Answer:
The cost variance is captured by the EVM variable known as CV, which measures the difference between the earned value and actual cost of work performed. This variable is a key indicator of project performance and can help identify areas where corrective action may be needed to keep the project on track.
Explanation:
explain the core functions of a computer
Answer:
There are four predominant functions of a computer. Inputting data and or instructions, processing, output, or grabbing data and or information, storing data and or information.
hope this helps :D
Which statement describes one of the responsibilities of a computer programmer?
A.
providing remote technical support to users
B.
installing, configuring, and monitoring network systems
C.
using computer-generated software to create special effects
D.
using coding languages to create software for retrieving data
E.
designing and implementing databases
Answer:
d i think
Explanation:
The ice starts on most hybrid electric vehicles when the state-of-charge of the hv battery drops to:
a. 40%
b. 50%
c. 60%
d. 70%
b. 50%
Hybrid Electric Vehicles (HEVs) and Electric Vehicles (EVs) rely on batteries to power the 12-volt electrical system. Rather than using the High Voltage (HV) battery to power these accessories, the auxiliary battery enables systems that require a constant voltage supply to remain operational.
Important Plug-In Hybrid Electric Car Charge Port Components:
2 points
1. Which characters are normally used to represent the root of the Floppy
disk drive? *
a) C1
b) A:
c) B:
d) D:
points
Answer:
B) A:
Explanation:
Formatting codes can be added to documents using a(n)_____, such as slashes // and angle brackets < >.
Using a delimiter like slashes or angle brackets, formatting codes can be applied to documents.
What are boundaries and shading mean?Word documents often utilize borders and shading to highlight specific passages of text and make them the reader's initial impression.
We can use Borders and Shading in MS Word to make written text, paragraphs, and other elements appear lovely and attractive.
Formatting codes can be used to apply formatting to documents using a delimiter like slashes or angle brackets.
In order to add formatting codes to documents, a delimiter like slashes or angle brackets can be used.
The complete question is:
Formatting codes can be added to documents using a ___ such as slashes and angle brackets
Learn more about the borders and Shading here:
https://brainly.com/question/1553849?
#SPJ1
what is the extension of a Microsoft access database 2013
Answer:
Access Database (2007, 2010, 2013, 2016)..accdb
Answer:
.accdb
Explanation:
.accdb is the extension of Microsoft Access Database 2013
In binary signaling, there is (are) ________ state(s). A. two B. between three and ten C. one D. an infinite number of
Your answer is letter A. 2.
Explanation: I have personal experience.
What type of access controls allow the owner of a file to grant other users access to it using an access control list
Answer:
Discretionary Access Control
Explanation:
The type of access controls allow the owner of a file to grant other users access to it using an access control list is Discretionary Access control.
What is discretionary access control?This is known to be a type of control that gives one a specific amount of access control to the use of the object's owner, or any other person.
Note that The type of access controls allow the owner of a file to grant other users access to it using an access control list is Discretionary Access control as it only gives a little access.
Learn more about Discretionary Access from
https://brainly.com/question/20038736
#SPJ2
OkkKkkkkkEYEYYEYEYEY BYEYYEYEYEyeeyeyyeEYEy if you know you know
Answer:
okkkkkkkkkkeyyyyyyy
Explanation:
byeeeee
For context-free grammar G4, E + E +T|T T → TxFF F → (E)|a Give BOTH parse trees and derivations for each string: a. a b. αXαXα +α C. a + a d. ((a))
The parse tree and leftmost derivation for each of the given statements. Here are the explanations for each:
a. A = (A + B) + C
Parse tree:
A
|
"="
|
"+"--C
|
"("
|
"+"
/ \
A B
Leftmost derivation:
A -> "=" -> "+" -> (A + B) + C
b. A = B + C + A
Parse tree:
A
|
"="
|
"+"
/ \
"+" A
/ \
B C
Leftmost derivation:
A -> "=" -> "+" -> B + C + A
c. A = A*(B + C)
Parse tree:
A
|
"="
|
"*"
/ \
A "+"
/ \
B C
Leftmost derivation:
A -> "=" -> "*" -> A*(B + C)
d. A = B * (C + (A + B))
Parse tree:
A
|
"="
|
"*"
/ \
B "+"
/ \
C "("
|
"+"
/ \
A B
Leftmost derivation:
A -> "=" -> "*" -> B * (C + (A + B))
To know more about parse tree visit :
brainly.com/question/12975724
#SPJ4
which camera effect is used to shoot tall buildings from close by without distortion
Answer:
the answer is ligma
Explanation:
Answer:
Tilt-shift lenses are a popular type of architecture photography lens
Explanation:
hope it helps
mark me brainliest
what is WiFi and MIFI in full
Answer:
Explanation:
WiFi ----- Wireless Fidelity
Mifi ------ My WiFi or Mobile WiFi
Hope this helps
plz mark as brainliest!!!!!!
