) Price and quantity will both increase

(B) Price and quantity will both decrease

(C) Price will increase, quantity will decrease

(D) Price will decrease, quantity will increase

(E) Price will not change, quantity will decrease

Solution

Inelastic demand of a product means that the price (high or low) of the product does not affect the demand.

Since the frost destroys the crop, then there are probabilities of variation in the price of coffee (price will rise). Price will be increased to fetch the loss because of frost.

Price will increase and quantity will decrease.

Hence, option C is correct

Other Questions
Who was banned by congress from voting? Officials who represent their countrys government are known as _____.Immersive Reader A.refugees B.diplomats C.prisoners of war D.ethnic groups do nadiya ke beech me samvad The following table gives annual life insurance premiums per $1,000 of face value. Use the table to determine the annual premium for a $75,000 10-year term policy for a 25-year-old male. Round your answer to the nearest cent. A 5-column table with 6 rows titled Term Insurance. Column 1 is labeled Age with entries 20, 21, 22, 23, 24, 25. Column 2 is labeled 5-year term male with entries 2 dollars and 43 cents, 2.49, 2.55, 2.62, 2.69, 2.77. Column 3 is labeled 5-year term female with entries 2.07, 2.15, 2.22, 2.30, 2.37, 2.45. Column 4 is labeled 10-year term male with entries 4.49, 4.57, 4.64, 4.70, 4.79, 4.85. Column 5 is labeled 10-year term female with entries 4.20, 4.36, 4.42, 4.47, 4.51. a. $363.75 c. $183.75 b. $207.75 d. $338.25 Meteorologists recorded a temperature change from 72F to 28F in one day. Write an equation that represents how many degrees the temperature fell. Need help urgent!What are the points for this table using the equation: 50x+y=-100 Do coins are flipped 60 times, and the outcomes are recorded in the table. For which outcome was experimental probability close to the theoretical probability? explain the use of chemical and physical properties in the development of the periodic table activity Convert each of mixed number to an improper fraction please help, im literally so tired What is the value for X? Help please Ill put you as brainliest solve for[tex]5^{3x-2} = 7^{x+2}[/tex] There in the meadow, by the river side, A Flock of Nymphs chanced to espy , All lovely Daughters of the Flood thereby, With goodly greenish locks loose untied, As each had been a Bride, And each one had a little wicket basket Made of fine twigs entrailed curiously , In which they gathered flowers to fill their flasket: And with fine Fingers cropped full feateously The tender stalks on high Of every short which in the Meadow grew, They gathered some, the Violet pallid blew, The little Daisy that at evening closes , The virgin Lily, and the Primrose true, With a store of vermeil Roses To deck their Bridegrooms posies Against the Bridal day which was not long Sweet Thames run softly , till I end my song . Which sentence is the best summary of the stanza?A.) Along the Thames River, young women gather flowers for a wedding. B.) By the Thames River, young women hoping to marry the speaker pick flowers for him. C.)Young women gather violets, daisies, lilies, primrosesand roses in baskets D.)The speaker sees lovely young women in a meadow beside the Thames River. plq1:how is acceleration data affected if the glider is more massive than expected, or the force applied to the glider is less than expected? explain your reasoning. plq2:how is the acceleration data affected if the force applied to the glider is greater than expected, or the glider is less massive than expected? explain your reasoning. which of the enlightenment thinkers would agree with the idea that government should be divided into three branches? (a) An S-590 alloy component (following figure) must have a creep rupture lifetime of at least 100 days at 500C (773 K). Compute the maximum allowable stress level. (b) Consider an S-590 alloy component (Figure 8.32) that is subjected to a stress of 200 MPa (29,000 psi). At what temperature will the rupture lifetime be 500 h? (5 points) 103 T(20 + log tv)OR-h) 25 35 50 30 40 45 1000 100 Stress (MPa) 100 Stress (10 psi) 10 10 1 12 16 28 20 24 103 7(20 + log t)(K-h) How does the growth rate of G x compare to the growth rate of f X? What does the Selective Service Act say about the current military? It should be increased to maximum size. It should be equipped in small increments. It should have existing members discharged. It should have nineteen hundred and sixteen members. re-write the conclusion of the short story "The sidewalk bleeding"