Which statement will result in a compile-time error?
A. System.out.println(2/0*0);
B. System.out.println(2/0);
C. System.out.println(2+5);
D. System.out.println(0/0);
Answer:
A. System. out. println(2/0*0);
hope it help
please mark as brainliest
Which of the following is a country that cruise ships commonly sail under the flag of?
O United States
O Canada
O Panama
O South Africa
< Previous
Answer:
Panama
hope this helps!
Is the array parameter to your getaline method in hw2 an input or an output parameter or both?
In the context of the getaline method in hw2, the array parameter is an input parameter.
An input parameter is a value passed to a method or function that is used by the method to perform a computation. In this case, the array parameter is used by the getaline method to read a line of input from the user and store it in the array. However, it is important to note that the output of the getaline method is also stored in the array parameter. In other words, the array parameter is both an input and output parameter. After the getaline method is called, the array parameter will contain the user's input, which can then be used by the program in further computations.
It is common for parameters to serve as both input and output parameters in programming. This allows methods to modify the values of variables outside of their own scope, which can be useful in many different applications. In the case of the getaline method, the use of an input/output parameter allows the method to read user input and store it in a variable accessible to the rest of the program.
Learn more about array here: https://brainly.com/question/14375939
#SPJ11
+10 points~~~Which option is used in emails to inform the recipient that they should exercise discretion in accordance with sharing the content of the message?
priority levels
sensitivity levels
follow-up flags
attachment icons
Answer:
Sensitivity Levels
Explanation:
Sensitivity Level is option use in email to inform the recipient that they should exercise discretion in accordance with sharing the content of the message.
Answer:
its sensitivity levels on edge 2020
Explanation:
Which of the below would provide information using data-collection technology?
Buying a new shirt on an e-commerce site
Visiting a local art museum
Attending your friend's baseball game
Taking photos for the school's yearbook
The following statement would provide the information by utilising data-collection technology: Buying a new shirt on an e-commerce site.
What is data collection?
The process of obtaining and analysing data on certain variables in an established system is known as data collection or data gathering. This procedure allows one to analyse outcomes and provide answers to pertinent queries. In all academic disciplines, including the physical and social sciences, the humanities, and business, data collecting is a necessary component of research. Although techniques differ depending on the profession, the importance of ensuring accurate and truthful collection does not change. All data gathering efforts should aim to gather high-caliber information that will enable analysis to result in the creation of arguments that are believable and convincing in response to the issues that have been addressed. When conducting a census, data collection and validation takes four processes, while sampling requires seven steps.
To learn more about data collection
https://brainly.com/question/25836560
#SPJ13
Create a foreign agent advertisement message using 1672 as the sequence number and a lifetime of 4 h. Select your own values for the bits in the code field. Use at least three care-of addresses of your choice. Calculate and insert the value for the length field.
Foreign Agent Advertisement message using the provided parameters:
- Sequence Number: 1672
- Lifetime: 4 hours (14400 seconds)
- Code Field: (Assuming: R = 0, B = 1, H = 1, F = 0, M = 1, G = 0, V = 0, T = 0) = 01001000
- Care-of Addresses: 192.168.1.1, 192.168.2.1, 192.168.3.1
To calculate the length field, we must consider the base header size and the additional size added by the care-of addresses. The base header size is 12 bytes (1 byte for Type, 1 byte for Length, 2 bytes for Sequence Number, 2 bytes for Lifetime, 2 bytes for Registration Lifetime, and 4 bytes for each care-of address). Since there are three care-of addresses, this will add an additional 3 x 4 = 12 bytes. Therefore, the total length will be 12 + 12 = 24 bytes.
Foreign Agent Advertisement message:
- Type: 2 (Foreign Agent Advertisement)
- Length: 24 bytes
- Sequence Number: 1672
- Lifetime: 14400 seconds
- Code Field: 01001000
- Care-of Addresses: 192.168.1.1, 192.168.2.1, 192.168.3.1
To know more about Foreign Agent Advertisement visit:-
https://brainly.com/question/30727249
#SPJ11
Select the correct navigational path to create a PivotTable.
Select the range of cells.
Click the
tab on the ribbon and look in the
group.
Select the PivotTable option, make adjustments as needed, and click OK.
Answer:
insert and tables
Explanation:
took the test on edge
The correct navigational path for making a Pivot Table would be:
- Insert and Tables.
The appropriate way for creating a pivot table begins with a click made on the range table. This step is followed by moving to the insert option which will include the option of create. This create option would include selection of range and name of the table that is opted.
Thus, 'insert and tables' is the correct answer.
Learn more about "PivotTable" here:
brainly.com/question/18907447
how many tor relays are being operated by mit?
An exact number cannot be provided. However, these relays are operated by individuals or organizations who want to contribute to the network's privacy and anonymity features.
However, it is worth noting that Tor relays are nodes that volunteer to pass on traffic for the Tor network. These relays are operated by individuals or organizations who want to contribute to the network's privacy and anonymity features. Tor relays help to make it more difficult for anyone to trace the origin or destination of internet traffic, as well as prevent internet censorship and surveillance.
It is also worth mentioning that the number of Tor relays fluctuates constantly as new nodes are added and others are removed. The Tor network relies on a decentralized network of volunteers to operate these relays, which means that there is no central authority that can provide an exact number of relays being operated at any given time. In summary, while I cannot provide an exact number of Tor relays being operated by MIT, it is important to recognize the importance of these relays in the Tor network's operation and how they contribute to privacy and security online.
Learn more about network here: https://brainly.com/question/13105401
#SPJ11
Presentation slides should not have more than _____ bullet points.
Answer:
The answer is four
Explanation:
don't use more than four bullet points on any slide and will avoid using single bullet points on a slide.
unable to establish secure connection to zoom, what can do for case
Explanation:
1. check router
2.check app.
2.check subscription availability
Answer:
1. check router
2.check app.
2.check subscription availability
Give 3 reasons why it is believed that smart phones precent us from communicating face to face.give three reasons why it is believed that smartphones prevent us from communicating face to face
Answer:
yes
Explanation:
because the people will be lazy to go and talk to that person instead They will call each other and discuss
What is the HTML code symbol to the !nstagram Facts Part 2?
FIRST ONE GETS BRAINEST!!
¶^↑↓→← html code symbol
Unit 4: Lesson 2 - Coding Activity 1
Ask the user for two numbers. Print only the even numbers between them. You should also print the two numbers if they are even.
Starter code:
import java.util.Scanner;
public class U4_L2_Activity_One{
public static void main(String[] args){
Scanner scan = new
Scanner(System.in);
System.out.println("Enter two numbers:");
int num1 = scan.nextlnt();
int num2 = scan.nextlnt();
while (num1 <= num2){
if (num1 %2==0){
system.out.print(num1="");
}
num+=1;
}
}
}
The program illustrates the use of loops.
Loops are used to perform repetitive and iterative operations.
Aside few errors that can easily be corrected, the starter code you added to the question is not totally incorrect.
So, the corrected code is:
import java.util.Scanner;
public class U4_L2_Activity_One{
public static void main(String[] args){
Scanner scan = new Scanner(System.in);
System.out.println("Enter two numbers:");
int num1 = scan.nextInt();
int num2 = scan.nextInt();
while (num1 <= num2){
if (num1 %2==0){
System.out.print(num1+" ");
}
num1+=1;
}
}
}
The above program is the same as the starter code, you included.
I only made corrections to lines 6, 7, 9, 10 and 15
Read more about similar programs at:
https://brainly.com/question/19270993
Which specialized administrator would be responsible for the design, development, and support of DBMSs?
1. web administrator
2. security administrator
3. database administrator
4. system administrator
The specialized administrator responsible for the design, development, and support of DBMSs is the database administrator. Option 3 is the correct answer.
A database administrator (DBA) is responsible for managing and maintaining the database management systems (DBMSs) used in an organization. They play a crucial role in the design, development, and support of databases. DBAs handle tasks such as database design, data modeling, performance tuning, security management, backup and recovery, and ensuring data integrity. They work closely with developers, system administrators, and other stakeholders to ensure efficient and effective database operations.
Option 3 is the correct answer.
You can learn more about DBMSs at
https://brainly.com/question/13485235
#SPJ11
What are your strongest competencies? What will you do them?
❌NONSENSE ANSWER
Answer:
1. Teamwork
2. Responsibility
3. Commercial Awareness
4. Decision Making
5. Communication
6. Leadership
7. Trustworthiness & Ethics
8. Results Orientation
9. Problem Solving
10. Organisational skills
Given the following AHDL code, explain how this code "debounces" a pushbutton. If a key is pressed, input key_pressed is high; if no key is pressed, key_pressed is low. What happens when the key is not pressed? What happens when the key is pressed? Refer to parts of the code and be specific in your answer. SUBDESIGN debounce { clk, key_pressed: INPUT; strobe: OUTPUT; count [6..0]: DFF; count [].clk = clk; count [].clrn = key_pressed; IF (count [].q <= 126) & key_pressed THEN count [].d = count [].q+1; IF count [].q == 126 THEN strobe VCC; = ELSE strobe = GND; END IF; } VARIABLE BEGIN END;
When the key is not pressed, the code keeps the debounce counter in a reset state. When the key is pressed, the code increments the counter and checks if the debounce process is complete. Once the debounce process is complete, the strobe signal is set high to indicate a valid key press, otherwise, it remains low. This debounce mechanism helps in eliminating or reducing the effects of any noise or rapid transitions in the pushbutton input, ensuring accurate and reliable detection of key presses.
The given AHDL code implements a debounce mechanism for a pushbutton input. Debouncing is a technique used to eliminate or reduce the effect of rapid transitions or noise in the input signal when a pushbutton is pressed or released. It ensures that the output reflects the stable state of the input after it has settled.
The code defines a subdesign called "debounce" which takes the clock signal (clk) and the input signal from the pushbutton (key_pressed). It also has an output signal called "strobe" and a 7-bit register called "count" which serves as a debounce counter.
When the key is not pressed, the input signal key_pressed is low, which means the pushbutton is in an idle or released state. In this case, the code sets the clear input (clrn) of the count register to key_pressed, which clears the counter and keeps it in a reset state.
When the key is pressed, the input signal key_pressed becomes high. The code then increments the value stored in the count register by 1. The condition `IF (count[].q <= 126) & key_pressed` checks if the count value is less than or equal to 126 (indicating that the debounce process is ongoing) and if the key is still pressed. If this condition is true, the code assigns `count[].d = count[].q+1` to increment the count value by 1.
If the count value reaches 126 (indicating that the debounce process is complete), the code sets the strobe signal to VCC (high) to indicate a stable and valid key press. Otherwise, when the count value is less than 126, the strobe signal is set to GND (low) to indicate that the debounce process is still ongoing and the key press is not yet considered stable.
In summary, when the key is not pressed, the code keeps the debounce counter in a reset state. When the key is pressed, the code increments the counter and checks if the debounce process is complete. Once the debounce process is complete, the strobe signal is set high to indicate a valid key press, otherwise, it remains low. This debounce mechanism helps in eliminating or reducing the effects of any noise or rapid transitions in the pushbutton input, ensuring accurate and reliable detection of key presses.
Learn more about Output here,
https://brainly.com/question/27646651
#SPJ11
UTP is a ________. Group of answer choices type of translation network interface card type of wiring type of router
UTP is a type of wiring.UTP refers to unshielded twisted pair and is a type of wiring.UTP (Unshielded Twisted Pair) is a type of cabling made up of pairs of twisted wires that are not shielded.
It is often used in Ethernet networks and is regarded as the most common type of networking cable. It is capable of transmitting both data and voice messages.UTP cabling is classified into different categories, with Cat 5, Cat 5e, and Cat 6 being the most common. This refers to the quality of the cable and its ability to carry data.UTP cabling is also advantageous in that it is inexpensive, easy to install, and has a high level of performance.
It is often used in small and medium-sized businesses' LANs because it is both cost-effective and dependable.UTP cabling is ideal for network connections because it allows for reliable data transmission with minimal interference. It also has a lower probability of being affected by electromagnetic interference (EMI) and radio frequency interference (RFI) because it is not shielded.
Learn more about Cabling here,List some of the key benefits of a structured cabling plan.
https://brainly.com/question/29235583
#SPJ11
Which of the following actions is most likely to raise legal or ethical concerns?
Answer:
arson, kidnapping, gun fighting
Explanation: